Filtered by: District: District 7 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 20, 2023 | 74A91 | FayetteDistrict 7 | Abutment modification, bridge deck scarification, full depth deck patching, curb repair, bridge deck overlay, deck drain replacement, new approach slab and pavement connectors on SN 026-0036 carrying US 51 over Old Hickory Creek, 2.5 miles south of US 40. | — | Executed | Stutz Excavating, Inc. $742,000 · | ||
| Jan 20, 2023 | 74B69 | CumberlandDistrict 7 | Removal of dead trees along I-70 and US 40 in Cumberland County. | — | Rejected | Mosley Construction 1, LLC $304,000 · | ||
| Jan 20, 2023 | 74B70 | MaconShelbyDistrict 7 | 42 miles of weed control on US 51 from the Christian County line and on I-72 from US 51 to the Piatt County line. | — | Executed | The Daltons Inc. $72,932 · | ||
| Jan 20, 2023 | 74B83 | VariousDistrict 7 | 47.3 miles of weed control on I-57 from the Marion County line to the Shelby County line and on I-70 from the Fayette County line to the Cumberland County line. | — | Executed | The Daltons Inc. $86,756 · | ||
| Jan 20, 2023 | 95927 | ClarkDistrict 7 | Curb and Gutter, Sidewalks, ADA Ramps, Storm Sewers, and Street Lights, at various locations in Marshall. | — | Rejected | Feutz Contractors, Inc. $1,521,510 · | ||
| Mar 10, 2023 | 74212 | EffinghamDistrict 7 | PCC pavement, pavement removal, earthwork, curb and gutter, storm sewer, traffic signals, highway lighting and sidewalks on US 40 and IL 33 from west of Raney Street to East of Walnut Street in Effingham. | — | Executed | McCarthy Improvement Company $21,800,000 · | ||
| Mar 10, 2023 | 74547 | RichlandDistrict 7 | 3.6 miles of patching, milling and design overlay on US 50 from 0.6 miles west of St. Marie Road to 4 miles west of the Lawrence County line. | — | Executed | Ambraw Asphalt Materials, Inc. $3,497,354 · | ||
| Mar 10, 2023 | 74574 | WayneDistrict 7 | Patching, milling, resurfacing, designed overlay, ADA improvements and traffic signals on US 45 / IL 15 in Fairfield, eastbound from SW 7th to SE 9th and westbound from SE 9th to 0.1 miles west of Market Street. | — | Executed | Howell Paving, Inc. $6,973,340 · | ||
| Mar 10, 2023 | 74739 | MaconDistrict 7 | 4.1 miles of patching, resurfacing, median and curb repairs, traffic signal upgrades and ADA upgrades on IL 121 from US 36 in Decatur to the southern corporate limits of Mt. Zion. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $11,912,205 · | ||
| Mar 10, 2023 | 74976 | MaconDistrict 7 | Milling, resurfacing and aggregate shoulders on IL 105 from 0.3 miles east of Bender Drive to the Piatt County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $4,183,455 · | ||
| Mar 10, 2023 | 74B16 | MaconDistrict 7 | Bridge bearing replacement on SN058-0084 and SN 058-0085 on IL 48 approximately 2.5 miles east of Forsyth. | — | Executed | Sangamo Construction Company $487,391 · | ||
| Mar 10, 2023 | 74B21 | VariousDistrict 7 | Sealing the bridge decks of 127 structures on various routes in various counties of District 7. | — | Executed | All States Painting, Inc. $147,989 · | ||
| Mar 10, 2023 | 74B45 | FayetteDistrict 7 | 1.5 miles of patching on US 51, US 40, IL 185 from Imco Drive to the Kaskaskia River in Vandalia. | — | Executed | Beniach Construction Co., Inc. $487,187 · | ||
