| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$20,000.00 |
$75,000.00 |
$27,100.00 |
$66,425.00 |
$32,520.00 |
$86,737.50 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 62,311 | CY |
$6.25 |
$6.00 |
$10.00 |
$9.80 |
$7.80 |
$9.80 |
$11.03 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 839 | CY |
$12.00 |
$9.00 |
$20.00 |
$14.10 |
$10.00 |
$14.10 |
$15.86 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$40,000.00 |
$26,858.15 |
$45,000.00 |
$41,000.00 |
$54,000.00 |
$50,625.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,690 | LF |
$2.00 |
$1.22 |
$2.79 |
$1.30 |
$1.25 |
$2.22 |
$1.37 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,180 | LF |
$8.00 |
$5.48 |
$7.51 |
$5.75 |
$5.65 |
$5.48 |
$6.17 |
| 7 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 16 | CY |
$70.00 |
$80.00 |
$120.77 |
$150.00 |
$180.00 |
$26.00 |
$140.63 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 78,116 | SY |
$1.50 |
$1.18 |
$1.47 |
$1.25 |
$1.20 |
$1.18 |
$1.33 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 17 | AC |
$500.00 |
$388.00 |
$482.34 |
$410.00 |
$400.00 |
$388.00 |
$436.50 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 17 | AC |
$500.00 |
$195.00 |
$242.42 |
$205.00 |
$200.00 |
$195.00 |
$219.38 |
| 11 | 241 2832 |
MOWING | 34 | AC |
$80.00 |
$78.00 |
$96.97 |
$82.00 |
$80.00 |
$78.00 |
$87.75 |
| 12 | 303(A) 2200 |
(SP)AGGREGATE BASE TYPE A, PLANT MIXED | 5,084.5 | CY |
$65.00 |
$49.50 |
$45.94 |
$52.65 |
$58.00 |
$52.65 |
$59.23 |
| 13 | 307(K) 4300 |
STABILIZED SUBGRADE | 24,554.7 | SY |
$6.00 |
$5.75 |
$7.34 |
$5.05 |
$6.25 |
$5.05 |
$5.68 |
| 14 | 310(B) 0149 |
SUBGRADE, METHOD B | 5,706.6 | SY |
$2.50 |
$1.50 |
$1.75 |
$0.9500 |
$4.00 |
$0.9500 |
$0.9500 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 27,818.9 | SY |
$1.50 |
$1.50 |
$1.15 |
$1.05 |
$1.80 |
$1.05 |
$1.18 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 4,947.5 | TON |
$26.00 |
$22.00 |
$20.49 |
$22.20 |
$22.50 |
$22.20 |
$24.98 |
| 17 | 407(B) 0250 |
TACK COAT | 2,465.6 | GAL |
$3.00 |
$2.95 |
$3.50 |
$2.95 |
$3.10 |
$2.95 |
$3.32 |
| 18 | 408 5774 |
PRIME COAT | 14,329 | GAL |
$6.00 |
$3.75 |
$4.00 |
$3.75 |
$5.90 |
$3.75 |
$4.22 |
| 19 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 2,025.2 | TON |
$81.00 |
$76.45 |
$90.00 |
$76.45 |
$97.00 |
$76.45 |
$86.01 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 7,134.2 | TON |
$75.00 |
$73.30 |
$85.00 |
$73.30 |
$87.00 |
$73.30 |
$82.46 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,440.7 | TON |
$95.00 |
$81.60 |
$95.00 |
$81.60 |
$105.00 |
$81.60 |
$91.80 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,254.3 | TON |
$90.00 |
$80.60 |
$90.00 |
$80.60 |
$101.00 |
$80.60 |
$90.68 |
| 23 | 412 5267 |
COLD MILLING PAVEMENT | 400 | SY |
$9.00 |
$17.85 |
$23.81 |
$17.85 |
$29.00 |
$18.85 |
$20.08 |
| 24 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 8,844 | LF |
$0.7000 |
$0.5100 |
$0.2400 |
$0.6500 |
$0.2000 |
$0.6500 |
$0.8400 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 96.4 | CY |
$275.00 |
$425.00 |
$345.26 |
$532.50 |
$335.00 |
$532.50 |
$599.06 |
