| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$25,000.00 |
$27,000.00 |
$10,600.00 |
$25,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 44,307 | CY |
$4.30 |
$2.25 |
$2.15 |
$2.12 |
$2.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 403,016 | CY |
$6.00 |
$4.85 |
$4.79 |
$4.77 |
$5.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$23,000.00 |
$75,000.00 |
$80,000.00 |
$63,600.00 |
$100,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 15,349 | LF |
$1.72 |
$2.00 |
$1.25 |
$1.26 |
$1.19 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,120 | LF |
$5.54 |
$8.00 |
$7.60 |
$7.57 |
$7.14 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 188,277 | SY |
$2.50 |
$1.75 |
$1.47 |
$1.45 |
$1.37 |
| 8 | 230(F) 2812 |
WATERING | 7,531 | KGAL |
$3.00 |
$8.00 |
$5.30 |
$5.30 |
$5.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 58.8 | AC |
$619.00 |
$600.00 |
$519.50 |
$517.28 |
$488.00 |
| 10 | 241 2832 |
MOWING | 77.8 | AC |
$65.00 |
$100.00 |
$92.00 |
$91.16 |
$86.00 |
| 11 | 307(A) 4200 |
FLY ASH | 2,836 | TON |
$70.00 |
$60.00 |
$71.00 |
$64.60 |
$61.00 |
| 12 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 52,522 | SY |
$2.75 |
$2.75 |
$2.55 |
$3.07 |
$2.90 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 2,224 | SY |
$1.50 |
$3.00 |
$1.45 |
$2.79 |
$1.47 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,810 | TON |
$28.00 |
$45.00 |
$41.45 |
$36.51 |
$55.91 |
| 15 | 407(B) 0250 |
TACK COAT | 7,989 | GAL |
$3.50 |
$2.50 |
$4.15 |
$4.40 |
$4.15 |
| 16 | 408 5774 |
PRIME COAT | 22,279 | GAL |
$6.50 |
$3.50 |
$4.45 |
$4.66 |
$4.40 |
| 17 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 4,887 | TON |
$87.00 |
$86.00 |
$89.75 |
$94.87 |
$89.50 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 16,253 | TON |
$70.00 |
$74.00 |
$80.80 |
$85.33 |
$80.50 |
| 19 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 3,195 | TON |
$90.00 |
$96.00 |
$102.55 |
$108.39 |
$102.25 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,325 | TON |
$88.00 |
$81.00 |
$91.85 |
$96.99 |
$91.50 |
| 21 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 21,246 | LF |
$0.1400 |
$0.3000 |
$0.4000 |
$0.2900 |
$0.2700 |
| 22 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 100 | LF |
$62.00 |
$20.00 |
$21.30 |
$21.20 |
$44.49 |
| 23 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 62 | LF |
$63.00 |
$32.00 |
$34.00 |
$33.92 |
$51.62 |
| 24 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 773 | LF |
$5.00 |
$5.00 |
$38.20 |
$26.50 |
$31.39 |
| 25 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 258 | LF |
$5.00 |
$5.00 |
$38.20 |
$26.50 |
$31.39 |
| 26 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 4 | EA |
$1,500.00 |
$1,200.00 |
$1,300.00 |
$2,082.90 |
$2,493.06 |
| 27 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,800.00 |
$1,500.00 |
$1,600.00 |
$2,082.90 |
$2,715.04 |
| 28 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 3 | EA |
$400.00 |
$750.00 |
$450.00 |
$449.93 |
$864.34 |
| 29 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$6,000.00 |
