| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$13,500.00 |
$100,000.00 |
$42,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 57,280 | CY |
$4.75 |
$5.85 |
$4.88 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$20,000.00 |
$21,000.00 |
| 4 | 210 0121 |
OBLITERATING ABANDONED ROAD | 1,301 | LF |
$5.00 |
$2.35 |
$10.50 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,849 | LF |
$1.35 |
$2.00 |
$1.19 |
| 6 | 221(E) 2804 |
TEMPORARY SEDIMENT BASIN | 1 | EA |
$150.00 |
$1,000.00 |
$367.50 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 385 | LF |
$10.00 |
$1.60 |
$8.71 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 526 | LF |
$2.10 |
$1.00 |
$1.63 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 57,122 | SY |
$1.40 |
$1.50 |
$1.25 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 13.6 | AC |
$475.00 |
$750.00 |
$430.50 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 13.6 | AC |
$300.00 |
$600.00 |
$443.10 |
| 12 | 241 2832 |
MOWING | 27.2 | AC |
$70.00 |
$50.00 |
$73.01 |
| 13 | 310(B) 0149 |
SUBGRADE, METHOD B | 14,820 | SY |
$1.30 |
$0.8500 |
$2.63 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,277 | TON |
$30.00 |
$45.75 |
$37.80 |
| 15 | 407(B) 0250 |
TACK COAT | 4,051 | GAL |
$2.50 |
$5.25 |
$5.51 |
| 16 | 408 5774 |
PRIME COAT | 4,786 | GAL |
$3.00 |
$8.15 |
$8.56 |
| 17 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 1,304 | TON |
$70.00 |
$88.20 |
$92.61 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 7,780 | TON |
$67.00 |
$78.85 |
$82.79 |
| 19 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 905 | TON |
$85.00 |
$105.00 |
$110.25 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,402 | TON |
$78.00 |
$91.55 |
$96.13 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 30 | CY |
$10.00 |
$5.00 |
$9.97 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 119 | CY |
$440.00 |
$560.00 |
$385.30 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 121 | CY |
$250.00 |
$330.00 |
$336.06 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 18,817 | LB |
$1.10 |
$0.9000 |
$0.9300 |
| 25 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 1,048 | LF |
$17.00 |
$32.00 |
$18.90 |
| 26 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 60 | LF |
$33.00 |
$55.00 |
$18.90 |
| 27 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 58 | LF |
$8.50 |
$35.00 |
$21.00 |
| 28 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 8 | LF |
$15.00 |
$35.00 |
$21.00 |
| 29 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 30 | EA |
$867.00 |
$1,750.00 |
$983.46 |
| 30 | 613(P) 7025 |
21" X 15" GALV. STEEL CULVERT END SECTION ARCH | 2 | EA |
$500.00 |
$270.00 |
$157.50 |
| 31 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$600.00 |
$425.00 |
$763.48 |
| 32 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 139 | CY |
$25.00 |
$60.00 |
$26.25 |
| 33 | 613(V) 1180 |
TRENCH EXCAVATION | 184 | CY |
$20.00 |
$9.25 |
$4.88 |
| 34 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$6,300.00 |
| 35 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$250.00 |
$800.00 |
$525.00 |
| 36 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 10,544 | SY |
$3.00 |
$3.35 |
$3.52 |
| 37 | 619(C) 0924 |
SAWING PAVEMENT | 62 | LF |
$10.00 |
$10.00 |
$21.00 |
| 38 | 619(F) 8710 |
PLUG OIL WELL | 1 | EA |
$2,500.00 |
$30,000.00 |
$52,500.00 |
| 39 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,500 | LF |
$14.50 |
$14.00 |
$15.70 |
| 40 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$1,818.00 |
$2,000.00 |
$2,226.00 |
| 41 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$1,450.00 |
$1,150.00 |
$1,375.50 |
| 42 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 2,651 | LF |
$4.00 |
$6.00 |
$3.49 |
| 43 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 4,866 | LF |
$3.25 |
$6.00 |
$3.65 |
| 44 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 44 | EA |
$20.00 |
$10.00 |
$21.00 |
| 45 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 455 | CY |
$25.00 |