| 26 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 100.8 | TON |
$40.00 |
$50.00 |
$54.32 |
$70.80 |
$32.00 |
$70.80 |
$79.65 |
| 27 | 609(A) 5864 |
CONCRETE CURB (6" BARRIER-DOWELLED) | 812.5 | LF |
$15.00 |
$20.00 |
$19.66 |
$24.00 |
$21.00 |
$24.00 |
$27.00 |
| 28 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 99 | LF |
$67.00 |
$60.00 |
$128.63 |
$88.20 |
$75.00 |
$88.20 |
$99.23 |
| 29 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 1,238 | LF |
$22.00 |
$25.00 |
$54.48 |
$49.30 |
$37.00 |
$49.30 |
$55.46 |
| 30 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 156 | LF |
$36.00 |
$30.00 |
$60.02 |
$52.50 |
$44.00 |
$52.50 |
$59.06 |
| 31 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 10 | EA |
$250.00 |
$375.00 |
$117.76 |
$420.00 |
$350.00 |
$420.00 |
$472.50 |
| 32 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 7 | EA |
$1,000.00 |
$1,200.00 |
$838.06 |
$1,435.00 |
$760.00 |
$1,435.00 |
$1,614.38 |
| 33 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 3 | EA |
$1,100.00 |
$1,600.00 |
$1,067.74 |
$1,295.00 |
$825.00 |
$1,295.00 |
$1,456.88 |
| 34 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 7 | EA |
$1,200.00 |
$1,400.00 |
$1,276.21 |
$1,490.00 |
$890.00 |
$1,490.00 |
$1,676.25 |
| 35 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 1 | EA |
$1,300.00 |
$3,500.00 |
$1,553.99 |
$1,625.00 |
$1,050.00 |
$1,625.00 |
$1,828.13 |
| 36 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$15,000.00 |
$16,432.21 |
$13,650.00 |
$15,100.00 |
$13,650.00 |
$15,356.25 |
| 37 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 12,969 | SY |
$3.00 |
$3.10 |
$4.14 |
$3.10 |
$3.10 |
$3.10 |
$3.49 |
| 38 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 672 | LF |
$3.00 |
$3.10 |
$4.36 |
$5.25 |
$5.25 |
$3.10 |
$3.94 |
| 39 | 619(C) 0924 |
SAWING PAVEMENT | 3,137 | LF |
$5.00 |
$4.00 |
$4.03 |
$2.20 |
$4.00 |
$2.20 |
$2.48 |
| 40 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 812.5 | LF |
$20.00 |
$15.00 |
$21.11 |
$17.60 |
$15.50 |
$15.00 |
$18.84 |
| 41 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,200.00 |
$2,000.00 |
$2,815.47 |
$2,180.00 |
$2,075.00 |
$2,000.00 |
$2,334.38 |
| 42 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,700.00 |
$1,920.00 |
$2,702.86 |
$1,695.00 |
$1,975.00 |
$1,920.00 |
$1,816.88 |
| 43 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,570 | LF |
$4.00 |
$7.30 |
$9.47 |
$5.25 |
$5.75 |
$7.30 |
$8.21 |
| 44 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 2,590 | LF |
$6.00 |
$7.50 |
$10.04 |
$5.60 |
$6.25 |
$7.50 |
$8.44 |
| 45 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 1 | EA |
$700.00 |
$1,000.00 |
$1,070.07 |
$595.00 |
$515.00 |
$1,000.00 |
$1,125.00 |
| 46 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 4 | EA |
$90.00 |
$72.00 |
$101.36 |
$105.00 |
$75.00 |
$72.00 |
$4.50 |
| 47 | 629(C) 4960 |
MAILBOX | 4 | EA |
$40.00 |
$28.00 |
$39.41 |
$26.25 |
$29.00 |
$28.00 |
$28.13 |
| 48 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 4 | EA |
$20.00 |
$18.00 |
$25.34 |
$10.50 |
$18.50 |
$18.00 |
$11.25 |
| 49 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 330 | CY |
$15.00 |
$25.00 |