$12,000.00 |
$16,000.00 |
$16,960.00 |
$3,165.59 |
| 30 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 52,433 | SY |
$3.00 |
$4.00 |
$1.90 |
$4.81 |
$6.93 |
| 31 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 2,447 | LF |
$0.8800 |
$2.15 |
$2.60 |
$3.18 |
$4.48 |
| 32 | 619(C) 0924 |
SAWING PAVEMENT | 8,671 | LF |
$3.00 |
$3.00 |
$2.70 |
$4.24 |
$3.50 |
| 33 | 623 0100 |
(PL)GUARDRAIL CURBING | 16 | EA |
$1,000.00 |
$300.00 |
$800.00 |
$1,060.00 |
$748.06 |
| 34 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 3,613 | LF |
$19.00 |
$13.90 |
$16.00 |
$15.90 |
$15.00 |
| 35 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 16 | EA |
$2,000.00 |
$2,100.00 |
$2,100.00 |
$2,067.00 |
$1,950.00 |
| 36 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 16 | EA |
$1,400.00 |
$1,525.00 |
$1,400.00 |
$1,407.68 |
$1,328.00 |
| 37 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 6,487 | LF |
$3.50 |
$3.50 |
$3.60 |
$3.55 |
$3.35 |
| 38 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 1 | EA |
$700.00 |
$1,000.00 |
$1,000.00 |
$848.00 |
$800.00 |
| 39 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 103 | EA |
$15.00 |
$10.00 |
$10.65 |
$10.60 |
$10.00 |
| 40 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 150 | CY |
$25.00 |
$15.00 |
$16.00 |
$28.75 |
$31.10 |
| 41 | 501(G) 6309 |
CLSM BACKFILL | 104 | CY |
$200.00 |
$160.00 |
$171.00 |
$180.59 |
$218.36 |
| 42 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 596 | LF |
$200.00 |
$185.00 |
$198.00 |
$199.59 |
$258.15 |
| 43 | 504(A) 1304 |
APPROACH SLAB | 304.6 | SY |
$175.00 |
$190.00 |
$203.00 |
$200.07 |
$204.04 |
| 44 | 504(B) 1305 |
SAW-CUT GROOVING | 948.8 | SY |
$4.50 |
$4.50 |
$4.80 |
$3.45 |
$3.00 |
| 45 | 504(C) 6250 |
SEALED EXPANSION JOINT | 47.68 | LF |
$250.00 |
$5.00 |
$6.00 |
$298.71 |
$338.79 |
| 46 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 426.5 | LF |
$80.00 |
$80.00 |
$85.15 |
$99.70 |
$107.58 |
| 47 | 506(A) 1322 |
STRUCTURAL STEEL | 1,660 | LB |
$4.00 |
$2.50 |
$2.70 |
$6.67 |
$1.28 |
| 48 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,250.00 |
$2,000.00 |
$2,130.00 |
$1,927.13 |
$1,502.24 |
| 49 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,250.00 |
$2,000.00 |
$2,130.00 |
$2,502.13 |
$1,511.57 |
| 50 | 509(A) 1326 |
CLASS AA CONCRETE | 189.6 | CY |
$450.00 |
$500.00 |
$645.00 |
$625.27 |
$880.93 |
| 51 | 509(B) 1328 |
CLASS A CONCRETE | 174.9 | CY |
$450.00 |
$500.00 |
$533.00 |
$638.82 |
$638.15 |
| 52 | 509(D) 1331 |
CLASS C CONCRETE | 14.3 | CY |
$450.00 |
$800.00 |
$850.00 |
$880.06 |
$743.52 |
| 53 | 511(A) 0332 |
REINFORCING STEEL | 2,840 | LB |
$1.00 |
$0.9000 |
$1.00 |
$1.71 |
$1.43 |
| 54 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 93,610 | LB |
$1.20 |
$1.10 |
$1.18 |
$1.19 |
$1.27 |
| 55 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 144 | LF |
$26.00 |
$35.00 |
$38.00 |
$38.64 |
$40.49 |
| 56 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 476 | LF |
$35.00 |
$43.00 |
$46.00 |
$47.52 |
$47.84 |
| 57 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 144 | LF |