| Mar 10, 2023 | 74B49 | EffinghamDistrict 7 | Patching at various locations: I-57 from the Clay County line to mile marker 153; West Fayette Avenue from Outerbelt West to 0.1 miles west of Raney Street in Effingham; US 40/Henrietta Street from 0.1 miles south of Grove Avenue to Grove Avenue in Effingham. | — | Executed | G. M. Sipes Construction, Inc. $566,009 · | ||
| Mar 10, 2023 | 74B58 | MaconDistrict 7 | 4.3 miles of partial width resurfacing at various locations on Old US 51 from US 36 (Eldorado) to IL 121 (Pershing) in Decatur. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $549,728 · | ||
| Mar 10, 2023 | 74B71 | EffinghamDistrict 7 | 0.2 miles of weed control and landscaping on IL 32/33 from Marguerite Lane to 0.1 miles northwest of Woodland Drive in Effingham. | — | Executed | Endrizzi Contracting, Inc $209,914 · | ||
| Apr 28, 2023 | 74842 | ClarkDistrict 7 | Bridge deck replacement on SN 012-0052 carrying I-70 over Mill Creek, 5.5 miles west of IL 1. | — | Executed | Sangamo Construction Company $2,065,929 · | ||
| Apr 28, 2023 | 74974 | ClarkDistrict 7 | 12.4 miles of resurfacing and new shoulders on IL 1 from 1350 North to 0.3 miles north of the Crawford County line. | — | Executed | Howell Paving, Inc. $9,318,315 · | ||
| Apr 28, 2023 | 74A93 | ClayFayetteDistrict 7 | 8.8 miles of crack and joint sealing from the Marion County line to the Effingham County line. | — | Executed | Freehill Asphalt, Inc. $403,894 · | ||
| Apr 28, 2023 | 74A94 | CumberlandShelbyDistrict 7 | Routing and sealing cracks at the centerline and edge of pavement on I-57 from the Effingham County line to US 45. | — | Executed | Complete Asphalt Service Co. $312,674 · | ||
| Apr 28, 2023 | 74B22 | MoultrieDistrict 7 | 8.6 miles of resurfacing on IL 133 from IL 32 at Lovington to the Douglas County line. | — | Executed | Howell Paving, Inc. $3,461,273 · | ||
| Apr 28, 2023 | 74B24 | ColesDistrict 7 | 3.7 miles of crack and joint sealing on I-57 from the Cumberland County line to 0.5 miles west of US 45 at Mattoon. | — | Executed | Complete Asphalt Service Co. $166,685 · | ||
| Apr 28, 2023 | 74B36 | MaconDistrict 7 | Bridge painting on SN 058-0091 on I-72 at the Argenta interchange. | — | Executed | Venus Painting Co. $464,933 · | ||
| Apr 28, 2023 | 74B44 | LawrenceDistrict 7 | Tree removal on IL 33 from 0.5 miles north of US 50 to 0.5 miles south of US 50. | — | Executed | Endrizzi Contracting, Inc $448,125 · | ||
| Apr 28, 2023 | 74B46 | MaconDistrict 7 | Patching and partial width resurfacing at 2 locations: 1) IL 105 from 0.1 miles east of 26th Street to Bender Drive in Decatur; 2) IL 121 at the Garfield overpass in Decatur. | — | Executed | Beniach Construction Co., Inc. $646,265 · | ||
| Apr 28, 2023 | 74B50 | MaconDistrict 7 | 7.9 miles of longitudinal joint repair on I-72 from US 36 to US 51. | — | Rejected | Illinois Valley Paving, a div of UCM, Inc. $919,562 · | ||
| Apr 28, 2023 | 74B54 | ClarkWabashDistrict 7 | Bridge painting at various locations in Clark and Wabash Counties. | — | Executed | Venus Painting Co. $577,241 · | ||
| Apr 28, 2023 | 74B55 | MaconDistrict 7 | Bridge painting at various locations in Macon County. | — | Executed | Venus Painting Co. $880,724 · | ||
| Apr 28, 2023 | 74B56 | EffinghamFayetteDistrict 7 | Bridge painting at various locations in Fayette and Effingham Counties. | — | Executed | Venus Painting Co. $474,182 · | ||