$30.00 |
$12.16 |
| 46 | 501(G) 6309 |
CLSM BACKFILL | 294 | CY |
$200.00 |
$150.00 |
$122.44 |
| 47 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,196 | LF |
$250.00 |
$220.00 |
$239.21 |
| 48 | 504(A) 1304 |
APPROACH SLAB | 551.4 | SY |
$175.00 |
$175.00 |
$184.32 |
| 49 | 504(B) 1305 |
SAW-CUT GROOVING | 1,982 | SY |
$4.50 |
$4.00 |
$5.18 |
| 50 | 504(C) 6250 |
SEALED EXPANSION JOINT | 56.94 | LF |
$275.00 |
$280.00 |
$291.94 |
| 51 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 846 | LF |
$85.00 |
$75.00 |
$90.36 |
| 52 | 506(A) 1322 |
STRUCTURAL STEEL | 1,890 | LB |
$4.00 |
$3.00 |
$3.70 |
| 53 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,200.00 |
$1,000.00 |
$1,617.02 |
| 54 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$1,200.00 |
$1,000.00 |
$1,617.02 |
| 55 | 509(A) 1326 |
CLASS AA CONCRETE | 356.7 | CY |
$500.00 |
$585.00 |
$552.09 |
| 56 | 509(B) 1328 |
CLASS A CONCRETE | 308 | CY |
$475.00 |
$560.00 |
$547.40 |
| 57 | 509(D) 1331 |
CLASS C CONCRETE | 4 | CY |
$450.00 |
$950.00 |
$569.68 |
| 58 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 156,990 | LB |
$1.25 |
$0.9500 |
$1.26 |
| 59 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 336 | LF |
$28.00 |
$30.00 |
$39.03 |
| 60 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 748 | LF |
$30.00 |
$40.00 |
$46.56 |
| 61 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 336 | LF |
$15.00 |
$10.00 |
$15.36 |
| 62 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 748 | LF |
$15.00 |
$10.00 |
$15.36 |
| 63 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,544 | SY |
$4.00 |
$4.00 |
$4.61 |
| 64 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 141 | LF |
$600.00 |
$750.00 |
$656.15 |
| 65 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 237 | LF |
$750.00 |
$850.00 |
$827.13 |
| 66 | 523(A) 6550 |
SEALER CRACK PREPARATION | 40.8 | LF |
$5.00 |
$5.00 |
$5.12 |
| 67 | 523(B) 6560 |
SEALER RESIN | 0.5 | GAL |
$300.00 |
$250.00 |
$192.00 |
| 68 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,030 | TON |
$45.00 |
$48.00 |
$59.21 |
| 69 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 205 | TON |
$35.00 |
$45.00 |
$53.85 |
| 70 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 102 | LF |
$15.00 |
$25.00 |
$44.34 |
| 71 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 64 | LF |
$25.00 |
$25.00 |
$10.09 |
| 72 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$67,500.00 |
$327,296.00 |
| 73 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 14,000 | LF |
$0.4000 |
$0.6000 |
$0.6100 |
| 74 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 13,120 | SD |
$0.2500 |
$0.3000 |
$0.1600 |
| 75 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 960 | SD |
$0.6000 |
$2.00 |
$2.36 |
| 76 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,240 | SD |
$1.25 |
$2.00 |
$0.6800 |
| 77 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 960 | SD |
$0.5000 |
$2.00 |
$1.78 |
| 78 | 880(C) 8848 |
WING BARRICADES | 640 | SD |
$1.00 |
$1.00 |
$0.3100 |
| 79 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 5,760 | SD |
$0.1000 |
$0.1000 |
$0.1600 |
| 80 | 880(F) 8878 |
DRUMS | 80 | SD |
$0.1000 |
$0.6000 |
$0.4200 |
| 81 | 880(G) 8890 |
CHANNELIZER CONES | 1,920 | SD |
$0.1000 |
$0.6000 |
$0.4200 |
| 82 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 80 | SD |
$13.75 |
$60.00 |
$31.50 |
| 83 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$57.00 |
$100.00 |
$210.00 |
| 84 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 27.5 | SF |
$16.00 |
$25.00 |
$21.00 |
| 85 | 851(C) 8324 |
2" SQUARE TUBE POST | 56 | LF |
$7.00 |
$15.00 |
$9.45 |
| 86 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 1,700 | LF |
$0.6600 |
$0.5000 |
$2.52 |
| 87 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$25,000.00 |
$17,820.00 |
| 88 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,000.00 |
$20,000.00 |
$3,330.00 |
| 89 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$175,452.00 |
$214,000.00 |
$214,907.41 |