$15.00 |
$15.00 |
$16.00 |
$13.80 |
$28.76 |
| 58 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 476 | LF |
$15.00 |
$15.00 |
$16.00 |
$13.80 |
$33.26 |
| 59 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 992 | SY |
$4.00 |
$4.50 |
$5.00 |
$3.45 |
$3.00 |
| 60 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 139 | LF |
$700.00 |
$800.00 |
$850.00 |
$939.68 |
$4.00 |
| 61 | 523(A) 6550 |
SEALER CRACK PREPARATION | 40.8 | LF |
$3.50 |
$5.00 |
$5.35 |
$4.60 |
$100.00 |
| 62 | 523(B) 6560 |
SEALER RESIN | 0.5 | GAL |
$125.00 |
$150.00 |
$160.00 |
$115.00 |
$160.32 |
| 63 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,030 | TON |
$40.00 |
$60.00 |
$64.00 |
$57.22 |
$73.95 |
| 64 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 200 | TON |
$35.00 |
$60.00 |
$64.00 |
$48.81 |
$73.95 |
| 65 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$15.00 |
$50.00 |
$55.00 |
$28.75 |
$31.39 |
| 66 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$25.00 |
$50.00 |
$55.00 |
$28.75 |
$31.39 |
| 67 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$30,000.00 |
$27,000.00 |
$57,500.00 |
$14,357.04 |
| 68 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 150 | CY |
$25.00 |
$15.00 |
$16.00 |
$28.75 |
$31.10 |
| 69 | 501(G) 6309 |
CLSM BACKFILL | 104 | CY |
$200.00 |
$160.00 |
$171.00 |
$174.84 |
$218.36 |
| 70 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 596 | LF |
$200.00 |
$185.00 |
$198.00 |
$199.59 |
$258.15 |
| 71 | 504(A) 1304 |
APPROACH SLAB | 304.6 | SY |
$175.00 |
$190.00 |
$203.00 |
$200.07 |
$204.04 |
| 72 | 504(B) 1305 |
SAW-CUT GROOVING | 948.1 | SY |
$4.50 |
$4.50 |
$4.80 |
$3.45 |
$4.81 |
| 73 | 504(C) 6250 |
SEALED EXPANSION JOINT | 47.68 | LF |
$250.00 |
$300.00 |
$325.00 |
$298.71 |
$338.79 |
| 74 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 426.5 | LF |
$80.00 |
$80.00 |
$85.15 |
$99.70 |
$107.58 |
| 75 | 506(A) 1322 |
STRUCTURAL STEEL | 1,660 | LB |
$4.00 |
$2.50 |
$2.70 |
$6.67 |
$1.28 |
| 76 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,250.00 |
$2,000.00 |
$2,130.00 |
$1,927.13 |
$1,502.24 |
| 77 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,250.00 |
$2,000.00 |
$2,130.00 |
$2,387.13 |
$1,511.57 |
| 78 | 509(A) 1326 |
CLASS AA CONCRETE | 231.4 | CY |
$450.00 |
$500.00 |
$625.00 |
$613.72 |
$880.93 |
| 79 | 509(B) 1328 |
CLASS A CONCRETE | 164.3 | CY |
$450.00 |
$500.00 |
$533.00 |
$627.39 |
$638.15 |
| 80 | 509(D) 1331 |
CLASS C CONCRETE | 11.6 | CY |
$450.00 |
$800.00 |
$850.00 |
$892.48 |
$743.52 |
| 81 | 511(A) 0332 |
REINFORCING STEEL | 2,910 | LB |
$1.00 |
$0.9000 |
$1.00 |
$1.71 |
$1.43 |
| 82 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 94,450 | LB |
$1.20 |
$1.10 |
$1.18 |
$1.19 |
$1.27 |
| 83 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 160 | LF |
$26.00 |
$35.00 |
$38.00 |
$38.13 |
$40.49 |
| 84 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 540 | LF |
$35.00 |
$43.00 |
$46.00 |
$44.53 |
$47.84 |
| 85 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 160 | LF |
$15.00 |
$15.00 |
$16.00 |
$13.80 |
$28.76 |
