| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$3,000.00 |
$3,000.00 |
$5,000.00 |
$33,700.00 |
$5,000.00 |
$3,240.00 |
$15,450.00 |
$35,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 21,533 | CY |
$5.00 |
$4.00 |
$4.00 |
$3.50 |
$4.21 |
$4.20 |
$4.32 |
$9.20 |
$5.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,551 | CY |
$7.00 |
$6.00 |
$6.00 |
$8.00 |
$6.50 |
$5.50 |
$6.48 |
$11.60 |
$3.75 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$10,000.00 |
$10,000.00 |
$20,000.00 |
$12,520.00 |
$16,500.00 |
$10,800.00 |
$10,300.00 |
$10,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,055 | LF |
$2.00 |
$1.19 |
$1.19 |
$1.19 |
$2.10 |
$1.25 |
$1.28 |
$1.25 |
$1.50 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$350.00 |
$199.00 |
$199.00 |
$199.00 |
$315.00 |
$220.00 |
$215.00 |
$205.00 |
$375.00 |
| 7 | 221(E) 2804 |
TEMPORARY SEDIMENT BASIN | 1 | EA |
$1,000.00 |
$519.00 |
$519.00 |
$519.00 |
$1,100.00 |
$545.00 |
$560.00 |
$534.60 |
$1,400.00 |
| 8 | 221(F) 0100 |
TEMPORARY SILT DIKE | 522 | LF |
$10.00 |
$9.90 |
$9.90 |
$9.90 |
$8.40 |
$11.00 |
$10.69 |
$10.20 |
$10.50 |
| 9 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 22 | CY |
$80.00 |
$59.00 |
$59.00 |
$59.00 |
$105.00 |
$65.00 |
$63.72 |
$60.80 |
$75.00 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 27,732 | SY |
$2.50 |
$1.29 |
$1.29 |
$1.29 |
$1.68 |
$1.35 |
$1.40 |
$1.35 |
$1.40 |
| 11 | 230(F) 2812 |
WATERING | 1,110 | KGAL |
$1.00 |
$4.68 |
$4.68 |
$4.68 |
$6.30 |
$5.25 |
$5.05 |
$4.85 |
$5.00 |
| 12 | 233(A) 2817 |
VEGETATIVE MULCHING | 7.64 | AC |
$400.00 |
$461.00 |
$461.00 |
$461.00 |
$525.00 |
$485.00 |
$497.88 |
$474.85 |
$525.00 |
| 13 | 241 2832 |
MOWING | 18.16 | AC |
$80.00 |
$69.00 |
$69.00 |
$69.00 |
$55.00 |
$75.00 |
$74.52 |
$71.10 |
$70.00 |
| 14 | 310(B) 0149 |
SUBGRADE, METHOD B | 5,965 | SY |
$2.50 |
$1.00 |
$1.00 |
$0.5000 |
$2.75 |
$2.00 |
$1.08 |
$2.10 |
$2.50 |
| 15 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 70.1 | TON |
$30.00 |
$40.00 |
$40.00 |
$50.00 |
$55.00 |
$38.00 |
$43.20 |
$48.30 |
$44.00 |
| 16 | 407(A) 4659 |
FOG SEAL | 54 | GAL |
$6.00 |
$5.15 |
$5.15 |
$5.66 |
$5.20 |
$5.50 |
$5.56 |
$5.15 |
$5.50 |
| 17 | 407(B) 0250 |
TACK COAT | 5,583 | GAL |
$3.00 |
$2.90 |
$2.90 |
$2.90 |
$2.95 |
$3.20 |
$3.13 |
$2.90 |
$3.40 |
| 18 | 408 5774 |
PRIME COAT | 1,207 | GAL |
$6.00 |
$6.75 |
$6.75 |
$6.75 |
$6.80 |
$7.40 |
$7.29 |
$6.75 |
$8.00 |
| 19 | 409(A) 4242 |
FABRIC REINFORCEMENT | 5,758 | SY |
$2.50 |
$3.55 |
$3.55 |
$3.55 |
$3.60 |
$3.75 |
$3.83 |
$3.55 |
$4.10 |
| 20 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 750.4 | TON |
$65.00 |
$99.86 |
$99.85 |
$99.85 |
$100.00 |
$105.00 |
$107.85 |
$99.85 |
$115.00 |
| 21 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,185.9 | TON |
$67.00 |
$94.90 |
$94.90 |
$94.90 |
$95.00 |
$99.00 |
$102.50 |
$94.90 |
$109.50 |
| 22 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 679.3 | TON |
