Bid tab 130360

Let Oct 17, 2013 · Division 7 · Comanche Sign up free

‹ Oct 2013 results

BRIDGE AND APPROACHES SH -17: OVER WHISKEY CREEK , 0.50 MILE WEST OF THE SH -65 JCT. PROJECT LENGTH = 0.586 MILE

Let date
Thursday, October 17, 2013
Contract
130360
J/P numbers
23297(04)
District
Division 7
County
Comanche
Highway
Limits
BRIDGE AND APPROACHES SH -17: OVER WHISKEY CREEK , 0.50 MILE WEST OF THE SH -65 JCT. PROJECT LENGTH = 0.586 MILE
Project number
STPY-116C(134)

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$3,779,154
1 IHC Scott, INC. Low bidder $3,833,094 +1.4%
2 EARTH BUILDERS, L.P. $4,037,116 +6.8% +5.3%
3 OBC, INC. $4,198,129 +11.1% +9.5%
4 HASKELL LEMON CONSTRUCTION CO. $4,350,265 +15.1% +13.5%
5 Allen Contracting, Inc. $4,570,486 +20.9% +19.2%

Bid tab: unit prices 90 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 IHC Scott, INC.#2 EARTH BUILDERS,…#3 OBC, INC.#4 HASKELL LEMON C…#5 Allen Contracti…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $35,000.00 $11,805.00 $150,000.00 $36,000.00 $36,000.00 $250,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION10,332CY $6.00 $14.10 $15.00 $9.00 $9.00 $22.00
3202(D) 0184 UNCLASSIFIED BORROW1,422CY $10.00 $22.20 $20.00 $15.00 $15.00 $25.00
4202(E) 0186 SELECT BORROW3,728CY $15.00 $28.80 $30.00 $15.00 $15.00 $30.00
5205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $30,000.00 $32,880.00 $20,000.00 $19,200.00 $19,200.00 $25,000.00
6221(C) 2801 TEMPORARY SILT FENCE5,940LF $2.00 $1.60 $1.90 $1.86 $2.40 $2.50
7221(F) 0100 TEMPORARY SILT DIKE300LF $8.00 $8.20 $9.00 $9.60 $12.00 $12.00
8221(G) 0150 TEMPORARY ROCK FILTER DAM TYPE 110CY $250.00 $256.50 $60.00 $270.00 $240.00 $300.00
9230(A) 2806 SOLID SLAB SODDING22,051SY $1.50 $1.40 $1.70 $1.62 $1.80 $2.00
10230(F) 2812 WATERING1,762KGAL $5.00 $6.15 $7.00 $7.20 $9.60 $10.00
11232(B) 2814 SEEDING METHOD B8AC $250.00 $359.00 $450.00 $420.00 $1,440.00 $1,500.00
12233(A) 2817 VEGETATIVE MULCHING8AC $350.00 $359.00 $450.00 $420.00 $960.00 $950.00
13241 2832 MOWING18AC $100.00 $102.50 $110.00 $120.00 $120.00 $115.00
14303(A) 2200 (SP)AGGREGATE BASE TYPE A, PLANT MIXED5,092CY $55.00 $57.20 $48.00 $51.13 $51.00 $60.00
15310(B) 0149 SUBGRADE, METHOD B10,000SY $3.50 $0.8100 $4.00 $4.80 $5.00 $1.50
16325 5271 SEPARATOR FABRIC16,165SY $1.25 $1.40 $1.50 $1.92 $1.25 $2.00
17326(B) 0100 GEOGRID REINFORCEMENT16,165SY $3.00 $1.55 $1.60 $1.95 $1.50 $2.00
18402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E1,799TON $27.00 $36.30 $34.00 $28.80 $29.00 $30.00
19407(B) 0250 TACK COAT2,549GAL $3.50 $3.10 $5.00 $3.60 $3.60 $3.50
20408 5774 PRIME COAT6,033GAL $5.00 $6.20 $8.00 $7.20 $7.20 $7.00
21411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)6,510TON $72.00 $74.80 $88.00 $86.70 $86.70 $95.00
22411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)1,563TON $82.00 $79.70 $100.00 $92.40 $92.40 $100.00
23509(A) 0319 CLASS AA CONCRETE148CY $450.00 $689.00 $450.00 $395.23 $581.00 $700.00
24509(D) 0325 CLASS C CONCRETE501CY $275.00 $320.50 $300.00 $441.00 $258.00 $300.00
25511(A) 0332 REINFORCING STEEL21,983LB $1.20 $0.5500 $1.00 $1.17 $1.70 $0.7500
