20-00144-00-SP
- Let date
- Friday, January 19, 2024
- Contract
- 97820 · job page
- District
- District 8
- County
- Marion
- Highway
- Limits
- HMA Asphalt shoulders with rumble strips, guardrail and terminals, pipe culvets and ditch grading on Green Street Road from Brewery Hill Road to Farthing Rd. Project includes the replacement of the outside deck beam on the structure over Crooked Creek.
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Guinzy Construction,Inc. Low bidder | $3,423,535 | ||
| 2 | Shores Builders, Inc. | $4,022,744 | +17.5% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Guinzy Construc… | #2 Shores Builders… |
|---|---|---|---|---|---|---|---|
| 1 | X2501000 | SEEDING CL 2 SPL | 15.25 | ACRE | $1,318.44 | $4,710.00 | |
| 2 | X4401198 | HMA SURF REM VAR DP | 254 | SQ YD | $59.81 | $54.65 | |
| 3 | X5010010 | REM EX PPC DECK BEAMS | 319 | SQ FT | $55.45 | $60.00 | |
| 4 | X6330725 | SPBGR (SHORT RADIUS) | 412.5 | FOOT | $68.55 | $78.00 | |
| 5 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $114,058.58 | $313,980.00 | |
| 6 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $50,406.89 | $39,552.00 | |
| 7 | Z0016702 | DETOUR SIGNING | 1 | L SUM | $26,193.42 | $13,770.00 | |
| 8 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | $0.8000 | |
| 9 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | $15.00 | |
| 10 | 20100110 | TREE REMOV 6-15 | 32 | UNIT | $214.02 | $110.85 | |
| 11 | 20100210 | TREE REMOV OVER 15 | 74 | UNIT | $205.63 | $154.51 | |
| 12 | 20100500 | TREE REMOV ACRES | 1.75 | ACRE | $9,248.15 | $23,950.63 | |
| 13 | 20101000 | TEMPORARY FENCE | 130 | FOOT | $12.88 | $7.70 | |
| 14 | 20200100 | EARTH EXCAVATION | 5,983 | CU YD | $43.49 | $40.76 | |
| 15 | 20400800 | FURNISHED EXCAVATION | 9,131 | CU YD | $65.03 | $33.75 | |
| 16 | 28000250 | TEMP EROS CONTR SEED | 1,501 | POUND | $2.22 | $2.99 | |
| 17 | 28000305 | TEMP DITCH CHECKS | 212 | FOOT | $35.30 | $17.14 | |
| 18 | 28000400 | PERIMETER EROS BAR | 8,672 | FOOT | $1.77 | $2.15 | |
| 19 | 28000500 | INLET & PIPE PROTECT | 80 | EACH | $92.65 | $67.41 | |
| 20 | 28100209 | STONE RIPRAP CL A5 | 140 | TON | $56.99 | $85.20 | |
| 21 | 28200200 | FILTER FABRIC | 130 | SQ YD | $6.65 | $7.80 | |
| 22 | 35100500 | AGG BASE CSE A 6 | 238 | SQ YD | $32.99 | $70.23 | |
| 23 | 35100700 | AGG BASE CSE A 8 | 480 | SQ YD | $22.38 | $51.59 | |
| 24 | 40200500 | AGG SURF CSE A 6 | 3,536 | SQ YD | $21.07 | $35.24 | |
| 25 | 40600275 | BIT MATLS PR CT | 1,079 | POUND | $3.41 | $4.06 | |
| 26 | 40600290 | BIT MATLS TACK CT | 173 | POUND | $20.41 | $24.30 | |
| 27 | 40602978 | HMA BC IL-9.5 N50 | 126 | TON | $378.82 | $450.91 | |
| 28 | 40604050 | HMA SC IL-9.5 C N50 | 65 | TON | $276.27 | $328.85 | |
| 29 | 40800050 | INCIDENTAL HMA SURF | 43 | TON | $671.83 | $799.69 | |
| 30 | 44000100 | PAVEMENT REM | 480 | SQ YD | $18.48 | $17.02 | |
| 31 | 48203021 | HMA SHOULDERS 6 | 19,607 | SQ YD | $49.78 | $59.26 | |
