| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 27,373 | CY |
$4.00 |
$3.75 |
$5.00 |
$10.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$8.00 |
$12.50 |
$5.00 |
$5.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,500.00 |
$10,000.00 |
$20,000.00 |
$30,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,200 | LF |
$2.00 |
$1.60 |
$1.77 |
$1.60 |
| 5 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 3 | EA |
$100.00 |
$100.00 |
$118.08 |
$200.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$6.00 |
$6.50 |
$8.27 |
$7.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 18,100 | SY |
$3.00 |
$1.25 |
$1.30 |
$1.20 |
| 8 | 241 2832 |
MOWING | 7.5 | AC |
$40.00 |
$55.00 |
$118.08 |
$50.00 |
| 9 | 307(K) 4300 |
STABILIZED SUBGRADE | 7,945 | SY |
$5.00 |
$5.00 |
$4.00 |
$6.00 |
| 10 | 317 4270 |
CEMENT TREATED BASE | 7,385 | SY |
$10.00 |
$10.00 |
$11.00 |
$18.00 |
| 11 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 3,359 | SY |
$12.00 |
$11.00 |
$11.00 |
$37.50 |
| 12 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 3,545 | SY |
$16.00 |
$15.00 |
$17.00 |
$40.00 |
| 13 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 2,014 | CY |
$100.00 |
$90.00 |
$89.00 |
$104.00 |
| 14 | 504(E) 6190 |
42" F-SHAPED PARAPET | 2,914 | LF |
$60.00 |
$55.00 |
$80.00 |
$70.00 |
| 15 | 504(F) 6006 |
HANDRAILING | 123 | LF |
$100.00 |
$55.00 |
$81.00 |
$50.00 |
| 16 | 509 6152 |
SPECIAL CONCRETE FINISH | 23,594 | SY |
$20.00 |
$14.50 |
$15.50 |
$14.40 |
| 17 | 509(B) 0321 |
CLASS A CONCRETE | 54 | CY |
$450.00 |
$250.00 |
$310.00 |
$425.00 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 59 | CY |
$300.00 |
$250.00 |
$275.00 |
$325.00 |
| 19 | 511(A) 0332 |
REINFORCING STEEL | 300 | LB |
$0.9000 |
$1.00 |
$1.65 |
$1.00 |
| 20 | 609(B) 1526 |
2'-8" COMB. CURB & GUTTER (8" BARRIER) | 160 | LF |
$20.00 |
$15.00 |
$23.00 |
$40.00 |
| 21 | 610(C) 0609 |
6" CONCRETE DIVIDING STRIP | 1,945 | SY |
$50.00 |
$38.50 |
$26.00 |
$50.00 |
| 22 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 2 | EA |
$1,500.00 |
$2,000.00 |
$1,800.00 |
$1,500.00 |
| 23 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 324 | LF |
$60.00 |
$45.00 |
$50.00 |
$60.00 |
| 24 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$500.00 |
$550.00 |
$660.00 |
$500.00 |
| 25 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 2,350 | SY |
$6.00 |
$3.00 |
$3.00 |
$9.00 |
| 26 | 619(B) 4741 |
REMOVAL OF DRAINAGE INLETS | 7 | EA |
$300.00 |
$675.00 |
$175.00 |
$300.00 |
| 27 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 12,354 | SY |
$3.00 |
$4.00 |
$5.00 |
$10.00 |
| 28 | 619(B) 4915 |
REMOVAL OF CONCRETE MEDIAN BARRIER | 745 | LF |
$6.00 |
$7.00 |
$6.00 |
$26.00 |
| 29 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 45 | LF |
$1.50 |
$10.00 |
$3.00 |
$1.50 |
| 30 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 334 | LF |
$2.00 |
$15.00 |
$5.00 |
$2.00 |
| 31 | 619(B) 6252 |