26613(B) 0690 24" CORR. GALV. STEEL PIPE348LF $38.00 $49.70 $60.00 $33.60 $33.60 $50.00
27613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH78LF $50.00 $46.30 $65.00 $28.80 $28.80 $50.00
28613(J) 5915 EDGE DRAIN CONDUIT-PERFORATED2,650LF $15.00 $16.00 $20.00 $14.77 $14.40 $15.00
29613(K) 5916 EDGE DRAIN OUTLET LATERAL-NONPERFORATED80LF $13.00 $24.50 $20.00 $7.94 $14.40 $22.00
30613(M) 7186 TYPE A4 CULVERT END TREATMENT8EA $1,500.00 $1,423.00 $850.00 $1,114.23 $1,300.00 $1,300.00
31613(M) 7196 TYPE A6 CULVERT END TREATMENT8EA $1,700.00 $1,423.00 $1,000.00 $1,339.39 $1,500.00 $1,400.00
32613(Q) 5946 OUTLET LATERAL HEADWALL2EA $500.00 $539.50 $400.00 $420.00 $1,350.00 $350.00
33619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $150,000.00 $8,328.00 $70,000.00 $9,600.00 $130,000.00 $87,000.00
34619(B) 4728 REMOVAL OF ASPHALT PAVEMENT9,617SY $4.00 $5.85 $3.00 $5.10 $5.40 $6.00
35619(B) 4780 REMOVAL OF GUARDRAIL1,079LF $2.00 $2.30 $3.00 $2.70 $6.00 $5.00
36623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE863LF $25.00 $15.90 $19.00 $18.60 $18.60 $20.00
37623(G) 8590 GUARDRAIL END TREATMENT (31")2EA $2,700.00 $2,153.00 $2,800.00 $2,520.00 $2,500.00 $2,500.00
38623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,000.00 $1,487.00 $2,100.00 $1,740.00 $1,750.00 $1,800.00
39624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)1,336LF $4.00 $3.45 $5.00 $4.80 $4.80 $7.00
40629(A) 4958 MAILBOX INSTALLATION-SINGLE3EA $150.00 $88.40 $100.00 $102.00 $120.00 $100.00
41629(C) 4960 MAILBOX3EA $100.00 $26.00 $110.00 $30.00 $120.00 $30.00
42629(D) 4961 REMOVAL OF MAILBOX INSTALLATION3EA $50.00 $15.60 $60.00 $24.00 $60.00 $17.00
43853 9033 DELINEATORS(TYPE 2, CODE 1)23EA $15.00 $5.50 $25.00 $6.36 $24.00 $14.00
44501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON460CY $20.00 $20.60 $30.00 $42.00 $20.00 $20.00
45501(G) 6309 CLSM BACKFILL330CY $150.00 $121.50 $200.00 $173.84 $175.00 $130.00
46503(A) 6290 PRESTRESSED CONCRETE BEAMS (TYPE J BT)518.67LF $375.00 $301.50 $300.00 $318.83 $345.00 $400.00
47504(A) 1304 APPROACH SLAB281.2SY $250.00 $156.50 $155.00 $211.85 $215.00 $200.00
48504(B) 1305 SAW-CUT GROOVING848.5SY $5.00 $5.55 $5.00 $4.32 $9.00 $4.50
49504(C) 6250 SEALED EXPANSION JOINT41.75LF $375.00 $232.00 $190.00 $386.98 $395.00 $325.00
50504(D) 6245 CONCRETE RAIL (TR4)381.9LF $75.00 $147.00 $80.00 $115.70 $100.00 $130.00
51506(A) 1322 STRUCTURAL STEEL1,280LB $4.00 $4.10 $3.00 $4.02 $8.00 $4.00
52507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY4EA $3,000.00 $1,884.00 $2,000.00 $2,398.10 $3,250.00 $2,500.00
53507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY4EA $3,000.00 $1,884.00 $2,000.00 $2,398.10 $3,250.00 $2,500.00
54509(A) 1326 CLASS AA CONCRETE167.7CY $900.00 $906.00 $800.00 $767.23 $725.00 $1,100.00
55509(B) 1328 CLASS A CONCRETE216.8CY $800.00 $703.00 $900.00 $755.23 $925.00 $1,100.00
56509(D) 1331 CLASS C CONCRETE29CY $450.00 $1,570.00 $300.00 $629.15 $850.00 $900.00
57510(A) 6334 RETAINING WALL467SY $650.00 $907.00 $600.00 $1,082.87 $715.00 $750.00
58511(B) 6010 EPOXY COATED REINFORCING STEEL69,770LB $1.10 $1.40 $1.30 $1.23 $1.50 $1.10