| Apr 28, 2023 | 74B84 | MaconDistrict 7 | Fence replacement at the Decatur Maintenance Yard. | — | Executed | Lake Contracting, Inc. $211,788 · | ||
| Apr 28, 2023 | 74C06 | VariousDistrict 7 | Guardrail repair at specific locations due to motorist damage and on call repair of guardrail. | — | Executed | COLLINS & HERMANN, INC. $1,076,082 · | ||
| Apr 28, 2023 | 74C18 | VariousDistrict 7 | Repairing, replacing, servicing and maintaining various electrical systems throughout District 7. | — | Rejected | Bodine Electric of Decatur $1,099,033 · | ||
| Apr 28, 2023 | 95928 | FayetteDistrict 7 | Replace the bridge carrying TR 178 over Steve Branch of Shobonier. | — | Executed | C-Hill Civil Contractors, Inc. $310,889 · | ||
| Apr 28, 2023 | 95929 | FayetteDistrict 7 | Replace the bridge carrying TR 78 over Raccoon Creek, 4 miles southwest of Vandalia. | — | Executed | C-Hill Civil Contractors, Inc. $404,888 · | ||
| Apr 28, 2023 | 95930 | WayneDistrict 7 | Resurfacing IL 161 Extension from the Marion County line to CH 12. | — | Executed | E. T. Simonds Construction Company $2,872,260 · | ||
| Apr 28, 2023 | 95932 | LawrenceDistrict 7 | Replace existing pipe culverts with a single span precast deck beam bridge to carry 220 East Road over a tributary to Muddy Creek. | — | Executed | Lake Contracting, Inc. $709,450 · | ||
| Jun 16, 2023 | 74477 | MaconDistrict 7 | 2.7 miles of patching, resurfacing, sidewalk, curb and gutter replacement and new signals on IL 121 in Decatur. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $11,583,263 · | ||
| Jun 16, 2023 | 74651 | WayneDistrict 7 | Removing and replacing SN 096-0005 carrying IL 15 over Miller Creek, 1 mile west of Sims Road. | — | Executed | E. T. Simonds Construction Company $1,840,237 · | ||
| Jun 16, 2023 | 74702 | MaconDistrict 7 | Bridge work, pavement patching, HMA and concrete surface removal, HMA resurfacing, detector loops, inlet adjustments, curb and gutter repairs, ADA ramps, and pavement markings on US 36 from IL 48 to Church Street in Decatur. | — | Rejected | Illinois Valley Paving, a div of UCM, Inc. $8,361,505 · | ||
| Jun 16, 2023 | 74799 | MoultrieDistrict 7 | 11.1 miles of designed overlay, inlay resurfacing and ADA improvements on IL 121 from 0.7 miles southeast of Dalton City to 0.2 miles west of IL 32, west of Sullivan. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $10,801,690 · | ||
| Jun 16, 2023 | 74800 | MaconDistrict 7 | 8 miles of patching, pipe underdrain replacement and resurfacing on US 51 from the DeWitt County line to 0.1 miles north of Forsyth Road. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $24,477,448 · | ||
| Jun 16, 2023 | 74812 | ColesDistrict 7 | 2.7 miles of patching and resurfacing on IL 130 from Madison Avenue to 1.8 miles south of IL 16 in Charleston. | — | Executed | Howell Paving, Inc. $2,757,361 · | ||
| Jun 16, 2023 | 74975 | JasperDistrict 7 | 10.3 miles of patching, milling, resurfacing, HMA shoulders, aggregate wedge shoulders and rumble strips on IL 130 from Edwards Street in Newton to the Richland County line. | — | Executed | Howell Paving, Inc. $7,289,962 · | ||
| Jun 16, 2023 | 74977 | ClayRichlandDistrict 7 | Resurfacing on US 50 from 2.5 miles east of US 45, east of Flora, to 1.6 miles east of the Richland County line. | — | Executed | Howell Paving, Inc. $4,953,553 · | ||