| 32 | 50102400 | CONC REM | 5.3 | CU YD | $1,685.61 | $362.26 | |
| 33 | 50105220 | PIPE CULVERT REMOV | 2,047 | FOOT | $32.15 | $36.60 | |
| 34 | 50200100 | STRUCTURE EXCAVATION | 7 | CU YD | $65.53 | $74.40 | |
| 35 | 50300225 | CONC STRUCT | 8.4 | CU YD | $3,326.85 | $3,600.00 | |
| 36 | 50300280 | CONCRETE ENCASEMENT | 1.9 | CU YD | $1,108.95 | $1,200.00 | |
| 37 | 50400405 | P P CONC DK BM 21 DP | 639 | SQ FT | $131.06 | $129.32 | |
| 38 | 50800105 | REINFORCEMENT BARS | 1,385 | POUND | $3.53 | $3.72 | |
| 39 | 50900205 | STEEL RAILING TY S1 | 82 | FOOT | $272.20 | $306.60 | |
| 40 | 51201400 | FUR STL PILE HP10X42 | 80 | FOOT | $43.35 | $47.40 | |
| 41 | 51202305 | DRIVING PILES | 80 | FOOT | $1.01 | $1.20 | |
| 42 | 51203400 | TEST PILE ST HP10X42 | 1 | EACH | $11,593.58 | $12,615.60 | |
| 43 | 542A0220 | P CUL CL A 1 15 | 402 | FOOT | $74.64 | $175.96 | |
| 44 | 542A0223 | P CUL CL A 1 18 | 74 | FOOT | $119.79 | $148.35 | |
| 45 | 542A0229 | P CUL CL A 1 24 | 44 | FOOT | $160.60 | $147.83 | |
| 46 | 542A1060 | P CUL CL A 2 15 | 10 | FOOT | $214.17 | $197.84 | |
| 47 | 542A1066 | P CUL CL A 2 21 | 6 | FOOT | $210.95 | $325.67 | |
| 48 | 542A1069 | P CUL CL A 2 24 | 6 | FOOT | $210.95 | $327.11 | |
| 49 | 542C0220 | P CUL CL C 1 15 | 1,288 | FOOT | $66.36 | $120.29 | |
| 50 | 542C0223 | P CUL CL C 1 18 | 160 | FOOT | $75.29 | $295.53 | |
| 51 | 542C0229 | P CUL CL C 1 24 | 94 | FOOT | $146.02 | $158.63 | |
| 52 | 542C0241 | P CUL CL C 1 36 | 6 | FOOT | $325.12 | $553.81 | |
| 53 | 542C1060 | P CUL CL C 2 15 | 112 | FOOT | $66.60 | $163.15 | |
| 54 | 542C5479 | P CUL CL C 1 EQRS 24 | 54 | FOOT | $109.51 | $205.85 | |
| 55 | 54248510 | CONCRETE COLLAR | 5 | CU YD | $536.95 | $1,153.92 | |
| 56 | 58100200 | WATERPRF MEMBRANE SYS | 290 | SQ YD | $42.70 | $50.83 | |
| 57 | 59300100 | CONTR LOW-STRENG MATL | 5 | CU YD | $151.22 | $169.20 | |
| 58 | 63000003 | SPBGR TY A 9FT POSTS | 4,712.5 | FOOT | $42.34 | $52.50 | |
| 59 | 63100075 | TRAF BAR TERM T5A | 4 | EACH | $1,512.21 | $1,620.00 | |
| 60 | 63100167 | TR BAR TRM T1 SPL TAN | 36 | EACH | $3,830.92 | $4,380.00 | |
| 61 | 63200310 | GUARDRAIL REMOV | 387 | FOOT | $8.07 | $16.20 | |
| 62 | 64200108 | SHOULDER RUM STRIP 8 | 35,866 | FOOT | $0.1800 | $0.3000 | |
| 63 | 67100100 | MOBILIZATION | 1 | L SUM | $199,761.92 | $310,661.50 | |
| 64 | 70300100 | SHORT TERM PAVT MKING | 28 | FOOT | $10.67 | $0.5000 | |
| 65 | 70300150 | SHRT TRM PAVT MK REM | 10 | SQ FT | $71.40 | $1.00 | |
| 66 | 72000100 | SIGN PANEL T1 | 276 | SQ FT | $43.19 | $27.30 | |
| 67 | 72400310 | REMOV SIGN PANEL T1 | 198 | SQ FT | $22.85 | $7.56 | |
| 68 | 72501000 | TERMINAL MARKER - DA | 36 | EACH | $50.41 | $49.50 | |
| 69 | 72800100 | TELES STL SIN SUPPORT | 555 | FOOT | $8.57 | $22.80 | |
| 70 | 78001110 | PAINT PVT MK LINE 4 | 1,109 | FOOT | $1.61 | $5.41 | |
| 71 | 78200005 | GRDRAIL REF TYPE A | 88 | EACH | $10.08 | $12.30 |