IDOT Jobs

All dates · 1,073 jobs · $3,468,536,000 Sign up free
★ My Jobs

Filtered by: District: District 8 Clear all

1,073 jobs · $3,468,536,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Nov 17, 2023 97822 MadisonDistrict 8 Resurfacing West Airline Drive from Main Street to 9th Street in East Alton. — Executed Nov 26 New Charles E. Mahoney Co. $858,985 ·
Jan 19, 2024 46638 St. ClairDistrict 8 Pavement marking replacement at various locations in St. Clair County. — Active Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $894,895 ·
Jan 19, 2024 46933 MarionDistrict 8 Resurfacing main and secondary park roads and parking lots, as well as culvert and bridge replacement, signage and lighting at the Stephen A. Forbes Recreation Area in Marion County. — Executed Nov 26 New DMS Contracting, Inc. $8,455,395 ·
Jan 19, 2024 76F88 MadisonDistrict 8 Superstructure replacement on the north Southern Illinois University - Edwardsville entrance road over the Norfolk Southern Railroad (SN 060-0142 and SN 060-0143). — Rejected Nov 26 New Keller Construction, Inc. $4,559,532 ·
Jan 19, 2024 76H49 MadisonDistrict 8 Replacement of SN 060-0347 carrying IL 111 southbound over Cahokia Canal, 0.24 miles north of I-55/70. Project also includes maintenance of the northbound structure, SN 060-0244. — Active Nov 26 New Plocher Construction Company, Inc. $8,868,716 ·
Jan 19, 2024 76L82 MadisonDistrict 8 Bridge deck sealing on SN 060-0345 carrying I-270 over Chain of Rocks Canal. — Executed Nov 26 New All States Painting, Inc. $64,882 ·
Jan 19, 2024 76M81 RandolphDistrict 8 6.5 miles of designed overlay with ADA improvements on IL 13 / IL 153 from IL 4 to the Perry County line. — Executed Nov 26 New Samron Midwest Contracting, Inc. $6,738,441 ·
Jan 19, 2024 76R91 MadisonDistrict 8 New platform scales and patching at the Maryville Weight Station on westbound I-55 / I-70 approximately 1 mile west of Maryville. — Executed Nov 26 New Stutz Excavating, Inc. $739,349 ·
Jan 19, 2024 76T25 MarionDistrict 8 24.2 miles of patching on I-57 / US 50 from 0.7 miles north of IL 161 to the Fayette County line. — Executed Nov 26 New Beniach Construction Co., Inc. $461,857 ·
Jan 19, 2024 76T30 GreeneDistrict 8 1.7 miles of patching on US 67 from Ponderosa Lane to 6th Street in Carrollton. — Executed Nov 26 New G. M. Sipes Construction, Inc. $189,044 ·
Jan 19, 2024 97769 MadisonDistrict 8 HMA resurfacing with concrete curb and gutter, storm sewers, and signage on Sugar Loaf Road from west of Hone Lane to IL 157 in Collinsville. — Executed Nov 26 New DMS Contracting, Inc. $778,107 ·
Jan 19, 2024 97808 St. ClairDistrict 8 Resurfacing on Longacre Drive from Union Hill Road to IL 159 in Fairview Heights. — Rejected Nov 25 New The Kilian Corporation $1,289,612 ·
Jan 19, 2024 97818 ClintonDistrict 8 HMA resurfacing with patching, incedental resurfacing at sideroads and entrances, and aggregate shoulders on CH 8 from IL 161 to 0.30 mile north of I-64. — Executed Nov 26 New The Kilian Corporation $1,003,243 ·
Jan 19, 2024 97820 MarionDistrict 8 HMA Asphalt shoulders with rumble strips, guardrail and terminals, pipe culvets and ditch grading on Green Street Road from Brewery Hill Road to Farthing Rd. Project includes the replacement of the outside deck beam on the structure over Crooked Creek. — Executed Nov 26 New Guinzy Construction,Inc. $3,423,535 ·