| 86 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 540 | LF |
$15.00 |
$15.00 |
$16.00 |
$13.80 |
$33.26 |
| 87 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 992 | SY |
$4.00 |
$4.50 |
$5.00 |
$3.45 |
$3.00 |
| 88 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 153 | LF |
$700.00 |
$800.00 |
$850.00 |
$930.36 |
$857.94 |
| 89 | 523(A) 6550 |
SEALER CRACK PREPARATION | 47.6 | LF |
$3.50 |
$5.00 |
$5.35 |
$4.60 |
$4.00 |
| 90 | 523(B) 6560 |
SEALER RESIN | 0.6 | GAL |
$125.00 |
$150.00 |
$160.00 |
$115.00 |
$100.00 |
| 91 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,070 | TON |
$40.00 |
$60.00 |
$64.00 |
$57.22 |
$73.95 |
| 92 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 210 | TON |
$35.00 |
$60.00 |
$64.00 |
$48.81 |
$73.95 |
| 93 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$15.00 |
$50.00 |
$55.00 |
$28.75 |
$31.39 |
| 94 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 48 | LF |
$25.00 |
$50.00 |
$55.00 |
$28.75 |
$31.39 |
| 95 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$30,000.00 |
$27,000.00 |
$51,750.00 |
$14,357.04 |
| 96 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$25.00 |
$15.00 |
$16.00 |
$28.75 |
$31.10 |
| 97 | 501(G) 6309 |
CLSM BACKFILL | 154 | CY |
$200.00 |
$160.00 |
$171.00 |
$169.28 |
$218.36 |
| 98 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,197 | LF |
$200.00 |
$220.00 |
$235.00 |
$243.49 |
$302.55 |
| 99 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$175.00 |
$190.00 |
$203.00 |
$202.77 |
$204.04 |
| 100 | 504(B) 1305 |
SAW-CUT GROOVING | 1,159.1 | SY |
$4.50 |
$4.50 |
$4.80 |
$3.45 |
$3.00 |
| 101 | 504(C) 6250 |
SEALED EXPANSION JOINT | 43.2 | LF |
$250.00 |
$300.00 |
$325.00 |
$298.71 |
$338.79 |
| 102 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 723 | LF |
$80.00 |
$80.00 |
$85.15 |
$99.70 |
$107.58 |
| 103 | 506(A) 1322 |
STRUCTURAL STEEL | 1,350 | LB |
$4.00 |
$2.50 |
$2.70 |
$6.67 |
$1.28 |
| 104 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,250.00 |
$2,000.00 |
$2,130.00 |
$1,517.88 |
$1,502.24 |
| 105 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,250.00 |
$2,000.00 |
$2,130.00 |
$1,977.88 |
$1,511.57 |
| 106 | 509(A) 1326 |
CLASS AA CONCRETE | 358.5 | CY |
$450.00 |
$500.00 |
$533.00 |
$584.98 |
$880.93 |
| 107 | 509(B) 1328 |
CLASS A CONCRETE | 182.4 | CY |
$450.00 |
$500.00 |
$533.00 |
$610.08 |
$638.15 |
| 108 | 509(D) 1331 |
CLASS C CONCRETE | 11.8 | CY |
$450.00 |
$800.00 |
$850.00 |
$892.35 |
$743.52 |
| 109 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 118,760 | LB |
$1.20 |
$1.10 |
$1.18 |
$1.19 |
$1.27 |
| 110 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 170 | LF |
$26.00 |
$35.00 |
$38.00 |
$37.87 |
$40.49 |
| 111 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 547 | LF |
$35.00 |
$43.00 |
$46.00 |
$44.46 |
$47.84 |
| 112 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 170 | LF |
$15.00 |
$15.00 |
$16.00 |
$13.80 |
$28.76 |
| 113 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 547 | LF |
$15.00 |
$15.00 |
$16.00 |
$13.80 |
$33.26 |
