| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$100,000.00 |
$9,746.50 |
$5,000.00 |
$15,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 5,905 | CY |
$4.75 |
$4.38 |
$2.50 |
$5.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 77,605 | CY |
$5.00 |
$5.01 |
$5.70 |
$7.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$150,000.00 |
$8,080.00 |
$30,000.00 |
$15,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,000 | LF |
$2.70 |
$2.01 |
$1.99 |
$2.25 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 246 | LF |
$7.00 |
$10.05 |
$9.95 |
$7.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 49,915 | SY |
$2.00 |
$1.11 |
$1.10 |
$1.16 |
| 8 | 232(A) 2813 |
SEEDING METHOD A | 10.31 | AC |
$500.00 |
$196.95 |
$195.00 |
$195.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 10.31 | AC |
$500.00 |
$398.95 |
$395.00 |
$425.00 |
| 10 | 241 2832 |
MOWING | 20.62 | AC |
$80.00 |
$54.54 |
$54.00 |
$60.00 |
| 11 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 2,342 | CY |
$32.00 |
$45.14 |
$42.19 |
$45.00 |
| 12 | 307(J) 4290 |
MODIFIED SUBGRADE | 10,702 | SY |
$6.00 |
$4.84 |
$6.50 |
$5.50 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 9,734 | SY |
$2.00 |
$1.59 |
$1.85 |
$1.40 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 684 | TON |
$25.00 |
$19.16 |
$22.00 |
$23.00 |
| 15 | 407(B) 0250 |
TACK COAT | 1,223 | GAL |
$2.30 |
$2.53 |
$2.95 |
$3.50 |
| 16 | 408 5774 |
PRIME COAT | 3,503 | GAL |
$3.00 |
$7.07 |
$4.17 |
$4.50 |
| 17 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 745 | TON |
$55.00 |
$84.34 |
$94.20 |
$100.00 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,444 | TON |
$53.00 |
$74.49 |
$80.23 |
$85.00 |
| 19 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 488 | TON |
$70.00 |
$90.65 |
$100.65 |
$106.00 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 470 | TON |
$68.00 |
$78.63 |
$82.95 |
$87.50 |
| 21 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 124 | TON |
$42.00 |
$41.39 |
$42.50 |
$26.50 |
| 22 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 334 | LF |
$130.00 |
$80.15 |
$57.70 |
$100.00 |
| 23 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$7.50 |
$6.06 |
$18.00 |
$10.00 |
| 24 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 125 | LF |
$7.50 |
$6.06 |
$18.00 |
$10.00 |
| 25 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$750.00 |
$858.50 |
$855.00 |
$925.00 |
| 26 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$550.00 |
$606.00 |
$575.00 |
$300.00 |
| 27 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$200,000.00 |
$4,545.00 |
$6,000.00 |
$5,000.00 |
| 28 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 4,734 | SY |
$3.50 |
$1.77 |
$6.25 |
$3.25 |
| 29 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 2,198 | LF |
$4.00 |
$2.02 |
$2.00 |
$3.00 |
| 30 | 619(C) 0924 |
SAWING PAVEMENT | 648 | LF |
$10.00 |
$5.05 |
$6.50 |
$4.00 |
| 31 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,507 | LF |
$15.50 |
$14.65 |
$14.06 |
$15.00 |
| 32 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 2 | EA |
$2,500.00 |
$2,045.25 |
$1,825.00 |
$1,925.00 |
| 33 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$1,754.00 |
$1,307.95 |
$1,299.00 |
$1,375.00 |
| 34 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 3,418 | LF |
$3.30 |
$3.54 |
$3.50 |
$5.50 |
| 35 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$15.00 |