Jan 19, 2024 97824 MadisonDistrict 8 Resurfacing Johnson Road from Wabash Avenue to Edgewood Avenue in Granite City. — Executed Nov 26 New Hank's Excavating & Landscaping, Inc. $938,631 ·
Jan 19, 2024 97826 MadisonDistrict 8 HMA resurfacing with sidewalks, driveways, curb and gutter on Keebler Road from Sher Nan Drive to West Main Street in Maryville — Rejected Nov 25 New Stutz Excavating, Inc. $829,420 ·
Mar 8, 2024 76H41 St. ClairDistrict 8 2 miles of new construction on IL 158 from IL 161 to IL 177, including new SN 082-0276. — Executed Nov 26 New Plocher Construction Company, Inc. $19,990,000 ·
Mar 8, 2024 76R84 MadisonSt. ClairDistrict 8 Traffic signal modernization at various intersections in District 8. (IL 3 / IL 111 at Godfrey Road; IL 203 at Madison Avenue / High Street; IL 203 at Ohio Avenue) — Executed Nov 26 New Electrico, Inc. $546,454 ·
Mar 8, 2024 76T13 VariousDistrict 8 Pavement patching at various locations in District 8. — Executed Nov 26 New Kinney Contractors, Inc. $1,197,526 ·
Mar 8, 2024 76T19 MadisonDistrict 8 Patching on IL 203 from Eagle Creek Road to the St. Clair County line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $214,416 ·
Mar 8, 2024 76T21 BondDistrict 8 1.2 miles of chip seal and fog seal on Old IL 127 from 0.2 miles north of OR 15 to IL 127. — Executed Nov 26 New DMS Contracting, Inc. $58,640 ·
Mar 8, 2024 76T22 JerseyDistrict 8 1.98 miles of patching and resurfacing on Old US 67 from 0.6 miles north of Delhi Road to Hilltop Lane. — Executed Nov 26 New Charles E. Mahoney Co. $869,829 ·
Mar 8, 2024 76T23 BondDistrict 8 0.9 miles of resurfacing on State Street from O-Fallon Street to US 40 in Pocahontas. — Executed Nov 26 New The Kilian Corporation $257,173 ·
Mar 8, 2024 76T24 MadisonDistrict 8 2.19 miles of SMART overlay milling and resurfacing, pavement patching, guardrail improvements, and pavement marking on W Frontage Rd from 0.1 miles east of of Park Street in Livingston to the Macoupin County Line. — Executed Nov 26 New The Kilian Corporation $1,320,855 ·
Mar 8, 2024 76T27 BondMadisonDistrict 8 4.9 miles of fog seal on Schuster Road in Madison County from IL 143 to Bauman Road and on Freys Meadow Avenue in Bond County from Bauman Road to 1 mile west of Pokey Road. — Executed Nov 26 New DMS Contracting, Inc. $289,901 ·
Mar 8, 2024 76T33 MadisonDistrict 8 0.9 miles of resurfacing on Vadalabene Drive from IL 162 to IL 159 in Maryville. — Executed Nov 26 New Charles E. Mahoney Co. $367,895 ·
Mar 8, 2024 76T36 St. ClairDistrict 8 0.8 miles of chip seal and fog seal on California Drive from 79th Street to IL 157. — Executed Nov 26 New DMS Contracting, Inc. $60,997 ·
Mar 8, 2024 76T37 MonroeDistrict 8 1.2 miles of chip seal and fog seal along Ghent Road (Old Route 3) from the Monroe County line to 0.3 miles north of Columbia Lakes Drive. — Executed Nov 26 New DMS Contracting, Inc. $85,644 ·
Mar 8, 2024 97809 MonroeDistrict 8 Replace the bridge carrying Carl Street over Wilson Creek, south of IL 3 in Columbia — Executed Nov 26 New Baxmeyer Construction, Inc. $648,598 ·