59514(A) 6010 PILES, FURNISHED (HP 10X42)2,568LF $35.00 $22.30 $24.00 $36.34 $37.00 $30.00
60514(B) 6292 PILES, DRIVEN (HP 10X42)2,568LF $15.00 $53.40 $30.00 $30.00 $16.00 $17.00
61515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)752SY $5.00 $5.15 $4.50 $4.20 $8.75 $4.00
62516(A) 6090 DRILLED SHAFTS 24" DIAMETER280LF $300.00 $219.00 $200.00 $414.78 $315.00 $200.00
63516(A) 6097 DRILLED SHAFTS 66" DIAMETER152LF $1,100.00 $407.50 $750.00 $1,219.36 $860.00 $650.00
64516(C) 6200 CROSSHOLE SONIC LOGGING4EA $3,000.00 $923.00 $3,000.00 $1,680.00 $2,150.00 $1,200.00
65516(D) 6400 CSL ACCESS TUBES936LF $15.00 $15.40 $8.00 $11.76 $13.00 $12.00
66601(B) 1353 TYPE I-A PLAIN RIPRAP580TON $45.00 $51.50 $42.00 $37.36 $46.00 $50.00
67601(C) 1355 TYPE I-A FILTER BLANKET160TON $40.00 $42.20 $35.00 $28.88 $36.00 $40.00
68613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND84LF $30.00 $30.30 $25.00 $30.47 $40.00 $16.00
69613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.90LF $30.00 $24.50 $25.00 $30.47 $10.00 $25.00
70619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $50,000.00 $25,615.00 $100,000.00 $120,000.00 $300,000.00 $65,000.00
71823 8478 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM30SD $125.00 $208.00 $300.00 $240.00 $315.00 $350.00
72850(A) 8110 SHEET ALUMINUM SIGNS56.68SF $16.00 $26.00 $22.00 $30.00 $25.00 $29.00
73851(C) 8324 2" SQUARE TUBE POST140LF $6.50 $8.30 $9.00 $9.60 $10.00 $10.00
74854(A) 8800 TRAFFIC STRIPE(PAINT)(4" WIDE)14,000LF $0.5000 $0.1700 $0.2000 $0.1900 $0.2200 $0.2500
75871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.60SD $14.00 $14.40 $30.00 $10.80 $31.00 $11.00
76877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER660LF $10.00 $19.50 $25.00 $18.00 $36.00 $8.00
77877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER660LF $3.50 $7.50 $15.00 $3.00 $25.00 $8.00
78880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF9,450SD $0.5000 $0.1600 $0.3500 $0.1800 $0.4000 $0.2000
79880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF1,800SD $1.00 $0.1600 $1.00 $0.1800 $0.9500 $0.2000
80880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF960SD $1.20 $5.20 $3.00 $6.00 $2.80 $6.00
81880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)1,680SD $0.5000 $0.1000 $0.6500 $0.1200 $0.6300 $0.1500
82880(C) 8848 WING BARRICADES420SD $1.00 $5.20 $2.20 $6.00 $2.50 $6.00
83880(E) 8860 WARNING LIGHTS(TYPE A)3,840SD $0.1500 $0.0500 $1.00 $0.0600 $0.9500 $0.1000
84880(F) 8878 DRUMS600SD $0.1200 $0.2600 $1.00 $0.3000 $0.9500 $0.3000
85880(G) 8890 CHANNELIZER CONES3,960SD $0.7800 $0.0200 $0.9000 $0.0200 $0.9500 $0.0200
86882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN300SD $15.00 $26.00 $20.00 $30.00 $20.00 $30.00
87642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $33,000.00 $20,000.00 $25,000.00 $23,250.00 $25,000.00 $25,000.00
88220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $7,500.00 $15,000.00 $4,000.00 $6,000.00 $5,000.00 $3,000.00
89640(A) 1426 FIELD OFFICE1EA $10,000.00 $15,000.00 $25,000.00 $9,000.00 $7,500.00 $6,500.00
90641 1552 MOBILIZATION1LSUM $195,000.00 $195,000.00 $200,000.00 $216,515.10 $275,000.00 $240,000.00