| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$22,400.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 23,747 | CY |
$6.00 |
$6.72 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 7,719 | CY |
$8.00 |
$11.20 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$29,886.08 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,725 | LF |
$1.75 |
$1.39 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 448 | LF |
$8.50 |
$7.40 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 1,384 | LF |
$1.60 |
$1.88 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 30,895 | SY |
$1.70 |
$1.43 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 11.07 | AC |
$500.00 |
$385.28 |
| 10 | 241 2832 |
MOWING | 22.14 | AC |
$90.00 |
$87.36 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,823 | CY |
$55.00 |
$64.80 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 18,951 | SY |
$5.00 |
$8.22 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 18,951 | SY |
$1.50 |
$1.78 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,788 | TON |
$40.00 |
$29.04 |
| 15 | 407(B) 0250 |
TACK COAT | 2,461 | GAL |
$6.50 |
$2.80 |
| 16 | 408 5774 |
PRIME COAT | 11,454 | GAL |
$7.00 |
$8.40 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,453 | TON |
$80.00 |
$94.36 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,022 | TON |
$90.00 |
$102.59 |
| 19 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 54 | CY |
$40.00 |
$16.80 |
| 20 | 509(A) 0319 |
CLASS AA CONCRETE | 167 | CY |
$500.00 |
$524.09 |
| 21 | 509(D) 0325 |
CLASS C CONCRETE | 275 | CY |
$320.00 |
$448.04 |
| 22 | 511(A) 0332 |
REINFORCING STEEL | 28,459 | LB |
$1.00 |
$0.9400 |
| 23 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 67 | TON |
$50.00 |
$48.19 |
| 24 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 416 | LF |
$65.00 |
$43.54 |
| 25 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 249 | LF |
$25.00 |
$28.00 |
| 26 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 83 | LF |
$25.00 |
$28.00 |
| 27 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 12 | EA |
$1,350.00 |
$1,746.17 |
| 28 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$1,000.00 |
$952.00 |
| 29 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$22,400.00 |
| 30 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 10,043 | SY |
$5.00 |
$4.70 |
| 31 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 96 | SY |
$5.00 |
$5.60 |
| 32 | 619(C) 0924 |
SAWING PAVEMENT | 56 | LF |
$3.00 |
$4.48 |
| 33 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,463 | LF |
$17.00 |
$18.76 |
| 34 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 6 | EA |
$950.00 |
$812.00 |
| 35 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,100.00 |
$2,548.00 |
| 36 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$1,400.00 |
$1,808.80 |
| 37 | 624(A) 4281 |
FENCE-STYLE WWF | 465 | LF |
$5.00 |
$4.37 |
| 38 | 624(B) 4466 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 2 | EA |
$650.00 |
$896.00 |
| 39 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 5,887 | LF |
$8.00 |
$4.14 |
| 40 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 3 | EA |
$75.00 |
$89.60 |
| 41 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$190.00 |
$201.60 |
| 42 | 629(C) 4960 |
MAILBOX | 8 | EA |
$35.00 |
$28.00 |
| 43 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 3 | EA |
$45.00 |
$20.16 |
| 44 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 42 | EA |
$10.00 |
$11.20 |
| 45 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$20.00 |
$17.25 |
| 46 | 501(G) 6309 |
CLSM BACKFILL | 304 | CY |
$150.00 |
$157.10 |
| 47 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 519 | LF |
$290.00 |
$292.76 |
| 48 | 504(A) 1304 |
APPROACH SLAB | 271.8 | SY |
$175.00 |
$168.87 |
| 49 | 504(B) 1305 |
SAW-CUT GROOVING | 837.8 | SY |
$5.00 |
$4.37 |
| 50 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 377 | LF |
$75.00 |
$102.71 |
| 51 | 506(A) 1322 |
STRUCTURAL STEEL | 600 | LB |
$4.00 |
$2.47 |
| 52 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$800.00 |
$753.31 |
| 53 | 509(A) 0319 |
CLASS AA CONCRETE | 214.5 | CY |
$550.00 |
$647.07 |
| 54 | 509(B) 0321 |
CLASS A CONCRETE | 69.2 | CY |
$600.00 |
$663.71 |
| 55 | 509(D) 1331 |
CLASS C CONCRETE | 8.8 | CY |
$450.00 |
$542.66 |
| 56 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 51,800 | LB |
