| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$5,890.59 |
$12,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 20,105 | CY |
$4.15 |
$5.00 |
$5.19 |
$4.75 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 500 | CY |
$8.00 |
$1.00 |
$16.56 |
$12.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$30,000.00 |
$42,168.10 |
$18,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 400 | LF |
$2.00 |
$6.00 |
$2.10 |
$2.20 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 250 | LF |
$8.00 |
$7.00 |
$7.35 |
$8.80 |
| 7 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 4 | CY |
$60.00 |
$1,000.00 |
$210.00 |
$220.00 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 3,681 | LF |
$1.50 |
$1.00 |
$0.4700 |
$2.20 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 36,050 | SY |
$1.50 |
$1.33 |
$1.10 |
$1.15 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 8 | AC |
$400.00 |
$600.00 |
$341.25 |
$400.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 8 | AC |
$290.00 |
$600.00 |
$315.00 |
$330.00 |
| 12 | 241 2832 |
MOWING | 16 | AC |
$60.00 |
$50.00 |
$47.25 |
$50.00 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,039 | CY |
$40.00 |
$62.00 |
$68.11 |
$60.58 |
| 14 | 310(B) 0149 |
SUBGRADE, METHOD B | 10,959 | SY |
$2.00 |
$1.30 |
$1.94 |
$2.50 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 11,046 | SY |
$1.50 |
$1.45 |
$1.75 |
$2.00 |
| 16 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 10,871 | SY |
$2.20 |
$2.25 |
$3.68 |
$3.20 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,726 | TON |
$25.00 |
$33.00 |
$32.65 |
$32.50 |
| 18 | 407(B) 0250 |
TACK COAT | 4,003 | GAL |
$3.50 |
$2.25 |
$2.46 |
$2.75 |
| 19 | 408 5774 |
PRIME COAT | 3,364 | GAL |
$5.50 |
$3.50 |
$5.22 |
$5.83 |
| 20 | 409(A) 4242 |
FABRIC REINFORCEMENT | 3,507 | SY |
$1.75 |
$5.25 |
$3.76 |
$4.40 |
| 21 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,219 | TON |
$70.00 |
$64.10 |
$65.95 |
$78.71 |
| 22 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,565 | TON |
$75.00 |
$72.00 |
$73.11 |
$82.00 |
| 23 | 411(E) 5990 |
SUPERPAVE, TYPE S6(PG 64-22 OK) | 298 | TON |
$105.00 |
$92.00 |
$87.17 |
$98.00 |
| 24 | 412 5267 |
COLD MILLING PAVEMENT | 2,408 | SY |
$2.50 |
$3.50 |
$2.66 |
$3.30 |
| 25 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 100 | SY |
$230.00 |
$50.00 |
$128.56 |
$85.00 |
| 26 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 20 | CY |
$95.00 |
$110.00 |
$114.84 |
$150.00 |
| 27 | 426(D) 5098 |
POLYURETHANE INJECTION FOR PAVEMENT | 1,100 | LB |
$4.75 |
$7.50 |
$5.04 |
$5.25 |
| 28 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 120 | LF |
$35.00 |
$50.00 |
$42.00 |
$50.00 |
| 29 | 509(A) 0319 |
CLASS AA CONCRETE | 109 | CY |
$400.00 |
$440.00 |
$498.75 |
$475.00 |
| 30 | 509(D) 0325 |
CLASS C CONCRETE | 636 | CY |
$250.00 |
$220.00 |
$236.25 |
$225.00 |
| 31 | 511(A) 0332 |
REINFORCING STEEL | 15,207 | LB |
$0.9000 |
$1.15 |
$0.8900 |
$0.8500 |
| 32 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 203 | TON |
$32.00 |
$55.50 |
$46.20 |
$44.00 |
| 33 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 115 | TON |
$27.00 |
$65.00 |
$35.70 |
$34.00 |
| 34 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 70 | LF |
$32.00 |
$57.00 |
$29.40 |
$28.00 |
| 35 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 32 | LF |
$25.00 |
$73.00 |
$26.25 |
$25.00 |
| 36 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 62 | LF |
$35.00 |
$63.00 |
$31.50 |
$30.00 |
| 37 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 280 | LF |
$9.00 |
$19.00 |
$15.75 |
$3.50 |
| 38 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 25 | LF |
$14.00 |
$37.00 |
$15.75 |
$3.50 |