REMOVAL OF EXISTING PARAPET | 1,270 | LF |
$4.00 |
$25.00 |
$6.00 |
$4.00 |
| 32 | 303(C) 2130 |
AGGREGATE BASE TYPE C | 50 | CY |
$70.00 |
$60.00 |
$50.00 |
$45.00 |
| 33 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$10.00 |
$10.00 |
$9.00 |
$25.00 |
| 34 | 510(A) 6333 |
RETAINING WALL | 223.5 | SY |
$500.00 |
$525.00 |
$675.00 |
$700.00 |
| 35 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 417 | LF |
$30.00 |
$37.50 |
$30.00 |
$26.00 |
| 36 | 514(A) 6012 |
PILES, FURNISHED (HP 14X73) | 655 | LF |
$35.00 |
$47.50 |
$40.00 |
$36.00 |
| 37 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 417 | LF |
$20.00 |
$10.00 |
$14.00 |
$12.00 |
| 38 | 514(B) 6296 |
PILES, DRIVEN (HP 14X73) | 655 | LF |
$25.00 |
$10.00 |
$17.00 |
$16.00 |
| 39 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 123 | LF |
$10.00 |
$20.00 |
$11.00 |
$10.00 |
| 40 | 616(A) 5130 |
20" DUCTILE IRON PIPE | 163 | LF |
$200.00 |
$262.50 |
$295.00 |
$200.00 |
| 41 | 616(D) 0870 |
20" VALVES (TAPPING) | 2 | EA |
$10,000.00 |
$15,500.00 |
$17,000.00 |
$10,000.00 |
| 42 | 616(D) 7018 |
20" X 20" TAPPING SLEEVE | 2 | EA |
$8,000.00 |
$15,500.00 |
$17,000.00 |
$8,000.00 |
| 43 | 616(O) 0100 |
FITTINGS | 6 | EA |
$2,500.00 |
$2,625.00 |
$2,900.00 |
$2,500.00 |
| 44 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 299 | CY |
$20.00 |
$25.00 |
$12.00 |
$35.00 |
| 45 | 501(G) 6309 |
CLSM BACKFILL | 346 | CY |
$175.00 |
$115.00 |
$80.00 |
$120.00 |
| 46 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,785.6 | LF |
$200.00 |
$175.00 |
$245.00 |
$250.00 |
| 47 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 2,450.2 | LF |
$275.00 |
$175.00 |
$285.00 |
$275.00 |
| 48 | 504 6410 |
SEAM COVER | 20 | EA |
$8,000.00 |
$2,500.00 |
$3,000.00 |
$2,000.00 |
| 49 | 504(A) 1304 |
APPROACH SLAB | 467.2 | SY |
$155.00 |
$145.00 |
$145.00 |
$140.00 |
| 50 | 504(B) 1305 |
SAW-CUT GROOVING | 4,955.4 | SY |
$5.00 |
$4.50 |
$4.60 |
$6.05 |
| 51 | 504(C) 6250 |
SEALED EXPANSION JOINT | 229.2 | LF |
$250.00 |
$215.00 |
$245.00 |
$200.00 |
| 52 | 504(E) 6190 |
42" F-SHAPED PARAPET | 2,347.5 | LF |
$62.00 |
$57.50 |
$80.00 |
$70.00 |
| 53 | 506(A) 1322 |
STRUCTURAL STEEL | 10,650 | LB |
$4.00 |
$2.00 |
$3.00 |
$3.00 |
| 54 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 40 | EA |
$3,000.00 |
$2,500.00 |
$3,200.00 |
$2,500.00 |
| 55 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 48 | EA |
$3,200.00 |
$2,500.00 |
$3,250.00 |
$2,500.00 |
| 56 | 509(A) 1326 |
CLASS AA CONCRETE | 1,371.9 | CY |
$450.00 |
$400.00 |
$450.00 |
$500.00 |
| 57 | 509(B) 1328 |
CLASS A CONCRETE | 2,231.2 | CY |
$400.00 |
$400.00 |
$425.00 |
$500.00 |
| 58 | 510(C) 6138 |
SLOPE WALL (5") | 2,245 | SY |
$75.00 |
$75.00 |
$70.00 |
$40.00 |
| 59 | 511(A) 1332 |
REINFORCING STEEL | 700 | LB |
$0.9000 |
$1.00 |
$1.10 |
$0.8000 |
| 60 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 717,500 | LB |
$1.00 |
$0.8500 |
$0.9300 |
$0.9000 |
| 61 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,639 | LF |