| 114 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,346 | SY |
$4.00 |
$5.00 |
$5.50 |
$3.45 |
$3.00 |
| 115 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 190 | LF |
$700.00 |
$800.00 |
$850.00 |
$938.96 |
$857.94 |
| 116 | 523(A) 6550 |
SEALER CRACK PREPARATION | 40.8 | LF |
$3.50 |
$5.00 |
$5.35 |
$4.60 |
$4.00 |
| 117 | 523(B) 6560 |
SEALER RESIN | 0.5 | GAL |
$125.00 |
$150.00 |
$160.00 |
$115.00 |
$100.00 |
| 118 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,680 | TON |
$40.00 |
$60.00 |
$64.00 |
$54.92 |
$73.95 |
| 119 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 345 | TON |
$35.00 |
$60.00 |
$64.00 |
$46.51 |
$73.95 |
| 120 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$15.00 |
$50.00 |
$55.00 |
$28.75 |
$31.39 |
| 121 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$25.00 |
$50.00 |
$55.00 |
$28.75 |
$31.39 |
| 122 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$45,000.00 |
$55,000.00 |
$54,000.00 |
$86,250.00 |
$14,357.04 |
| 123 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$25.00 |
$15.00 |
$16.00 |
$28.75 |
$31.10 |
| 124 | 501(G) 6309 |
CLSM BACKFILL | 154 | CY |
$200.00 |
$160.00 |
$171.00 |
$169.28 |
$218.36 |
| 125 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,197 | LF |
$200.00 |
$220.00 |
$235.00 |
$243.49 |
$302.55 |
| 126 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$175.00 |
$190.00 |
$203.00 |
$202.77 |
$204.04 |
| 127 | 504(B) 1305 |
SAW-CUT GROOVING | 1,173.2 | SY |
$4.50 |
$4.50 |
$4.80 |
$3.45 |
$3.00 |
| 128 | 504(C) 6250 |
SEALED EXPANSION JOINT | 43.2 | LF |
$250.00 |
$300.00 |
$325.00 |
$298.71 |
$338.79 |
| 129 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 723 | LF |
$80.00 |
$80.00 |
$85.15 |
$99.70 |
$107.58 |
| 130 | 506(A) 1322 |
STRUCTURAL STEEL | 1,350 | LB |
$4.00 |
$2.50 |
$2.70 |
$6.67 |
$1.28 |
| 131 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,250.00 |
$2,000.00 |
$2,130.00 |
$1,517.88 |
$1,502.24 |
| 132 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,250.00 |
$2,000.00 |
$2,130.00 |
$1,977.88 |
$1,511.57 |
| 133 | 509(A) 1326 |
CLASS AA CONCRETE | 358.5 | CY |
$450.00 |
$500.00 |
$533.00 |
$584.98 |
$880.93 |
| 134 | 509(B) 1328 |
CLASS A CONCRETE | 173.6 | CY |
$450.00 |
$500.00 |
$533.00 |
$610.11 |
$638.15 |
| 135 | 509(D) 1331 |
CLASS C CONCRETE | 12.1 | CY |
$450.00 |
$800.00 |
$850.00 |
$889.74 |
$743.52 |
| 136 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 118,220 | LB |
$1.20 |
$1.10 |
$1.18 |
$1.19 |
$1.27 |
| 137 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 162 | LF |
$26.00 |
$35.00 |
$38.00 |
$38.08 |
$40.49 |
| 138 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 511 | LF |
$35.00 |
$43.00 |
$46.00 |
$44.82 |
$47.84 |
| 139 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 162 | LF |
$15.00 |
$15.00 |
$16.00 |
$13.80 |
$28.76 |
| 140 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 511 | LF |
$15.00 |
$15.00 |
$16.00 |
$13.80 |
$33.26 |
| 141 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,346 | SY |
$4.00 |
$4.50 |
$5.00 |
$3.45 |
$3.00 |
