| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$50,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 49,195 | CY |
$6.50 |
$4.53 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 249,687 | CY |
$6.75 |
$4.53 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$36,000.00 |
$42,508.72 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,818 | LF |
$2.70 |
$2.75 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,560 | LF |
$7.00 |
$7.75 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 58,523 | SY |
$2.00 |
$1.76 |
| 8 | 241 2832 |
MOWING | 25 | AC |
$95.00 |
$143.61 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,839 | CY |
$55.00 |
$51.94 |
| 10 | 307(D) 4230 |
LIME | 841 | TON |
$166.00 |
$189.01 |
| 11 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 34,250 | SY |
$4.00 |
$2.92 |
| 12 | 325 5271 |
SEPARATOR FABRIC | 24,876 | SY |
$1.35 |
$1.10 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,497 | TON |
$23.60 |
$24.55 |
| 14 | 407(B) 0250 |
TACK COAT | 515 | GAL |
$3.75 |
$4.36 |
| 15 | 408 5774 |
PRIME COAT | 9,943 | GAL |
$3.90 |
$5.28 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,465 | TON |
$80.00 |
$92.90 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,498 | TON |
$105.00 |
$94.70 |
| 18 | 413(C) 4868 |
RUMBLE STRIP-METHOD PCC-CON | 8,121 | LF |
$0.5000 |
$1.00 |
| 19 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 6,317 | SY |
$12.15 |
$10.92 |
| 20 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 11,731 | SY |
$18.80 |
$17.28 |
| 21 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 4,032 | CY |
$100.00 |
$120.97 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 16 | CY |
$275.00 |
$339.80 |
| 23 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 238 | LF |
$50.00 |
$44.91 |
| 24 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 312 | LF |
$60.00 |
$55.43 |
| 25 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 232 | LF |
$77.00 |
$72.97 |
| 26 | 613(B) 0688 |
12" CORR. GALV. STEEL PIPE | 46 | LF |
$30.00 |
$42.40 |
| 27 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 372 | LF |
$36.00 |
$48.97 |
| 28 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 252 | LF |
$50.00 |
$64.17 |
| 29 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 61 | LF |
$74.00 |
$134.77 |
| 30 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 6 | EA |
$1,115.00 |
$1,123.67 |
| 31 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 4 | EA |
$1,380.00 |
$1,289.68 |
| 32 | 613(M) 7202 |
TYPE BB6 CULVERT END TREATMENT | 4 | EA |
$2,700.00 |
$1,468.32 |
| 33 | 613(M) 7203 |
TYPE CC6 CULVERT END TREATMENT | 2 | EA |
$3,000.00 |
$1,746.31 |
| 34 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 4 | EA |
$550.00 |
$295.50 |
| 35 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 297 | CY |
$40.00 |
$76.84 |
| 36 | 613(V) 1180 |
TRENCH EXCAVATION | 1,386 | CY |
$8.50 |
$2.00 |
| 37 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$30,151.75 |
$30,000.00 |
| 38 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 11,731 | SY |
$4.90 |
$4.25 |
| 39 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 11,305 | SY |
$2.30 |
$3.77 |
| 40 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 450 | LF |
$3.50 |
$3.65 |
| 41 | 619(C) 0924 |
SAWING PAVEMENT | 148 | LF |
$5.00 |
$11.54 |
| 42 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 602 | LF |
$16.15 |
$19.23 |
| 43 | 623(E) 7113 |
BEAM GUARDRAIL TRANSITION SECTION | 4 | EA |
$2,500.00 |
$1,025.83 |
| 44 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$2,500.46 |
| 45 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 922 | LF |
$5.40 |
$10.90 |
| 46 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 182 | CY |
$13.00 |