Mar 8, 2024 97825 BondDistrict 8 Replace the bridge carrying TR 164 over Little Beaver Creek, 1/5 miles south of Dudleyville Road. — Executed Nov 26 New C-Hill Civil Contractors, Inc. $498,888 ·
Mar 8, 2024 97830 MadisonDistrict 8 PCC Pavement, sidewalks, driveways, storm sewers, and pavement markings on Sixth Street from Pine Street to Poplar Street in Highland. — Executed Nov 26 New RCS Construction, Inc. $1,549,285 ·
Apr 26, 2024 76L34 WashingtonDistrict 8 8.5 miles of crack and joint sealing on I-64 from the Clinton County line to 1.1 miles west of Covington Road. — Executed Nov 26 New Complete Asphalt Service Co. $259,280 ·
Apr 26, 2024 76R12 MadisonDistrict 8 Bridge deck sealing on US 67 at the Clark Bridge (SN 0606-0255) over the Mississippi River in Alton. — Executed Nov 26 New All States Painting, Inc. $77,994 ·
Apr 26, 2024 76R37 St. ClairDistrict 8 4.8 miles of fog seal on IL 156 from IL 159 to IL 13. — Executed Nov 26 New DeLaurent Construction Co., Inc. $393,454 ·
Apr 26, 2024 76R39 MadisonDistrict 8 6.3 miles of crack and joint sealing on I-70 from 0.1 miles west of Prairie Road to the Bond County line. — Executed Nov 26 New Complete Asphalt Service Co. $199,270 ·
Apr 26, 2024 76R59 MadisonDistrict 8 Milling and resurfacing of the District 8 office parking area (west, southwest parking area and loading docks). — Executed Nov 26 New Christ Bros. Asphalt, Inc. $539,212 ·
Apr 26, 2024 76R94 St. ClairDistrict 8 Replacing high mast, roadway and underpass luminaires along I-55/70/64 near East St. Louis. — Executed Nov 26 New Gerstner Electric, Inc. $351,983 ·
Apr 26, 2024 76T20 St. ClairDistrict 8 0.5 miles of resurfacing on Boul Avenue from IL 161 to IL 159 in Swansea. — Executed Nov 26 New The Kilian Corporation $272,718 ·
Apr 26, 2024 76T29 St. ClairDistrict 8 1 mile of patching and resurfacing on IL 111 from the CSX Railroad bridge to Collinsville Road. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $694,979 ·
Apr 26, 2024 76T32 ClintonDistrict 8 0.7 miles of patching and resurfacing on IL 161 from 0.3 miles west of Red Fox Road to 0.1 miles east of Church Steeple Road. — Executed Nov 26 New The Kilian Corporation $721,636 ·
Apr 26, 2024 76T34 St. ClairDistrict 8 Patching and resurfacing on Collinsville Road/9th Street/Fairmont Avenue from 0.1 miles west of Rose Lake Road in East St. Louis to east of Exchange Avenue. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $1,504,972 ·
Apr 26, 2024 76T40 ClintonDistrict 8 Bridge painting on US 50 under Schumacher Road, 5 miles east of Trenton (SN 014-0050), and on IL 127 over Flat Branch Creek, 8.1 miles north of Carlyle (SN 014 0063). — Executed Nov 26 New Civil Coatings and Construction Inc. $376,650 ·
Apr 26, 2024 76T41 St. ClairWashingtonDistrict 8 Bridge painting on the structure carrying I-64 westbound over NS Railroad, 0.3 miles east of IL 161 and on the structure carrying IL 127 over Locust Creek, 5.5 miles south of Nashville. (SN 082-0195 and SN 095-0065) — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $379,102 ·
Apr 26, 2024 76T42 GreeneDistrict 8 Bridge painting on the structure carrying IL 267 over Apple Creek, 8.6 miles north of Greenfield and the structure carrying IL 267 over Lick Creek, 6.6 miles north of Greenfield. (SN 031-0015 and SN 031-0016) — Executed Nov 26 New Civil Coatings and Construction Inc. $593,796 ·
