| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$40,000.00 |
$14,500.00 |
$15,442.50 |
$27,050.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 82,957 | CY |
$5.00 |
$8.02 |
$9.00 |
$8.00 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 10,000 | CY |
$15.00 |
$4.63 |
$5.00 |
$8.00 |
| 4 | 202(D) 0184 |
UNCLASSIFIED BORROW | 28,434 | CY |
$10.00 |
$6.14 |
$6.54 |
$8.00 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$59,700.00 |
$85,000.00 |
$47,600.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 7,767 | LF |
$2.00 |
$1.22 |
$1.30 |
$1.30 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 552 | LF |
$8.00 |
$7.02 |
$7.48 |
$7.45 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 115,183 | SY |
$1.65 |
$1.46 |
$1.65 |
$1.55 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 12 | AC |
$850.00 |
$508.00 |
$541.02 |
$539.20 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 12 | AC |
$850.00 |
$545.00 |
$580.43 |
$578.40 |
| 11 | 241 2832 |
MOWING | 48 | AC |
$100.00 |
$92.00 |
$97.98 |
$97.65 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 8,021 | CY |
$45.00 |
$77.30 |
$82.00 |
$104.50 |
| 13 | 317 4270 |
CEMENT TREATED BASE | 51,658 | SY |
$13.75 |
$14.00 |
$12.64 |
$14.45 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 98,443 | SY |
$2.00 |
$1.30 |
$1.40 |
$1.90 |
| 15 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 66,103 | SY |
$3.00 |
$1.40 |
$1.22 |
$1.85 |
| 16 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 11,447 | TON |
$38.00 |
$25.00 |
$18.00 |
$45.25 |
| 17 | 407(B) 0250 |
TACK COAT | 1,754 | GAL |
$3.00 |
$4.60 |
$4.30 |
$4.95 |
| 18 | 408 5774 |
PRIME COAT | 34,811 | GAL |
$4.00 |
$2.50 |
$1.50 |
$7.45 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,628 | TON |
$85.00 |
$95.55 |
$93.52 |
$102.90 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,369 | TON |
$95.00 |
$102.45 |
$98.00 |
$110.30 |
| 21 | 412 5267 |
COLD MILLING PAVEMENT | 26,891 | SY |
$1.60 |
$1.50 |
$1.30 |
$2.20 |
| 22 | 413(C) 4868 |
RUMBLE STRIP-METHOD PCC-CON | 24,608 | LF |
$0.1900 |
$0.2500 |
$0.3100 |
$0.2700 |
| 23 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 15,715 | SY |
$12.00 |
$13.50 |
$13.00 |
$12.35 |
| 24 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 53,861 | SY |
$15.00 |
$17.00 |
$18.00 |
$12.30 |
| 25 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 17,433 | CY |
$105.00 |
$105.00 |
$115.00 |
$100.70 |
| 26 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 125 | CY |
$12.00 |
$20.00 |
$15.76 |
$38.85 |
| 27 | 509(A) 0319 |
CLASS AA CONCRETE | 437 | CY |
$400.00 |
$460.00 |
$452.63 |
$1,175.00 |
| 28 | 509(D) 0325 |
CLASS C CONCRETE | 746 | CY |
$275.00 |
$235.00 |
$292.88 |
$255.30 |
| 29 | 511(A) 0332 |
REINFORCING STEEL | 65,824 | LB |
$0.8500 |
$0.8000 |
$1.15 |
$1.50 |
| 30 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 167 | TON |
$45.00 |
$50.00 |
$47.46 |
$62.15 |
| 31 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 216 | LF |
$50.00 |
$62.30 |
$66.35 |
$62.60 |
| 32 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 80 | LF |
$80.00 |
$79.00 |
$84.14 |
$78.75 |
| 33 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 456 | LF |
$25.00 |
$21.30 |
$22.68 |
$49.65 |
| 34 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 46 | LF |
$35.00 |
$25.60 |
$27.26 |
$53.90 |
| 35 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 6 | EA |
$900.00 |
$1,200.00 |
$1,224.75 |
$1,325.00 |
| 36 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$1,100.00 |
$1,500.00 |
$1,371.72 |
$1,620.00 |