$17.42 |
$24.15 |
$40.00 |
$20.00 |
$18.00 |
| 50 | 501(G) 6309 |
CLSM BACKFILL | 466 | CY |
$125.00 |
$155.00 |
$152.71 |
$157.50 |
$155.00 |
$150.00 |
$170.00 |
| 51 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 2,155 | LF |
$300.00 |
$300.00 |
$281.92 |
$294.00 |
$295.00 |
$250.00 |
$295.00 |
| 52 | 504(A) 1304 |
APPROACH SLAB | 421.6 | SY |
$225.00 |
$165.00 |
$181.46 |
$178.50 |
$160.00 |
$150.00 |
$185.00 |
| 53 | 504(B) 1305 |
SAW-CUT GROOVING | 3,706.7 | SY |
$5.00 |
$3.40 |
$4.48 |
$3.35 |
$3.75 |
$3.60 |
$4.25 |
| 54 | 504(C) 6250 |
SEALED EXPANSION JOINT | 147.6 | LF |
$300.00 |
$370.00 |
$244.41 |
$357.00 |
$195.00 |
$195.00 |
$345.00 |
| 55 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,667 | LF |
$85.00 |
$95.00 |
$88.94 |
$84.00 |
$65.00 |
$75.00 |
$105.00 |
| 56 | 506(A) 1322 |
STRUCTURAL STEEL | 406,150 | LB |
$2.10 |
$1.47 |
$1.25 |
$1.63 |
$1.52 |
$1.80 |
$1.85 |
| 57 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$2,500.00 |
$2,300.00 |
$2,080.87 |
$2,310.00 |
$1,950.00 |
$2,500.00 |
$2,800.00 |
| 58 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,500.00 |
$2,300.00 |
$2,080.87 |
$2,310.00 |
$1,950.00 |
$2,500.00 |
$2,800.00 |
| 59 | 509(A) 1326 |
CLASS AA CONCRETE | 968.2 | CY |
$550.00 |
$515.00 |
$579.36 |
$525.00 |
$575.00 |
$750.00 |
$565.00 |
| 60 | 509(B) 1328 |
CLASS A CONCRETE | 425.9 | CY |
$500.00 |
$515.00 |
$568.67 |
$556.50 |
$550.00 |
$750.00 |
$610.00 |
| 61 | 511(A) 1332 |
REINFORCING STEEL | 1,960 | LB |
$0.9000 |
$1.30 |
$0.9700 |
$1.58 |
$1.10 |
$0.9000 |
$1.10 |
| 62 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 281,790 | LB |
$1.10 |
$1.10 |
$0.9700 |
$1.18 |
$1.10 |
$1.00 |
$1.15 |
| 63 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,187 | LF |
$36.00 |
$30.00 |
$42.25 |
$42.00 |
$33.00 |
$35.00 |
$46.00 |
| 64 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,187 | LF |
$16.00 |
$20.00 |
$22.22 |
$17.85 |
$10.00 |
$20.00 |
$15.00 |
| 65 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 66 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 4,445 | SY |
$5.00 |
$3.00 |
$3.98 |
$2.85 |
$3.25 |
$3.20 |
$3.75 |
| 67 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 194 | LF |
$950.00 |
$635.00 |
$667.13 |
$73.50 |
$1,400.00 |
$2,500.00 |
$850.00 |
| 68 | 516(A) 6100 |
DRILLED SHAFTS 84" DIAMETER | 182 | LF |
$1,300.00 |
$1,080.00 |
$972.04 |
$997.50 |
$2,000.00 |
$3,000.00 |
$1,600.00 |
| 69 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$5,000.00 |
$2,700.00 |
$3,729.44 |
$3,150.00 |
$3,750.00 |
$3,000.00 |
$4,945.00 |
| 70 | 523(A) 6550 |
SEALER CRACK PREPARATION | 47.1 | LF |
$5.00 |
$3.00 |
$3.73 |
$42.00 |
$3.15 |
$3.00 |
$3.45 |
| 71 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$150.00 |
$100.00 |
$124.32 |
$210.00 |
$105.00 |
$100.00 |
$120.00 |
| 72 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,791 | TON |
$40.00 |
$35.00 |
$42.30 |
$34.65 |
$32.00 |
$35.00 |
$50.00 |
| 73 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 531 | TON |
$30.00 |
$25.00 |
$30.73 |
$25.20 |
$30.00 |
$30.00 |
$34.00 |
| 74 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 94 | LF |