$45.00 |
$35.00 |
$33.00 |
$26.00 |
| 62 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,639 | LF |
$20.00 |
$10.00 |
$22.00 |
$12.00 |
| 63 | 514(K) 6260 |
(PL)PILOT HOLES | 56 | LF |
$150.00 |
$150.00 |
$70.00 |
$50.00 |
| 64 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 1,064 | LF |
$750.00 |
$500.00 |
$500.00 |
$1,120.00 |
| 65 | 523(A) 6550 |
SEALER CRACK PREPARATION | 221.3 | LF |
$6.00 |
$5.00 |
$4.70 |
$4.00 |
| 66 | 523(B) 6560 |
SEALER RESIN | 2.4 | GAL |
$300.00 |
$200.00 |
$175.00 |
$150.00 |
| 67 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 412 | LF |
$40.00 |
$20.00 |
$12.00 |
$20.00 |
| 68 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 120 | LF |
$40.00 |
$15.00 |
$15.00 |
$20.00 |
| 69 | 624(E) 4294 |
FENCE-STYLE CLF (8'HIGH, CLASS A) | 248.6 | LF |
$50.00 |
$155.00 |
$145.00 |
$75.00 |
| 70 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 145 | CY |
$20.00 |
$25.00 |
$12.00 |
$35.00 |
| 71 | 501(G) 6309 |
CLSM BACKFILL | 155.2 | CY |
$175.00 |
$115.00 |
$80.00 |
$120.00 |
| 72 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,098 | LF |
$200.00 |
$175.00 |
$255.00 |
$250.00 |
| 73 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 1,993.1 | LF |
$275.00 |
$175.00 |
$310.00 |
$275.00 |
| 74 | 504 6410 |
SEAM COVER | 16 | EA |
$8,000.00 |
$2,500.00 |
$3,000.00 |
$2,000.00 |
| 75 | 504(A) 1304 |
APPROACH SLAB | 227.6 | SY |
$180.00 |
$145.00 |
$145.00 |
$140.00 |
| 76 | 504(B) 1305 |
SAW-CUT GROOVING | 3,504 | SY |
$5.00 |
$4.50 |
$4.60 |
$6.05 |
| 77 | 504(C) 6250 |
SEALED EXPANSION JOINT | 127.1 | LF |
$250.00 |
$215.00 |
$245.00 |
$200.00 |
| 78 | 504(E) 6190 |
42" F-SHAPED PARAPET | 1,659.6 | LF |
$75.00 |
$57.50 |
$80.00 |
$70.00 |
| 79 | 506(A) 1322 |
STRUCTURAL STEEL | 7,650 | LB |
$4.00 |
$2.00 |
$3.00 |
$3.00 |
| 80 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 28 | EA |
$3,000.00 |
$2,650.00 |
$3,500.00 |
$2,500.00 |
| 81 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 36 | EA |
$3,200.00 |
$2,650.00 |
$3,600.00 |
$2,500.00 |
| 82 | 509(A) 1326 |
CLASS AA CONCRETE | 1,000.8 | CY |
$450.00 |
$400.00 |
$450.00 |
$500.00 |
| 83 | 509(B) 1328 |
CLASS A CONCRETE | 1,414.9 | CY |
$400.00 |
$400.00 |
$425.00 |
$500.00 |
| 84 | 511(A) 1332 |
REINFORCING STEEL | 490 | LB |
$0.9000 |
$1.00 |
$1.25 |
$0.8000 |
| 85 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 471,750 | LB |
$1.00 |
$0.8500 |
$0.9300 |
$0.9000 |
| 86 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 616.5 | LF |
$45.00 |
$35.00 |
$33.00 |
$26.00 |
| 87 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 616.5 | LF |
$20.00 |
$10.00 |
$27.00 |
$12.00 |
| 88 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 738 | LF |
$750.00 |
$500.00 |
$500.00 |
$1,120.00 |
| 89 | 523(A) 6550 |
SEALER CRACK PREPARATION | 170.4 | LF |
$6.00 |
$5.00 |
$4.70 |
$4.00 |
| 90 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$300.00 |
$200.00 |