$80.00 |
$110.96 |
$110.96 |
$110.96 |
$111.00 |
$115.00 |
$119.85 |
$110.96 |
$127.00 |
| 23 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 788 | TON |
$85.00 |
$104.65 |
$104.65 |
$104.65 |
$105.00 |
$110.00 |
$113.00 |
$104.65 |
$120.00 |
| 24 | 412 5267 |
COLD MILLING PAVEMENT | 533.4 | SY |
$12.50 |
$3.00 |
$3.00 |
$3.00 |
$3.30 |
$15.00 |
$14.00 |
$13.00 |
$14.00 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$308.00 |
$350.00 |
$165.00 |
$250.00 |
$300.00 |
$374.75 |
$257.50 |
$275.00 |
| 26 | 611(G) 5334 |
INLET GPI TYPE 2 (DES. 8) | 1 | EA |
$2,200.00 |
$2,500.00 |
$2,500.00 |
$4,500.00 |
$3,800.00 |
$2,900.00 |
$2,700.00 |
$2,399.90 |
$3,300.00 |
| 27 | 611(G) 6004 |
INLET (SMD-TYPE 2A) | 1 | EA |
$1,500.00 |
$1,800.00 |
$1,800.00 |
$3,400.00 |
$2,500.00 |
$1,550.00 |
$1,944.00 |
$1,030.00 |
$2,400.00 |
| 28 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 88 | LF |
$50.00 |
$55.00 |
$55.00 |
$50.00 |
$50.00 |
$41.00 |
$59.40 |
$56.65 |
$58.00 |
| 29 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 170 | LF |
$65.00 |
$65.00 |
$65.00 |
$75.00 |
$60.00 |
$59.00 |
$70.20 |
$72.10 |
$75.00 |
| 30 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 49 | LF |
$30.00 |
$18.00 |
$18.00 |
$35.00 |
$25.00 |
$20.00 |
$19.44 |
$30.90 |
$22.00 |
| 31 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 1 | EA |
$1,200.00 |
$1,680.00 |
$1,500.00 |
$1,600.00 |
$1,500.00 |
$1,000.00 |
$1,625.45 |
$1,287.50 |
$900.00 |
| 32 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 2 | EA |
$1,400.00 |
$2,420.00 |
$2,000.00 |
$2,100.00 |
$1,800.00 |
$1,100.00 |
$1,803.50 |
$1,390.50 |
$1,100.00 |
| 33 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$2,000.00 |
$2,000.00 |
$8,000.00 |
$3,500.00 |
$7,500.00 |
$2,160.00 |
$10,300.00 |
$16,850.00 |
| 34 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 10,340 | SY |
$5.00 |
$4.00 |
$4.00 |
$1.75 |
$3.81 |
$4.25 |
$4.32 |
$4.35 |
$4.00 |
| 35 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,857 | LF |
$4.00 |
$3.50 |
$3.50 |
$5.08 |
$4.00 |
$3.50 |
$3.45 |
$3.65 |
$3.75 |
| 36 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 5,790 | CY |
$6.00 |
$4.00 |
$4.00 |
$4.00 |
$5.25 |
$4.20 |
$4.44 |
$6.20 |
$4.00 |
| 37 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 402 | CY |
$15.00 |
$18.00 |
$5.00 |
$20.00 |
$15.00 |
$10.00 |
$11.10 |
$6.20 |
$30.00 |
| 38 | 509(A) 1326 |
CLASS AA CONCRETE | 1,028.3 | CY |
$425.00 |
$299.00 |
$309.00 |
$340.00 |
$324.23 |
$350.00 |
$357.55 |
$350.20 |
$315.00 |
| 39 | 511(A) 1332 |
REINFORCING STEEL | 168,540 | LB |
$0.9000 |
$0.8000 |
$0.9000 |
$1.00 |
$0.7000 |
$1.00 |
$0.9100 |
$0.8500 |
$0.8000 |
| 40 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$10,000.00 |
$7,500.00 |
$17,500.00 |
$7,500.00 |
$19,980.00 |
$5,150.00 |
$10,000.00 |
| 41 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 6 | EA |
$250.00 |
$100.00 |
$150.00 |
$150.00 |