| Jun 16, 2023 | 74A06 | ClarkCrawfordDistrict 7 | 11.7 miles of patching, milling, resurfacing and aggregate shoulders on IL 1 from 0.3 miles north of the Clark County line to IL 33. | — | Executed | Ambraw Asphalt Materials, Inc. $7,826,400 · | ||
| Jun 16, 2023 | 74A13 | EffinghamDistrict 7 | Deck replacement on SN 025-0083 carrying US 45 over Big Salt Creek, 3 miles south of IL 37. | — | Executed | Plocher Construction Company, Inc. $2,319,476 · | ||
| Jun 16, 2023 | 74A88 | EffinghamDistrict 7 | Patching, resurfacing and aggregate shoulders on IL 33 from Salt Creek in Effingham to west of Pine Street in Dietrich. | — | Executed | Howell Paving, Inc. $2,949,123 · | ||
| Jun 16, 2023 | 74B09 | WayneDistrict 7 | 7.3 miles of standard overlay on IL 15 from 0.1 miles west of County Road 870E, north of Sims, to 0.3 miles west of US 45, west of Fairfield. | — | Executed | Howell Paving, Inc. $4,525,156 · | ||
| Jun 16, 2023 | 74B23 | ColesDistrict 7 | 5 miles of milling, resurfacing and aggregate shoulders on IL 130 from Fairgrange Road, north of Charleston, to 0.1 miles north of Maple Avenue in Charleston. | — | Executed | Ne-Co Asphalt Co., Inc. $1,477,664 · | ||
| Jun 16, 2023 | 74B98 | VariousDistrict 7 | Bridge rail repairs at 4 locations: 1) I-70 over Lick Creek, 1.7 miles east of the Bond County line; 2) Old IL 250 over a stream 0.6 miles west of Claremont Road; 3) Old IL 140 over a stream 0.2 miles east of Hagarstown; 4) US 45 over Buttermilk Ditch, at Etna Road. | — | Executed | Samron Midwest Contracting, Inc. $393,829 · | ||
| Jun 16, 2023 | 74C05 | CumberlandDistrict 7 | Patching on IL 130 and resurfacing on the I-70 exit ramps, both located at the I-70 and IL 130 interchange. | — | Executed | Howell Paving, Inc. $1,080,177 · | ||
| Jun 16, 2023 | 74C30 | VariousDistrict 7 | Guardrail repair at specific locations and on an on-call basis throughout District 7. | — | Executed | Kujo, Inc. $609,300 · | ||
| Jun 16, 2023 | 95901 | LawrenceDistrict 7 | Replace existing structure with a thirteen-span PPC IL36N beam bridge with HMA approaches on Wabash Cannonball Road over the Wabash River overflow in St. Francisville. | — | Executed | Samron Midwest Contracting, Inc. $11,635,682 · | ||
| Jun 16, 2023 | 95935 | EffinghamDistrict 7 | HMA resurfacing with aggregate shoulders, and guardrail replacement on East 1600th Avenue from North 700th Street to North 1000th Street. | — | Executed | Howell Paving, Inc. $1,759,700 · | ||
| Jun 16, 2023 | 95937 | LawrenceDistrict 7 | HMA resurfacing with pip culvert replacement on Lancaster Road from Sand Barrens Lane to the Wabash County line. | — | Executed | Ambraw Asphalt Materials, Inc. $1,389,384 · | ||
| Jun 16, 2023 | 95938 | LawrenceDistrict 7 | Resurfacing on Lexington Avenue from IL 1 to 12th Street, and sidewalk improvements at four intersections in Lawrenceville. | — | Active | Kieffer Bros. Construction Co., Inc. $886,837 · | ||
| Jun 16, 2023 | 95939 | MoultrieDistrict 7 | Remove and replace guardrail at various locations in Moultrie County. | — | Rejected | Midwest Fence Corporation $508,101 · | ||
| Sep 22, 2023 | 46618 | VariousDistrict 7 | Pavement marking rehabilitation throughout District 7. | — | Executed | Varsity Striping & Construction Co. $743,370 · | ||