| 39 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$700.00 |
$650.00 |
$2,100.00 |
$2,000.00 |
| 40 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$720.00 |
$800.00 |
$2,625.00 |
$2,500.00 |
| 41 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$650.00 |
$1,500.00 |
$2,625.00 |
$2,500.00 |
| 42 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$9,975.00 |
$7,500.00 |
| 43 | 619(B) 0291 |
REMOVAL OF HEADWALL | 4 | EA |
$700.00 |
$500.00 |
$1,260.00 |
$1,200.00 |
| 44 | 619(C) 0924 |
SAWING PAVEMENT | 8,991 | LF |
$4.90 |
$1.50 |
$1.68 |
$3.30 |
| 45 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 7,203 | LF |
$4.25 |
$3.50 |
$3.03 |
$3.88 |
| 46 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$70.00 |
$73.00 |
$73.50 |
$110.00 |
| 47 | 629(C) 4960 |
MAILBOX | 1 | EA |
$110.00 |
$27.00 |
$26.25 |
$110.00 |
| 48 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 1 | EA |
$25.00 |
$11.00 |
$10.50 |
$27.50 |
| 49 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 16,200 | LF |
$0.1500 |
$0.0800 |
$0.0700 |
$0.1300 |
| 50 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 3,400 | EA |
$0.5000 |
$0.5000 |
$0.4700 |
$0.4500 |
| 51 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,000 | LF |
$0.1500 |
$0.1300 |
$0.1300 |
$0.2000 |
| 52 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 90 | SD |
$25.00 |
$32.00 |
$31.50 |
$20.00 |
| 53 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,320 | SD |
$0.1500 |
$0.0300 |
$0.0200 |
$0.1500 |
| 54 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,080 | SD |
$0.4500 |
$0.0300 |
$0.0200 |
$2.00 |
| 55 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,620 | SD |
$0.7000 |
$1.55 |
$1.58 |
$2.00 |
| 56 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 360 | SD |
$0.3000 |
$0.2200 |
$0.2100 |
$2.00 |
| 57 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$0.6500 |
$1.60 |
$1.58 |
$0.5000 |
| 58 | 880(D) 8854 |
VERTICAL PANELS | 6,930 | SD |
$0.0500 |
$0.1100 |
$0.1100 |
$0.1000 |
| 59 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,830 | SD |
$0.0500 |
$0.0300 |
$0.0200 |
$0.1500 |
| 60 | 880(F) 8878 |
DRUMS | 6,930 | SD |
$0.1000 |
$0.1100 |
$0.1100 |
$0.1000 |
| 61 | 880(G) 8890 |
CHANNELIZER CONES | 6,930 | SD |
$0.1000 |
$0.1100 |
$0.1100 |
$0.1500 |
| 62 | 880(I) 8902 |
FLAGGER | 180 | SD |
$125.00 |
$125.00 |
$210.00 |
$200.00 |
| 63 | 880(W) 8800 |
PILOT CAR | 1 | LSUM |
$12,000.00 |
$22,500.00 |
$24,762.06 |
$15,000.00 |
| 64 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 180 | SD |
$12.75 |
$30.00 |
$30.45 |
$25.00 |
| 65 | 804(A) 2915 |
STRUCTURAL CONCRETE | 0.72 | CY |
$475.00 |
$410.00 |
$420.00 |
$500.00 |
| 66 | 804(B) 2916 |
REINFORCING STEEL | 130 | LB |
$1.15 |
$1.60 |
$1.58 |
$2.00 |
| 67 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 3 | EA |
$125.00 |
$150.00 |
$147.00 |
$250.00 |
| 68 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 52 | SF |
$15.00 |
$12.50 |
$12.60 |
$16.00 |
| 69 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 57 | SF |
$18.00 |
$16.00 |
$15.75 |
$25.00 |
| 70 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 36 | LF |
$27.00 |
$16.00 |
$15.75 |
$36.00 |
| 71 | 851(C) 8324 |
2" SQUARE TUBE POST | 88.3 | LF |
$7.50 |
$11.50 |
$11.55 |
$8.00 |
| 72 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 14,800 | LF |
$0.7500 |
$0.5000 |
$0.4900 |
$0.8000 |
| 73 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$36,200.00 |
$10,000.00 |
$11,206.86 |
$10,000.00 |
| 74 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$2,500.00 |
$6,259.26 |
$5,500.00 |
| 75 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$87,000.00 |
$36,000.00 |
$50,075.52 |
$90,000.00 |