Apr 26, 2024 76T45 VariousDistrict 8 Video detection system replacement at various locations in District 8. — Executed Nov 26 New Gerstner Electric, Inc. $346,843 ·
Apr 26, 2024 76T46 RandolphDistrict 8 Bridge repair on Little Mary-s Covered Bridge (SN 079-9000) on IL 150, 4 miles northeast of Chester. — Executed Nov 26 New Samron Midwest Contracting, Inc. $311,703 ·
Apr 26, 2024 76T51 St. ClairDistrict 8 Demolition of buildings along Old IL 3 (South Main Street) near Imbs Station Road in Dupo. — Executed Nov 26 New Stutz Excavating, Inc. $250,615 ·
Apr 26, 2024 76T53 MadisonSt. ClairDistrict 8 Traffic signal modernization at various locations: St. Clair Ave. and 37th/38th Street; Foley Drive/70th Street and W. Main Street; 74th Street and Foley Drive; IL 159 and IL 13/158; IL 15 and 74th Street; IL 161 and Frank Scott Parkway in Belleville; IL 3 and Pontoon Road in Granite City. — Executed Nov 26 New Electrico, Inc. $263,300 ·
Apr 26, 2024 76T54 JerseyMadisonDistrict 8 Bridge approach roadway on IL 255 and US 67 at various locations: IL 255 over Humbert Road (SN 060-0309), UP and KCS Railroad (SN 060-0311), and over IL 111/IL 267 (SN 060-0331); US 67 over IL 255 (SN 060-0332) and over Piasa Creek (SN 042-0027). — Executed Nov 26 New Charles E. Mahoney Co. $626,537 ·
Apr 26, 2024 76T55 VariousDistrict 8 Lighting and traffic signal repair and maintenance at various locations throughout District 8. — Executed Nov 26 New Electrico, Inc. $1,753,628 ·
Apr 26, 2024 76T59 WashingtonDistrict 8 8.1 miles of resurfacing on IL 15 from 0.1 miles east of Gardner Street in Nashville to the US 51 West Junction. — Executed Nov 26 New Samron Midwest Contracting, Inc. $2,173,724 ·
Apr 26, 2024 76T60 RandolphDistrict 8 8 miles of ultra-thin bonded wearing surface on IL 3 from 0.1 miles north of Roots Road to 0.1 miles south of Elmer and Edna Kipp Lane. — Executed Nov 26 New The Kilian Corporation $1,603,498 ·
Apr 26, 2024 76T61 WashingtonDistrict 8 3.4 miles of resurfacing on IL 127 from Masonic Drive to Conservation Drive, south of Nashville. — Executed Nov 26 New Samron Midwest Contracting, Inc. $1,157,685 ·
Apr 26, 2024 76T64 St. ClairDistrict 8 Pump replacement at the Bowman Pump Station in East St. Louis. — Executed Nov 26 New Haier Plumbing and Heating, Inc. $590,000 ·
Apr 26, 2024 76T65 MadisonDistrict 8 6.6 miles of overlay on IL 140 from 0.2 miles west of IL 159 to 0.1 miles west of Park Avenue. — Executed Nov 26 New Charles E. Mahoney Co. $2,396,248 ·
Apr 26, 2024 97807 MadisonDistrict 8 Construct a PCC Shared Use Path adjacent to IL 157 with concrete curb and gutter, driveway, drainage structures, retaining walls, traffic signal modifications, pavement markings and signage from the MCT Nature Trail to Levis Road in Edwardsville. — Executed Nov 26 New DMS Contracting, Inc. $1,053,422 ·
Apr 26, 2024 97823 MarionDistrict 8 Replace existing structure with a three-span PPC deck beam structure on H-Pile supported abutments, individual concrete encased H-pile piers with approach roadways on Kline Road over Flat Creek, one mile northwest of Vernon. — Executed Nov 26 New C-Hill Civil Contractors, Inc. $669,999 ·