| Sep 22, 2023 | 74359 | LawrenceDistrict 7 | Bridge replacement of SN 051-0007 carrying IL 1 over Indian Creek, 2 miles south of Lawrenceville. | — | Executed | Sangamo Construction Company $3,629,755 · | ||
| Sep 22, 2023 | 74828 | MaconDistrict 7 | Overlay with ADA, signal and intersection improvements on US 51 from 0.1 miles miles north of Forsyth Road to I-72 in Decatur. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $13,973,388 · | ||
| Sep 22, 2023 | 74978 | ClayDistrict 7 | 0.8 miles of HMA resurfacing and ADA work on Main Street in Clay City from N 1st Street to US 50. | — | Executed | Howell Paving, Inc. $1,266,058 · | ||
| Sep 22, 2023 | 74C27 | CumberlandDistrict 7 | Tree removal on I-70 eastbound from station 60+90 to 653+57 and on US 40 from County Road 700E to County Road 2275E. | — | Executed | Thor General Contracting LLC $241,020 · | ||
| Sep 22, 2023 | 74C38 | RichlandDistrict 7 | Emulsion tank installation at the Olney Maintenance Yard. | — | Active | Samron Midwest Contracting, Inc. $222,222 · | ||
| Sep 22, 2023 | 95923 | WayneDistrict 7 | Replace existing structure with a single-cell concrete box culvert to carry 1550 N. Road over Skillet Fork Tributary. | — | Executed | Samron Midwest Contracting, Inc. $297,705 · | ||
| Sep 22, 2023 | 95942 | MoultrieDistrict 7 | Replace existing structure with a single span prestressed precast concrete deck beam bridge to carry 1400 North Road over Wilborn Creek. | — | Executed | C-Hill Civil Contractors, Inc. $477,777 · | ||
| Nov 17, 2023 | 74471 | FayetteDistrict 7 | 3.4 miles of resurfacing on US 40 from 0.5 miles west of the I-70 interchange to IL 185 in Vandalia, resurfacing the I-70 / US 40 ramps at the Vandalia Vandalia interchange and joint repairs and overlay to SN 026-0087. | — | Executed | Howell Paving, Inc. $5,506,589 · | ||
| Nov 17, 2023 | 74B29 | MaconDistrict 7 | Bridge deck overlay, joint replacement / repair and other bridge deck repairs on 3 structures: 1) SN 058-0060 carrying TR 4 (South Acom Road) over I-72; 2) SN 058-0062 carrying CH 27 (Lincoln Memorial Parkway) over I-72; 3) SN 058-0065 carrying Twin Lakes Road over I-72 just west of Decatur. | — | Executed | Freesen, a div of UCM, Inc. $1,224,997 · | ||
| Nov 17, 2023 | 74B30 | MaconDistrict 7 | Bridge deck overlay, joint repair and approach pavement on I-72 over Spring Creek, 1.3 miles east of Forsyth. | — | Executed | Freesen, a div of UCM, Inc. $1,953,030 · | ||
| Nov 17, 2023 | 74B31 | FayetteDistrict 7 | Bridge repairs on SN 026-0071 carrying IL 185 over I-57 in Farina. | — | Executed | Samron Midwest Contracting, Inc. $1,077,997 · | ||
| Nov 17, 2023 | 74B33 | MaconDistrict 7 | Bridge deck repair and overlay on SN 058-0129 carrying IL 121 over South Fork Creek, 0.7 miles east of the Logan County line. | — | Executed | Freesen, a div of UCM, Inc. $498,028 · | ||
| Nov 17, 2023 | 74B34 | EffinghamDistrict 7 | Bridge deck overlay, bridge joint replacement, deck drain replacement, bridge deck patching on SN 025-0089 carrying IL 37 over the Little Wabash River, 0.5 miles south of I-57. | — | Executed | Sangamo Construction Company $761,969 · | ||
| Nov 17, 2023 | 74B35 | ClarkDistrict 7 | Bridge deck overlay and joint replacement and repairs on SN 012-0025 carrying US 40 over I-70. | — | Executed | Sangamo Construction Company $1,282,944 · | ||