$20.51 |
| 47 | 501(G) 6309 |
CLSM BACKFILL | 236 | CY |
$104.00 |
$142.97 |
| 48 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 526 | LF |
$200.00 |
$223.20 |
| 49 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 464 | LF |
$250.00 |
$397.93 |
| 50 | 504(A) 1304 |
APPROACH SLAB | 345.4 | SY |
$160.00 |
$165.19 |
| 51 | 504(B) 1305 |
SAW-CUT GROOVING | 1,460 | SY |
$5.00 |
$4.36 |
| 52 | 504(C) 6250 |
SEALED EXPANSION JOINT | 44.59 | LF |
$270.00 |
$235.20 |
| 53 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 656.44 | LF |
$70.00 |
$62.00 |
| 54 | 506(A) 1322 |
STRUCTURAL STEEL | 2,200 | LB |
$4.50 |
$3.73 |
| 55 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$2,400.00 |
$1,675.33 |
| 56 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 8 | EA |
$2,400.00 |
$1,675.33 |
| 57 | 509(A) 1326 |
CLASS AA CONCRETE | 324.9 | CY |
$500.00 |
$637.29 |
| 58 | 509(B) 1328 |
CLASS A CONCRETE | 241 | CY |
$500.00 |
$390.92 |
| 59 | 510(C) 6138 |
SLOPE WALL (5") | 628 | SY |
$74.00 |
$93.51 |
| 60 | 511(A) 1332 |
REINFORCING STEEL | 854 | LB |
$1.00 |
$0.9200 |
| 61 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 138,957 | LB |
$1.10 |
$1.00 |
| 62 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 144 | LF |
$50.00 |
$23.96 |
| 63 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 594 | LF |
$57.00 |
$33.86 |
| 64 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 144 | LF |
$22.50 |
$205.50 |
| 65 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 594 | LF |
$20.00 |
$39.95 |
| 66 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,306 | SY |
$3.75 |
$4.49 |
| 67 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 94 | LF |
$800.00 |
$1,096.53 |
| 68 | 523(A) 6550 |
SEALER CRACK PREPARATION | 44 | LF |
$5.00 |
$5.13 |
| 69 | 523(B) 6560 |
SEALER RESIN | 0.5 | GAL |
$140.00 |
$128.23 |
| 70 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 186 | LF |
$17.00 |
$23.99 |
| 71 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 80 | LF |
$16.00 |
$12.13 |
| 72 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$115,000.00 |
$22,199.06 |
| 73 | 624(E) 4294 |
FENCE-STYLE CLF (8'HIGH, CLASS A) | 236 | LF |
$28.00 |
$112.84 |
| 74 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 88.38 | SF |
$12.00 |
$12.82 |
| 75 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 126 | LF |
$10.00 |
$8.98 |
| 76 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$6.00 |
$15.39 |
| 77 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 21,304 | LF |
$0.5200 |
$0.4700 |
| 78 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 12,256 | LF |
$0.1600 |
$0.0600 |
| 79 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,430 | SD |
$0.2200 |
$1.28 |
| 80 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,670 | SD |
$0.5600 |
$1.28 |
| 81 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,655 | SD |
$1.10 |
$1.28 |
| 82 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 890 | SD |
$0.6800 |
$2.56 |
| 83 | 880(C) 8848 |
WING BARRICADES | 1,360 | SD |
$0.5800 |
$0.1900 |
| 84 | 880(C) 8850 |
PERMANENT BARRICADE UNIT | 2 | EA |
$830.00 |
$128.23 |
| 85 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,370 | SD |
$0.1700 |
$1.28 |
| 86 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 9,630 | SD |
$0.0300 |
$0.0400 |
| 87 | 880(F) 8878 |
DRUMS | 9,630 | SD |
$0.1000 |
$0.6400 |
| 88 | 880(I) 8902 |
FLAGGER | 30 | SD |
$130.00 |
$197.47 |
| 89 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,000.00 |
$55,561.04 |
| 90 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,205.71 |
| 91 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$3,846.85 |
| 92 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$290,000.00 |
$214,972.12 |