Apr 26, 2024 97828 BondDistrict 8 HMA resurfacing with sidewalk ramps on Beaumont Avenue from North 3rd Street to IL 140 in Greenville. — Executed Nov 26 New The Kilian Corporation $621,353 ·
Jun 14, 2024 76H70 MarionDistrict 8 Bridge demolition on Old US 51 over East Fork Kaskaskia Overflow, 5 miles north of Sandoval (SN 061-0009). — Executed Nov 26 New Guinzy Construction,Inc. $43,254 ·
Jun 14, 2024 76K05 St. ClairDistrict 8 4.5 miles of patching and resurfacing of mainline I-255, ramps and shoulders, structure rehabilitation, concrete barrier wall replacement, lighting replacement, guardrail replacement, pipe underdrain replacement and other drainage repairs, and sign truss replacement and repairs on I-255 from IL 15 to IL 157. — Executed Nov 26 New The Kilian Corporation & Keeley & Sons, Inc. $65,422,089 ·
Jun 14, 2024 76L11 MarionDistrict 8 11.5 miles of resurfacing and ADA improvements on IL 37 from Cherry Street in Kinmundy to Madison Street in Salem. — Executed Nov 26 New Howell Paving, Inc. $11,501,896 ·
Jun 14, 2024 76P46 MadisonDistrict 8 Bridge repair on SN 060-0124, HMA overlay and joint repair on IL 111 over NW and CNW and MCT Bike Trail, 0.2 miles north of IL 162 in Pontoon Beach. — Executed Nov 26 New Keeley & Sons, Inc. $2,475,979 ·
Jun 14, 2024 76P58 MadisonDistrict 8 2.2 miles of resurfacing and ADA improvements on Beltline Road from IL 157 to IL 159 in Collinsville. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $3,984,987 ·
Jun 14, 2024 76R78 St. ClairDistrict 8 Modernization of 16 traffic signals along IL 159 from the intersection of Ludwig/Salem Avenue to the intersection of IL 161/N. Belt West Road. Limits of this project also includes I-64 from IL 159 westward to milepost 10.8. — Active Nov 25 New Gerstner Electric, Inc. $3,960,000 ·
Jun 14, 2024 76T26 St. ClairDistrict 8 Bridge deck repairs and bridge joint replacement on SN 082-0289 carrying IL 177 over Loop Creek, 0.3 miles east of IL 158. — Executed Nov 26 New The Kilian Corporation $777,410 ·
Jun 14, 2024 76T28 MadisonDistrict 8 Bridge joint repair/replacement and bridge deck repairs on IL 4 over US 40. — Executed Nov 26 New Keeley & Sons, Inc. $1,211,533 ·
Jun 14, 2024 76T38 St. ClairDistrict 8 Deep well and pump repairs at various locations in District 8. — Executed Nov 26 New Haier Plumbing and Heating, Inc. $135,590 ·
Jun 14, 2024 76T47 St. ClairDistrict 8 Adding a new precast concrete vault that will contain two new flow meters installed on 12-inch piping that is the discharge from the 25th Street Pump Station-s deep groundwater wells in East St. Louis. — Executed Nov 26 New Hank's Excavating & Landscaping, Inc. $124,250 ·
Jun 14, 2024 76T50 St. ClairDistrict 8 Intersection improvements and resurfacing at IL 3 and IL 157 in Cahokia Heights. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $989,704 ·
Jun 14, 2024 76T58 VariousDistrict 8 Guardrail and cable median repairs at various locations in District 8. — Executed Nov 26 New Illini Excavation & Reclamation, Inc. $3,771,520 ·