| Nov 17, 2023 | 74B37 | WabashDistrict 7 | Washing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel. | — | Executed | |||
| Nov 17, 2023 | 74B39 | MaconDistrict 7 | Bridge deck overlay, joint replacement, deck patching, structural concrete repair, crashwall extensions and HMA approaches on SN 058-0087 carrying Kirby Road over I-72, northeast of Decatur. | — | Executed | Freesen, a div of UCM, Inc. $638,193 · | ||
| Nov 17, 2023 | 74C65 | CumberlandDistrict 7 | Bridge joint replacement / repair, bridge deck repairs and bridge deck overlay on SN 018-0003 and 018-0004 carrying I-57 over US 45 and SN 018-0001 and 018-0002 carrying I-57 over the Decatur and Eastern Illinois Railroad, all located northeast of Neoga. | — | Executed | Path Construction Company, Inc. $1,994,773 · | ||
| Nov 17, 2023 | 95941 | MoultrieDistrict 7 | Sidewalk Construction on various routes within the City of Sullivan. | — | Executed | A & R Mechanical Service, Inc. $288,741 · | ||
| Jan 19, 2024 | 74761 | ClayDistrict 7 | 6.8 miles of resurfacing, ADA upgrades, culvert replacement, aggregate shoulders and patching on US 45 from 0.1 miles north of Vandalia Road in Louisville to 0.3 miles south of US 50. | — | Executed | Howell Paving, Inc. $6,459,330 · | ||
| Jan 19, 2024 | 74A09 | LawrenceDistrict 7 | Superstructure and abutment replacement on SN 051-0022 and SN 051-0023 carrying US 50 over Township Road 262, 2.4 miles east of Airport Interchange. | — | Executed | Samron Midwest Contracting, Inc. $3,362,362 · | ||
| Jan 19, 2024 | 74B27 | CumberlandDistrict 7 | Bridge joint repairs, concrete deck overlay, HMA shoulders and resurfacing at SN 018-0058 carrying IL 130 over Hurricane Creek, approximately 3.5 miles north of Greenup. | — | Executed | Samron Midwest Contracting, Inc. $918,918 · | ||
| Jan 19, 2024 | 74B28 | MaconDistrict 7 | Bridge deck overlay, bridge joint replacement / repair and bridge approach work on SN 058-0113 and 058-0114 carrying US 51 over Stevens Creek, 0.2 miles north of Emery Road. | — | Executed | Freesen, a div of UCM, Inc. $1,145,239 · | ||
| Jan 19, 2024 | 74B32 | WabashDistrict 7 | Installation of strip seal expansion joints, bridge deck scarification, deck patching, bridge deck fly ash or ground granulated blast furnace slag concrete overlay and diamond grinding on SN 093-0001 carrying IL 1 over Raccoon Creek, south of the Lawrence County line. | — | Executed | Samron Midwest Contracting, Inc. $674,674 · | ||
| Jan 19, 2024 | 74B40 | WayneDistrict 7 | Bridge deck overlay and bridge joint replacement/repairs on SN 096-0011 carrying IL 15 over a stream, 1 mile west of County Highway 3. | — | Executed | Samron Midwest Contracting, Inc. $393,393 · | ||
| Jan 19, 2024 | 74B65 | RichlandDistrict 7 | Centerline milled rumble strips and pavement marking on IL 250 from US 50, west of Noble, to North Avenue in Olney. | — | Executed | Dunn Company $95,255 · | ||
| Jan 19, 2024 | 95933 | CrawfordDistrict 7 | Replace the bridge carrying TR 93 over Business Creek, 4 miles north of Oblong. | — | Rejected | |||
| Jan 19, 2024 | 95936 | RichlandDistrict 7 | replace the bridge carrying TR 35A over West Fork of Coon Creek, 3 miles southwest of Dundas. | — | Executed | C-Hill Civil Contractors, Inc. $498,833 · | ||