$175.00 |
$150.00 |
| 91 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 56 | LF |
$40.00 |
$20.00 |
$11.00 |
$20.00 |
| 92 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$40.00 |
$15.00 |
$15.00 |
$20.00 |
| 93 | 624(E) 4294 |
FENCE-STYLE CLF (8'HIGH, CLASS A) | 244.7 | LF |
$50.00 |
$155.00 |
$155.00 |
$75.00 |
| 94 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 500 | LF |
$3.00 |
$2.00 |
$5.00 |
$4.00 |
| 95 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 420 | SD |
$5.00 |
$5.26 |
$5.90 |
$5.00 |
| 96 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,000 | SD |
$0.4000 |
$0.2600 |
$0.3000 |
$0.2500 |
| 97 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,410 | SD |
$1.00 |
$0.5300 |
$0.5900 |
$0.5000 |
| 98 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 840 | SD |
$1.30 |
$4.21 |
$4.72 |
$4.00 |
| 99 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,260 | SD |
$0.7500 |
$0.5300 |
$0.5900 |
$0.5000 |
| 100 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,520 | SD |
$0.4000 |
$0.2600 |
$0.3000 |
$0.2500 |
| 101 | 880(F) 8878 |
DRUMS | 7,980 | SD |
$0.4000 |
$0.2600 |
$0.3000 |
$0.2500 |
| 102 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 420 | SD |
$15.00 |
$21.03 |
$23.62 |
$20.00 |
| 103 | 804(A) 2915 |
STRUCTURAL CONCRETE | 4.05 | CY |
$500.00 |
$525.65 |
$590.38 |
$500.00 |
| 104 | 804(B) 2916 |
REINFORCING STEEL | 564 | LB |
$1.00 |
$2.10 |
$2.36 |
$2.00 |
| 105 | 805(A) 8700 |
REMOVAL OF SIGN FOOTING | 1 | EA |
$7,500.00 |
$251.57 |
$2,435.75 |
$7,500.00 |
| 106 | 805(A) 8712 |
(PL)REMOVAL OF LIGHT POLE | 12 | EA |
$500.00 |
$598.42 |
$354.23 |
$300.00 |
| 107 | 805(A) 8718 |
(PL)REMOVAL OF OVERHEAD SIGN STRUCTURE & SIGNS | 1 | LSUM |
$740.00 |
$5,000.00 |
$11,291.46 |
$3,000.00 |
| 108 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 3 | EA |
$60.00 |
$525.65 |
$590.38 |
$250.00 |
| 109 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 176 | SF |
$17.00 |
$14.72 |
$16.53 |
$15.00 |
| 110 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 70 | SF |
$2,000.00 |
$28.38 |
$31.88 |
$20.00 |
| 111 | 850(B) 8114 |
EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 337 | SF |
$2.50 |
$28.38 |
$31.88 |
$47.00 |
| 112 | 851(A) 3207 |
6"@15 GALV.STEEL WIDE FLANGE BEAM POST | 35 | LF |
$1.10 |
$36.80 |
$41.33 |
$27.00 |
| 113 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 165 | LF |
$1.75 |
$18.92 |
$21.25 |
$16.00 |
| 114 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 19,675 | LF |
$0.5000 |
$0.7900 |
$0.8900 |
$0.7500 |
| 115 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 310 | LF |
$0.7500 |
$1.05 |
$1.18 |
$1.00 |
| 116 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 460 | LF |
$1.00 |
$2.10 |
$2.36 |
$2.00 |
| 117 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 2 | EA |
$250.00 |
$262.83 |
$295.19 |
$250.00 |
| 118 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 11 | EA |
$250.00 |
$157.69 |