| 37 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$2,000.00 |
$1,885.05 |
$1,885.00 |
| 38 | 613(U) 0600 |
BORE & JACK 42" CASING | 138 | LF |
$700.00 |
$1,200.00 |
$370.40 |
$472.80 |
| 39 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$6,500.00 |
$6,922.50 |
$60,800.00 |
| 40 | 619(B) 0291 |
REMOVAL OF HEADWALL | 14 | EA |
$500.00 |
$600.00 |
$1,347.96 |
$1,535.00 |
| 41 | 619(B) 4725 |
REMOVAL OF FENCE | 5,892 | LF |
$1.50 |
$1.00 |
$2.48 |
$1.30 |
| 42 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 17,440 | SY |
$3.50 |
$2.40 |
$2.56 |
$3.85 |
| 43 | 619(C) 0924 |
SAWING PAVEMENT | 26,127 | LF |
$2.50 |
$3.00 |
$2.39 |
$2.95 |
| 44 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 3,143 | LF |
$3.50 |
$3.22 |
$4.26 |
$3.40 |
| 45 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$100.00 |
$200.00 |
$273.99 |
$107.80 |
| 46 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 27 | EA |
$15.00 |
$18.00 |
$21.30 |
$19.40 |
| 47 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 119 | SF |
$20.00 |
$31.00 |
$15.98 |
$33.40 |
| 48 | 851(C) 8324 |
2" SQUARE TUBE POST | 188 | LF |
$10.00 |
$7.00 |
$8.52 |
$7.55 |
| 49 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 44 | LF |
$12.00 |
$9.00 |
$9.59 |
$9.70 |
| 50 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 56,950 | LF |
$0.4500 |
$0.4100 |
$0.5100 |
$0.4400 |
| 51 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 318 | LF |
$3.00 |
$8.00 |
$2.13 |
$8.60 |
| 52 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 32 | LF |
$10.00 |
$10.00 |
$10.65 |
$10.80 |
| 53 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 44,200 | LF |
$0.1500 |
$0.0900 |
$0.1100 |
$0.1000 |
| 54 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 37,800 | LF |
$0.7000 |
$0.8200 |
$0.7500 |
$0.8800 |
| 55 | 857(F) 8820 |
PAVEMENT MARKING REMOVAL (HYDROBLASTING) | 6,606 | LF |
$2.00 |
$0.3100 |
$0.6400 |
$0.3300 |
| 56 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 140 | SD |
$13.00 |
$4.00 |
$21.30 |
$4.30 |
| 57 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 11,600 | LF |
$20.00 |
$13.65 |
$21.00 |
$14.70 |
| 58 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,340 | SD |
$0.3000 |
$0.5000 |
$0.5300 |
$0.5400 |
| 59 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,620 | SD |
$2.00 |
$1.00 |
$0.8000 |
$1.10 |
| 60 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,800 | SD |
$2.50 |
$1.00 |
$1.07 |
$1.10 |
| 61 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,310 | SD |
$1.00 |
$1.00 |
$0.5300 |
$1.10 |
| 62 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$2.00 |
$0.7000 |
$0.5300 |
$0.7500 |
| 63 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 720 | SD |
$0.7500 |
$0.3500 |
$1.60 |
$0.3800 |
| 64 | 880(F) 8878 |
DRUMS | 8,430 | SD |
$0.5000 |
$0.3500 |
$0.1600 |
$0.3800 |
| 65 | 880(G) 8890 |
CHANNELIZER CONES | 23,736 | SD |
$0.1000 |
$0.3000 |
$0.1600 |
$0.3200 |
| 66 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 180 | SD |
$35.00 |
$6.00 |
$21.30 |
$6.45 |
| 67 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$65,000.00 |
$92,550.00 |
$75,000.00 |
$31,500.00 |
| 68 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$15,000.00 |
$1,280.51 |
$15,000.00 |
| 69 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$9,000.00 |
$17,500.00 |
$20,000.00 |
$15,000.00 |
| 70 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$400,000.00 |
$367,100.00 |
$400,000.00 |
$425,000.00 |
| 71 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$45,000.00 |
$72,000.00 |
$45,001.00 |
$45,000.00 |