| Mar 8, 2024 | 74562 | ClarkDistrict 7 | Replacement of SN 012-0018 carrying US 40 over North Fork Embarras River, 0.6 miles west of Washington Street in Martinsville. | — | Active | Sangamo Construction Company $4,296,237 · | ||
| Mar 8, 2024 | 74903 | ColesDistrict 7 | 9.3 miles of HMA surface removal, binder and surface courses, HMA and aggregate shoulders, longitudinal joint sealant and cured-in-place pipe liner at various locations in Charleston. | — | Executed | Howell Paving, Inc. $4,864,767 · | ||
| Mar 8, 2024 | 74980 | CrawfordDistrict 7 | 0.8 miles of inlay resurfacing on IL 33 from 0.2 miles east of North Glendale Road to Park Forest Drive in Robinson. | — | Executed | Ambraw Asphalt Materials, Inc. $1,227,150 · | ||
| Mar 8, 2024 | 74981 | FayetteDistrict 7 | Patching, milling and resurfacing on I-70 from the Kaskaskia River east of Vandalia to 1 mile west of US 40. | — | Executed | Howell Paving, Inc. $4,499,036 · | ||
| Mar 8, 2024 | 74A64 | CumberlandDistrict 7 | 2.8 miles of patching, resurfacing and shoulders on IL 49 from the Clark County line to the Jasper County line. | — | Executed | Ne-Co Asphalt Co., Inc. $1,801,329 · | ||
| Mar 8, 2024 | 74B82 | EffinghamDistrict 7 | 3.3 miles of patching, milling and resurfacing on IL 32/33 from 0.2 miles west of IL 32 to 0.2 miles west of Ford Avenue in Effingham. | — | Executed | Howell Paving, Inc. $4,287,220 · | ||
| Mar 8, 2024 | 74B88 | ClayDistrict 7 | 6.5 miles of milling and resurfacing on US 45 from Bible Grove Road to 0.1 miles north of Vandalia Road in Louisville. | — | Executed | Howell Paving, Inc. $5,487,005 · | ||
| Mar 8, 2024 | 74C17 | MaconDistrict 7 | 4 miles of patching, resurfacing and aggregate wedge shoulders on IL 121 from 0.2 miles east of Burgener Drive in Mt. Zion to 0.4 miles west of IL 128. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $3,276,444 · | ||
| Mar 8, 2024 | 74C40 | VariousDistrict 7 | Sealing the bridge decks on 65 structures on various routes in various counties of District 7. | — | Executed | M & M Concrete, Inc. $79,985 · | ||
| Mar 8, 2024 | 74C89 | ColesDistrict 7 | 21.4 miles of weed control on I-57 in various counties of District 7. | — | Executed | The Daltons Inc. $66,177 · | ||
| Mar 8, 2024 | 95946 | ColesDistrict 7 | PCC sidewalks, ADA Ramps, and Curb and Gutter on Western Avenue from 43rd Street to Noyes Court in Mattoon. | — | Executed | Shores Builders, Inc. $163,684 · | ||
| Mar 8, 2024 | 95948 | CrawfordDistrict 7 | Resurface Trimble Road/Robinson Road from IL 1 to E 1150 Avenue. | — | Executed | Ambraw Asphalt Materials, Inc. $1,387,981 · | ||
| Mar 8, 2024 | 95950 | ShelbyDistrict 7 | Construction of a single-span PPC deck beam bridge with aggregate approach, channel excavation and seeding on 375 North Road on Matney Branch, 1.2 miles southeast of Oconee. | — | Executed | C-Hill Civil Contractors, Inc. $498,888 · | ||
| Apr 26, 2024 | 74443 | LawrenceDistrict 7 | Replacement of SN 051-0009 carrying US 50 over Muddy Creek, 0.5 miles east of Summer Road. | — | Executed | Sangamo Construction Company $3,650,480 · | ||
| Apr 26, 2024 | 74458 | FayetteDistrict 7 | 5.8 miles of resurfacing and ADA improvements on US 51 in the Village of Ramsey. | — | Executed | Howell Paving, Inc. $7,439,035 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.