$30.00 |
$30.00 |
$21.04 |
$36.75 |
$20.00 |
$25.00 |
$31.00 |
| 75 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 66 | LF |
$30.00 |
$20.00 |
$23.68 |
$26.25 |
$20.00 |
$25.00 |
$32.00 |
| 76 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$150,000.00 |
$222,000.00 |
$76,019.25 |
$257,500.00 |
$95,000.00 |
$125,000.00 |
$287,500.00 |
| 77 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 60 | SF |
$17.00 |
$15.00 |
$21.11 |
$16.80 |
$15.25 |
$15.00 |
$17.28 |
| 78 | 851(C) 8324 |
2" SQUARE TUBE POST | 66 | LF |
$10.00 |
$20.00 |
$28.15 |
$10.50 |
$20.50 |
$20.00 |
$10.80 |
| 79 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 51 | EA |
$27.00 |
$22.00 |
$30.97 |
$14.70 |
$22.25 |
$22.00 |
$15.12 |
| 80 | 853 9054 |
DELINEATORS(TYPE 2, CODE 2, FLEXIBLE) | 18 | EA |
$35.00 |
$34.00 |
$47.86 |
$37.80 |
$35.00 |
$34.00 |
$38.88 |
| 81 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 21,550 | LF |
$0.2000 |
$0.1600 |
$0.2300 |
$0.1200 |
$0.1700 |
$0.1600 |
$0.1200 |
| 82 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 70,000 | LF |
$0.3000 |
$0.0800 |
$0.1100 |
$0.0800 |
$0.0900 |
$0.0800 |
$0.0900 |
| 83 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 1,422 | EA |
$1.00 |
$0.6500 |
$0.9100 |
$0.6000 |
$0.6600 |
$0.6500 |
$0.5900 |
| 84 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,380 | LF |
$25.00 |
$24.00 |
$23.82 |
$27.55 |
$25.00 |
$24.00 |
$28.35 |
| 85 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 9,080 | LF |
$4.00 |
$2.50 |
$2.66 |
$3.15 |
$2.60 |
$2.50 |
$3.24 |
| 86 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,785 | SD |
$0.5000 |
$0.0200 |
$0.0300 |
$0.2500 |
$0.0300 |
$0.0200 |
$0.2700 |
| 87 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,800 | SD |
$1.30 |
$3.00 |
$4.22 |
$2.10 |
$3.05 |
$3.00 |
$2.16 |
| 88 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,240 | SD |
$1.50 |
$3.00 |
$4.22 |
$1.05 |
$3.10 |
$3.00 |
$1.08 |
| 89 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,050 | SD |
$0.7000 |
$0.0200 |
$0.0300 |
$0.2500 |
$0.0300 |
$0.0200 |
$0.2700 |
| 90 | 880(C) 8848 |
WING BARRICADES | 1,200 | SD |
$0.5000 |
$0.0500 |
$0.0700 |
$1.05 |
$0.0600 |
$0.0500 |
$1.08 |
| 91 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 21,990 | SD |
$0.2000 |
$0.0200 |
$0.0300 |
$0.1000 |
$0.0300 |
$0.0200 |
$0.1100 |
| 92 | 880(F) 8878 |
DRUMS | 25,055 | SD |
$0.2000 |
$0.0200 |
$0.0300 |
$0.1500 |
$0.0300 |
$0.0200 |
$0.1600 |
| 93 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 628 | SD |
$12.00 |
$10.00 |
$14.08 |
$21.00 |
$11.00 |
$10.00 |
$21.60 |
| 94 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,000.00 |
$39,750.00 |
$48,452.85 |
$75,000.00 |
$35,850.00 |
$100,000.00 |
$42,930.00 |
| 95 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$15,000.00 |
$3,107.86 |
$6,200.00 |
$2,375.00 |
$5,000.00 |
$4,320.00 |
| 96 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$15,000.00 |
$6,215.73 |
$18,500.00 |
$12,356.00 |
$20,000.00 |
$12,960.00 |
| 97 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$320,000.00 |
$570,000.00 |
$265,049.80 |
$502,000.00 |
$345,000.00 |
$360,000.00 |
$366,081.64 |