| 142 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 176 | LF |
$700.00 |
$800.00 |
$850.00 |
$918.32 |
$857.94 |
| 143 | 523(A) 6550 |
SEALER CRACK PREPARATION | 40.8 | LF |
$3.50 |
$5.00 |
$5.35 |
$4.60 |
$4.00 |
| 144 | 523(B) 6560 |
SEALER RESIN | 0.5 | GAL |
$125.00 |
$150.00 |
$160.00 |
$115.00 |
$100.00 |
| 145 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,290 | TON |
$40.00 |
$60.00 |
$64.00 |
$54.92 |
$73.95 |
| 146 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 255 | TON |
$35.00 |
$60.00 |
$64.00 |
$46.51 |
$73.95 |
| 147 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$15.00 |
$50.00 |
$55.00 |
$28.75 |
$31.39 |
| 148 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 62 | LF |
$25.00 |
$50.00 |
$55.00 |
$28.75 |
$31.39 |
| 149 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$38,000.00 |
$55,000.00 |
$54,000.00 |
$86,250.00 |
$14,357.04 |
| 150 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 47,088 | LF |
$0.2000 |
$0.2000 |
$0.1500 |
$0.1200 |
$0.1000 |
| 151 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 4,000 | EA |
$0.7200 |
$0.4000 |
$0.4500 |
$0.4600 |
$0.4000 |
| 152 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 8,000 | LF |
$0.2000 |
$0.2500 |
$0.3000 |
$0.2900 |
$0.2500 |
| 153 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,600 | SD |
$0.2500 |
$0.2000 |
$0.2500 |
$0.2300 |
$0.2000 |
| 154 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,160 | SD |
$0.6500 |
$2.47 |
$2.65 |
$2.84 |
$2.47 |
| 155 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,480 | SD |
$1.30 |
$0.9700 |
$1.00 |
$1.12 |
$0.9700 |
| 156 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 15,120 | SD |
$0.6000 |
$0.4700 |
$0.5000 |
$0.5400 |
$0.4700 |
| 157 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$1.00 |
$2.00 |
$2.15 |
$2.30 |
$2.00 |
| 158 | 880(D) 8854 |
VERTICAL PANELS | 10,800 | SD |
$0.1000 |
$0.0500 |
$0.1000 |
$0.0600 |
$0.0500 |
| 159 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 36,720 | SD |
$0.1000 |
$0.0300 |
$0.0500 |
$0.0400 |
$0.0300 |
| 160 | 880(F) 8878 |
DRUMS | 5,400 | SD |
$0.1000 |
$0.2500 |
$0.0500 |
$0.0400 |
$0.0300 |
| 161 | 880(G) 8890 |
CHANNELIZER CONES | 57,600 | SD |
$0.1000 |
$0.2500 |
$0.0500 |
$0.0400 |
$0.0300 |
| 162 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 720 | SD |
$10.00 |
$5.00 |
$5.35 |
$5.75 |
$5.00 |
| 163 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 75 | SF |
$16.00 |
$15.00 |
$16.00 |
$17.25 |
$15.00 |
| 164 | 851(C) 8324 |
2" SQUARE TUBE POST | 135 | LF |
$6.50 |
$6.00 |
$6.40 |
$6.90 |
$6.00 |
| 165 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 47,088 | LF |
$0.5000 |
$0.3100 |
$0.3500 |
$0.3600 |
$0.3100 |
| 166 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$78,000.00 |
$75,000.00 |
$60,000.00 |
$57,356.25 |
$53,000.00 |
| 167 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,000.00 |
$30,000.00 |
$27,000.00 |
$2,875.00 |
$27,062.73 |
| 168 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$480,000.00 |
$485,000.00 |
$205,000.00 |
$315,934.01 |
$540,000.00 |