$177.11 |
$150.00 |
| 119 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 2 | EA |
$30,000.00 |
$23,500.00 |
$25,999.73 |
$23,000.00 |
| 120 | 509(A) 0319 |
CLASS AA CONCRETE | 18.6 | CY |
$490.00 |
$600.00 |
$590.38 |
$500.00 |
| 121 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 40 | LF |
$590.00 |
$250.00 |
$295.19 |
$250.00 |
| 122 | 802(A) 8300 |
3/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 30 | LF |
$12.00 |
$8.41 |
$10.04 |
$8.50 |
| 123 | 802(A) 8306 |
1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 175 | LF |
$15.50 |
$13.51 |
$14.17 |
$12.00 |
| 124 | 802(A) 8310 |
2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 150 | LF |
$17.00 |
$15.14 |
$17.71 |
$15.00 |
| 125 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 1,420 | LF |
$4.50 |
$3.68 |
$4.13 |
$3.50 |
| 126 | 802(E) 8372 |
JUNCTION BOX(8" X 8" X 6") | 4 | EA |
$300.00 |
$346.93 |
$472.31 |
$400.00 |
| 127 | 803(A) 8065 |
PULL BOX(SIZE I) | 15 | EA |
$263.73 |
$262.82 |
$283.38 |
$240.00 |
| 128 | 804(A) 2915 |
STRUCTURAL CONCRETE | 2.32 | CY |
$457.97 |
$551.93 |
$649.42 |
$550.00 |
| 129 | 804(B) 2916 |
REINFORCING STEEL | 3,166 | LB |
$1.31 |
$1.00 |
$1.42 |
$1.20 |
| 130 | 805(A) 8712 |
(PL)REMOVAL OF LIGHT POLE | 4 | EA |
$350.00 |
$582.73 |
$354.23 |
$300.00 |
| 131 | 805(D) 8744 |
(PL)REMOVE & RESET LIGHT POLE | 1 | EA |
$2,500.00 |
$2,102.58 |
$2,951.90 |
$2,500.00 |
| 132 | 806(C) 8929 |
40' MTG.HT.POLE & TWIN H.L.MST.ARM(G.STL.) | 4 | EA |
$2,200.00 |
$2,806.95 |
$2,425.28 |
$2,054.00 |
| 133 | 807 8092 |
BREAKAWAY BASE (DES. B) | 4 | EA |
$600.00 |
$473.08 |
$507.73 |
$430.00 |
| 134 | 809(A) 8090 |
ROADWAY LUMINAIRE | 8 | EA |
$856.50 |
$388.98 |
$375.48 |
$318.00 |
| 135 | 809(B) 8098 |
UNDERPASS LUMINIARE | 6 | EA |
$700.00 |
$483.60 |
$507.73 |
$430.00 |
| 136 | 809(E) 8103 |
HIGH MAST LUMINAIRE | 5 | EA |
$1,400.00 |
$1,198.47 |
$1,210.28 |
$1,025.00 |
| 137 | 810(A) 3118 |
SERVICE POLE | 1 | EA |
$2,306.63 |
$6,139.54 |
$7,084.56 |
$6,000.00 |
| 138 | 811 8038 |
1/C NO.4 ELECTRICAL CONDUCTOR | 2,300 | LF |
$2.50 |
$2.10 |
$1.65 |
$1.40 |
| 139 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 3,350 | LF |
$1.10 |
$0.8400 |
$0.7100 |
$0.6000 |
| 140 | 811 8052 |
2/C NO.12 ELECTRICAL CONDUCTOR | 440 | LF |
$1.75 |
$1.10 |
$1.06 |
$0.9000 |
| 141 | 812 8068 |
140' HIGH MAST POLE(G.STL.) | 1 | EA |
$21,000.00 |
$20,573.78 |
$23,034.27 |
$19,508.00 |
| 142 | 813 8074 |
HIGH MAST LOWERING DEVICE TYPE I | 1 | EA |
$10,000.00 |
$7,359.04 |
$10,744.92 |
$9,100.00 |
| 143 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$90,000.00 |
$20,000.00 |
$21,844.07 |
$75,000.00 |
| 144 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$2,500.00 |
$5,000.00 |
$5,000.00 |
| 145 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$502,900.00 |
$250,000.00 |
$172,028.00 |
$525,000.00 |
| 146 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$84,000.00 |
$70,000.01 |
$72,000.00 |
$70,000.00 |