Jun 14, 2024 76T62 VariousDistrict 8 Provide operable and properly maintained traffic signals, flashing beacons, highway lighting, navigation/aviation lighting, data collection stations at various locations throughout District 8. — Executed Nov 26 New Electrico, Inc. $1,627,506 ·
Jun 14, 2024 76T63 VariousDistrict 8 Maintain and service all ITS equipment at various locations throughout District 8. — Executed Nov 26 New Electrico, Inc. $421,036 ·
Jun 14, 2024 76T76 RandolphDistrict 8 48.7 miles of pavement patching on IL 3 from the Monroe County line to the Jackson County line and on IL 150 from the Mississippi River in Chester to the Perry County line. — Executed Nov 26 New E. T. Simonds Construction Company $1,124,540 ·
Jun 14, 2024 76T81 MarionDistrict 8 1 mile of patching on US 50 from 0.1 miles east of Selmaville Road to 0.2 miles east of Baldridge Lane and from 0.1 miles west of Weymeyer Avenue to 0.1 miles west of Lackey Street. — Executed Nov 26 New Kinney Contractors, Inc. $952,947 ·
Jun 14, 2024 76T88 MadisonDistrict 8 Patching, milling and resurfacing on US 67 from 10th Street in Alton to IL 111 in Godfrey. — Executed Nov 26 New Charles E. Mahoney Co. $4,047,724 ·
Jun 14, 2024 76U10 VariousDistrict 8 Oil and chip at various maintenance yards throughout District 8. — Executed Nov 26 New Baxmeyer Construction, Inc. $193,468 ·
Jun 14, 2024 97829 MadisonDistrict 8 Resurface Third Street from Ewing Avenue to McCambridge Avenue in Madison. — Executed Nov 26 New Stutz Excavating, Inc. $1,028,780 ·
Jun 14, 2024 97831 St. ClairDistrict 8 HMA resurfacing and installation of waterproofing system on three separate PPC deck beam structures. Includes removal of existng HMA surface and waterproofing membrane system, repairs to the beam keyways and dowel bar grout. — Executed Nov 26 New The Kilian Corporation $353,072 ·
Jun 14, 2024 97832 MadisonDistrict 8 Resurface South Moreland Road from IL 143 to 0.2 miles south of IL 140. — Executed Nov 26 New The Kilian Corporation $1,971,366 ·
Jun 14, 2024 97835 MadisonDistrict 8 HMA resurfacing with pavement patching, dowel bar retrofitting, thermoplastic pavement markings and signage on University Drive from University Park Drive to Stadium Drive on the SIU Campus in Edwardsville. — Executed Nov 26 New The Kilian Corporation $864,757 ·
Jun 14, 2024 97836 MadisonDistrict 8 Rehabilitate the structure carrying Brown Street over Shields Branch in Alton. Includes linging the existing structure with precast concrete box culvert sections, HMA resurfacing, sidewalk, guardrail, pedestrian railing, riprap, storm sewer, pavment markings, and other work. — Executed Nov 26 New Stutz Excavating, Inc. $730,633 ·
Aug 2, 2024 76818 MadisonDistrict 8 Reconstruction of the IL 111 and I-270 interchange. — Executed Nov 26 New Baxmeyer Construction, Inc. $25,120,777 ·
Aug 2, 2024 76M93 RandolphDistrict 8 Intersection improvements and pavement replacement at the intersection of IL 4 and IL 150. — Executed Nov 26 New Baxmeyer Construction, Inc. $2,685,777 ·
Aug 2, 2024 76R85 RandolphSt. ClairDistrict 8 Navigation lighting repairs at various locations along the Kaskaskia River. — Executed Nov 26 New Wissehr Electric, Inc. $840,453 ·
Aug 2, 2024 76U11 MadisonSt. ClairDistrict 8 Dynamic message sign replacement at various locations in District 8. — Executed Nov 26 New CSD Environmental Services, Inc. $734,322 ·