$157.50 |
$110.00 |
$108.00 |
$154.50 |
$250.00 |
| 42 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 5,636 | LF |
$0.7000 |
$1.00 |
$1.00 |
$1.00 |
$1.05 |
$1.05 |
$1.08 |
$1.05 |
$1.20 |
| 43 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 13,600 | LF |
$0.3000 |
$0.1500 |
$0.1500 |
$0.1500 |
$0.1600 |
$0.1700 |
$0.1600 |
$0.1500 |
$0.1700 |
| 44 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 301 | EA |
$1.00 |
$4.00 |
$1.00 |
$1.00 |
$1.05 |
$4.20 |
$4.32 |
$1.05 |
$4.61 |
| 45 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,450 | LF |
$0.5000 |
$0.1500 |
$0.1000 |
$0.1000 |
$0.1100 |
$0.1700 |
$0.1600 |
$0.1000 |
$0.1700 |
| 46 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,090 | SD |
$0.6000 |
$0.5000 |
$0.3500 |
$0.3500 |
$0.3700 |
$0.5300 |
$0.5400 |
$0.4000 |
$0.5800 |
| 47 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 550 | SD |
$1.00 |
$2.00 |
$2.00 |
$2.00 |
$2.10 |
$2.10 |
$2.16 |
$2.10 |
$2.31 |
| 48 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,930 | SD |
$1.50 |
$0.7500 |
$1.50 |
$1.50 |
$1.58 |
$0.8000 |
$0.8100 |
$1.55 |
$0.8600 |
| 49 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 550 | SD |
$2.00 |
$2.00 |
$2.50 |
$2.50 |
$2.63 |
$2.10 |
$2.16 |
$2.60 |
$2.31 |
| 50 | 880(C) 8848 |
WING BARRICADES | 480 | SD |
$2.00 |
$1.00 |
$2.00 |
$2.00 |
$2.10 |
$1.10 |
$1.08 |
$2.10 |
$1.15 |
| 51 | 880(D) 8854 |
VERTICAL PANELS | 5,050 | SD |
$0.2500 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1100 |
$0.1200 |
$0.1100 |
$0.1000 |
$0.1200 |
| 52 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,300 | SD |
$0.2500 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1100 |
$0.1200 |
$0.1100 |
$0.1000 |
$0.1200 |
| 53 | 880(F) 8878 |
DRUMS | 2,250 | SD |
$0.5000 |
$0.1000 |
$0.3500 |
$0.3500 |
$0.3700 |
$0.1200 |
$0.1100 |
$0.4000 |
$0.1200 |
| 54 | 880(G) 8884 |
TUBE CHANNELIZERS | 900 | SD |
$0.2500 |
$3.00 |
$0.3500 |
$0.3500 |
$0.3700 |
$3.20 |
$3.24 |
$0.4000 |
$3.46 |
| 55 | 880(G) 8890 |
CHANNELIZER CONES | 5,420 | SD |
$0.2500 |
$0.1000 |
$0.3500 |
$0.3500 |
$0.3700 |
$0.1200 |
$0.1100 |
$0.4000 |
$0.1200 |
| 56 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 30 | SD |
$30.00 |
$30.00 |
$25.00 |
$25.00 |
$26.25 |
$35.00 |
$32.40 |
$25.75 |
$34.58 |
| 57 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$5,900.00 |
$5,900.00 |
$6,500.00 |
$15,000.00 |
$7,150.00 |
$7,000.00 |
$6,695.00 |
$7,000.00 |
| 58 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$2,500.00 |
$3,500.00 |
$3,500.00 |
$5,000.00 |
$3,000.00 |
$2,160.00 |
$1,785.00 |
$2,100.00 |
| 59 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$103,826.00 |
$107,200.00 |
$140,395.25 |
$122,964.66 |
$95,000.00 |
$45,000.00 |
$105,200.00 |
$52,959.00 |
$105,000.00 |
| 60 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$10,000.00 |
$4,835.00 |
$4,835.00 |
$4,835.00 |
$5,000.00 |
$38,000.00 |
$5,221.80 |
$4,981.00 |
$5,100.00 |