$1.10 |
$1.14 |
| 57 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 960 | LF |
$28.00 |
$39.48 |
| 58 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 960 | LF |
$15.00 |
$13.80 |
| 59 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
| 60 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 661 | SY |
$4.00 |
$3.68 |
| 61 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 570 | TON |
$45.00 |
$37.95 |
| 62 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 120 | TON |
$40.00 |
$45.40 |
| 63 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$28.75 |
| 64 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 59 | LF |
$20.00 |
$28.75 |
| 65 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$109,250.00 |
| 66 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$20.00 |
$13.80 |
| 67 | 501(G) 6309 |
CLSM BACKFILL | 164 | CY |
$150.00 |
$157.10 |
| 68 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 837 | LF |
$205.00 |
$213.83 |
| 69 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$175.00 |
$168.93 |
| 70 | 504(B) 1305 |
SAW-CUT GROOVING | 1,157.9 | SY |
$5.00 |
$4.37 |
| 71 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 517 | LF |
$75.00 |
$102.71 |
| 72 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$4.00 |
$2.47 |
| 73 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$800.00 |
$742.98 |
| 74 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,500.00 |
$1,657.71 |
| 75 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$400.00 |
$675.00 |
| 76 | 509(A) 1326 |
CLASS AA CONCRETE | 274.6 | CY |
$550.00 |
$618.32 |
| 77 | 509(B) 1328 |
CLASS A CONCRETE | 115 | CY |
$600.00 |
$663.71 |
| 78 | 509(D) 1331 |
CLASS C CONCRETE | 8 | CY |
$450.00 |
$542.66 |
| 79 | 511(A) 1332 |
REINFORCING STEEL | 580 | LB |
$1.00 |
$1.07 |
| 80 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 82,570 | LB |
$1.10 |
$1.14 |
| 81 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 808 | LF |
$28.00 |
$38.64 |
| 82 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 808 | LF |
$15.00 |
$13.80 |
| 83 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
| 84 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 954.2 | SY |
$4.00 |
$3.68 |
| 85 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 165 | LF |
$900.00 |
$872.91 |
| 86 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$1,750.00 |
$7,705.00 |
| 87 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$4.00 |
$3.45 |
| 88 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$150.00 |
$115.00 |
| 89 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 790 | TON |
$45.00 |
$54.84 |
| 90 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 185 | TON |
$40.00 |
$45.40 |
| 91 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$28.75 |
| 92 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 48 | LF |
$20.00 |
$28.75 |
| 93 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$115,000.00 |
| 94 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,276 | SD |
$0.2000 |
$0.9600 |
| 95 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,943 | SD |
$0.8000 |
$0.9600 |
| 96 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,916 | SD |
$1.25 |
$0.9600 |
| 97 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,580 | SD |
$0.4500 |
$0.0200 |
| 98 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$1.00 |
$0.0200 |
| 99 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,800 | SD |
$0.2000 |
$0.3300 |
| 100 | 880(F) 8878 |
DRUMS | 4,320 | SD |
$0.2000 |
$0.0200 |
| 101 | 880(G) 8890 |
CHANNELIZER CONES | 8,280 | SD |
$0.2500 |
$0.0200 |
| 102 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 360 | SD |
$16.00 |
$5.50 |
| 103 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$190.00 |
$104.50 |
| 104 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 37.05 | SF |
$18.50 |
$25.30 |
| 105 | 851(C) 8324 |
2" SQUARE TUBE POST | 42 | LF |
$10.50 |
$8.80 |
| 106 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 37 | LF |
$12.50 |
$11.00 |
| 107 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 16,000 | LF |
$0.4000 |
$0.5000 |
| 108 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$42,930.00 |
| 109 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,780.00 |
| 110 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$300,000.00 |
$225,692.21 |