Aug 2, 2024 76U13 VariousDistrict 8 Weed spraying for Johnson Grass on various routes in District 8. — Executed Nov 26 New The Daltons Inc. $167,226 ·
Aug 2, 2024 76U14 WashingtonDistrict 8 8 miles of pavement patching on I-64 from 0.9 miles west of CH 11 to the Jefferson County line. — Executed Nov 26 New Howell Paving, Inc. $647,450 ·
Aug 2, 2024 97819 St. ClairDistrict 8 Intersection Improvements of Queeny Avenue and Falling Springs Road in Sauget. Includes Construction of dedicated left turn lane, shoulder modifications, drainage improvements, pavement markings and signage. — Executed Nov 26 New The Kilian Corporation $614,919 ·
Aug 2, 2024 97837 St. ClairDistrict 8 Construction of new HMA Pavement with Aggregate Base, curb and gutter, drainage facilities, sidewalks and ADA Ramps on McAlister Road from IL 4 to Herman Street in Lebanon. — Executed Nov 26 New DMS Contracting, Inc. $872,043 ·
Aug 2, 2024 97840 MadisonDistrict 8 HMA resurfacing with patching, sidewalks, and curb and gutter, on Wood River Avenue from Gerguson Ave. to the north city limits of Wood River. — Rejected Nov 25 New Christ Bros. Asphalt, Inc. $1,584,636 ·
Aug 2, 2024 97844 St. ClairDistrict 8 Resurfacing and sidewalk construction on Spostsylvania Street from South Van Buren Street to New Baldwin Road in New Athens. — Executed Nov 26 New The Kilian Corporation $1,276,509 ·
Sep 20, 2024 76N04 St. ClairDistrict 8 3.5 miles of resurfacing on IL 4 from Center Street in Lebanon to the Madison County line. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $3,774,113 ·
Sep 20, 2024 76R46 MadisonDistrict 8 Addition of left turn lane and traffic signal modernization at the intersection of IL 111/IL 140 and Fosterburg Road. — Executed Nov 26 New Stutz Excavating, Inc. $1,956,212 ·
Sep 20, 2024 76T31 BondDistrict 8 Bridge demolition of SN 003-0041 carrying Old IL 127 over Beaver Creek in Greenville. — Executed Nov 26 New DMS Contracting, Inc. $140,906 ·
Sep 20, 2024 76T67 VariousDistrict 8 Construction of GPS base stations at various maintenance yards in District 8. — Executed Nov 26 New Wissehr Electric, Inc. $481,602 ·
Sep 20, 2024 76T69 RandolphDistrict 8 10.4 miles of resurfacing on IL 3 from IL 150 in Chester to the Jackson County line. — Executed Nov 26 New Samron Midwest Contracting, Inc. $6,414,514 ·
Sep 20, 2024 76T71 St. ClairDistrict 8 Well treatment at 5 locations in East St. Louis. — Executed Nov 26 New Davinroy Mechanical Contractor, Inc. $818,160 ·
Sep 20, 2024 76T72 VariousDistrict 8 Repair and maintenance of electrical equipment at pump stations in various counties of District 8. — Executed Nov 26 New Electrico, Inc. $183,003 ·
Sep 20, 2024 76T73 MadisonDistrict 8 Tree removal at IL 162 and IL 157 in Glen Carbon. — Executed Nov 26 New Baxmeyer Construction, Inc. $97,978 ·
Sep 20, 2024 97838 MadisonDistrict 8 HMA resurfacing, curb and gutter, sidewalks, ADA ramps, driveways, drainage improvements, pavement markings, traffic signal modifications, and other work on Troy Road from Franklin Avenue to 4th Avenue in Edwardsville. — Executed Nov 26 New Stutz Excavating, Inc. $909,557 ·
601–700 of 1,073‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.