$21.40 |
$15.00 |
$100.00 |
| 36 | 501(G) 6309 |
CLSM BACKFILL | 200 | CY |
$140.00 |
$109.82 |
$145.00 |
$115.00 |
| 37 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,270 | LF |
$185.00 |
$192.04 |
$205.21 |
$200.00 |
| 38 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$175.00 |
$124.61 |
$160.00 |
$170.00 |
| 39 | 504(B) 1305 |
SAW-CUT GROOVING | 1,370.4 | SY |
$5.00 |
$3.64 |
$4.00 |
$4.00 |
| 40 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 607 | LF |
$50.00 |
$124.23 |
$88.00 |
$80.00 |
| 41 | 506(A) 1322 |
STRUCTURAL STEEL | 1,060 | LB |
$1.50 |
$3.11 |
$1.60 |
$3.00 |
| 42 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$1,000.00 |
$835.84 |
$465.00 |
$750.00 |
| 43 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$4,000.00 |
$3,182.97 |
$2,650.00 |
$3,500.00 |
| 44 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 20 | EA |
$550.00 |
$580.94 |
$555.00 |
$350.00 |
| 45 | 509 6386 |
SILICONE CONSTRUCTION JOINT | 85 | LF |
$10.00 |
$21.40 |
$45.00 |
$130.00 |
| 46 | 509(A) 1326 |
CLASS AA CONCRETE | 330.8 | CY |
$500.00 |
$406.47 |
$485.00 |
$425.00 |
| 47 | 509(B) 1328 |
CLASS A CONCRETE | 158.4 | CY |
$450.00 |
$403.05 |
$450.00 |
$750.00 |
| 48 | 509(D) 1331 |
CLASS C CONCRETE | 40 | CY |
$400.00 |
$296.05 |
$305.00 |
$525.00 |
| 49 | 510(C) 6138 |
SLOPE WALL (5") | 835 | SY |
$75.00 |
$65.89 |
$58.00 |
$77.50 |
| 50 | 511(A) 1332 |
REINFORCING STEEL | 1,240 | LB |
$0.8000 |
$1.64 |
$0.8500 |
$1.00 |
| 51 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 100,970 | LB |
$0.9000 |
$0.9200 |
$0.9500 |
$1.00 |
| 52 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 539 | LF |
$30.00 |
$24.62 |
$29.26 |
$40.00 |
| 53 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 539 | LF |
$15.00 |
$16.05 |
$10.50 |
$15.00 |
| 54 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,146 | SY |
$3.50 |
$3.32 |
$3.50 |
$4.00 |
| 55 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 124 | LF |
$600.00 |
$648.12 |
$650.00 |
$600.00 |
| 56 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$5.00 |
$3.75 |
$3.61 |
$5.00 |
| 57 | 523(B) 6560 |
SEALER RESIN | 1.7 | GAL |
$150.00 |
$160.50 |
$110.00 |
$250.00 |
| 58 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 86 | LF |
$25.00 |
$12.52 |
$20.04 |
$20.00 |
| 59 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$20.00 |
$14.69 |
$25.47 |
$20.00 |
| 60 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 14 | CY |
$35.00 |
$32.10 |
$89.71 |
$40.00 |
| 61 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$75,000.00 |
$77,250.00 |
$55,603.39 |
$295,000.00 |
| 62 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 45.5 | SF |
$15.08 |
$14.70 |
$14.00 |
$14.75 |
| 63 | 851(C) 8324 |
2" SQUARE TUBE POST | 88 | LF |
$7.43 |
$10.50 |
$10.00 |
$10.54 |
| 64 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 7,200 | LF |
$0.4400 |
$0.6300 |
$0.7200 |
$0.6300 |
| 65 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$5,775.00 |
$10,500.00 |
$6,000.00 |
| 66 | 642(A) 0095 |
CONSTRUCTION STAKING LEVEL I | 1 | LSUM |
$78,000.00 |
$8,250.00 |
$8,500.00 |
$22,000.00 |
| 67 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,120.00 |
$15,000.00 |
$3,500.00 |
| 68 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$8,240.00 |
$5,800.00 |
$12,500.00 |
| 69 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$157,500.00 |
$90,000.00 |
$176,684.97 |
$152,000.00 |