| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 6, 2020 | 76N19 | MadisonDistrict 8 | Bridge joint repairs, bridge repairs, new 4.5- concrete bridge deck, HMA mill and fill on approaches with a 2- grade rise on IL 140 / IL 111 over Abandoned Quarry Spur, 0.1 miles east of IL 3 (SN 060-0199). | — | Executed | Keller Construction, Inc. $1,403,155 · | ||
| Nov 6, 2020 | 76N55 | MadisonDistrict 8 | Pump station repairs at the Venice Deep Wells on IL 3. | — | Executed | Hank's Excavating & Landscaping, Inc. $129,250 · | ||
| Nov 6, 2020 | 76N88 | MadisonSt. ClairDistrict 8 | Patching at 3 locations: US 67/IL 111 at Tolle Lane, IL 111 at Gateway Commerce Center, US 40 at IL 143 and South Morrison at Caseyville Road. | — | Executed | Kinney Contractors, Inc. $489,340 · | ||
| Jan 15, 2021 | 76K78 | MadisonDistrict 8 | Bridge deck sealing of the McKinley Bridge (Salisbury Street) over the Mississippi River. (SN 060-6002) | — | Executed | M & M Concrete, Inc. $47,964 · | ||
| Jan 15, 2021 | 76M48 | MadisonDistrict 8 | 5.1 miles of resurfacing on IL 157 from 0.2 miles north of Horseshoe Lake Road to 0.1 miles north of Chain of Rocks Road. | — | Executed | Christ Bros. Asphalt, Inc. $3,487,865 · | ||
| Jan 15, 2021 | 76M85 | MadisonDistrict 8 | 1.76 miles of resurfacing on IL 140 from IL 160 to the Bond County line. | — | Executed | Christ Bros. Asphalt, Inc. $1,729,690 · | ||
| Jan 15, 2021 | 76N40 | MadisonDistrict 8 | Traffic signal interconnect (CMAQ) on IL 157 from Horseshoe Lake Road to West Main Street in Collinsville. | — | Executed | Electrico, Inc. $242,161 · | ||
| Jan 15, 2021 | 76N86 | MadisonDistrict 8 | Resurfacing of Old Alton Edwardsville Road from 0.3 miles east of Wanda Road to Cahokia Creek Road. | — | Executed | The Kilian Corporation $254,049 · | ||
| Jan 15, 2021 | 76N91 | MadisonDistrict 8 | Patching on US 67 from 10th Street to 6th Street in Alton. | — | Executed | Charles E. Mahoney Co. $101,704 · | ||
| Jan 15, 2021 | 76P13 | JerseyMadisonDistrict 8 | Weed spraying along IL 100 from IL 96 to the Piasa Bird Monument and along IL IL 255 from I-270 to US 67. | — | Executed | The Daltons Inc. $39,763 · | ||
| Mar 5, 2021 | 76K69 | MadisonDistrict 8 | Bridge deck sealing on I-270 at the Chain of Rocks Bridge (SN 060-0345) and Mississippi River Bridge (SN 060-0035). | — | Executed | M & M Concrete, Inc. $135,671 · | ||
| Mar 5, 2021 | 76M84 | MadisonDistrict 8 | 6.7 miles of standard overlay resurfacing on IL 159 from the Macoupin County line to 0.3 miles north of IL 140. | — | Executed | The Kilian Corporation $5,660,545 · | ||
| Mar 5, 2021 | 76N71 | MadisonDistrict 8 | 5.7 miles of 1 pass microsurfacing on IL 159 from 0.3 miles north of IL 140 to IL 143. | — | Executed | MISSOURI PETROLEUM PRODUCTS COMPANY LLC $564,227 · | ||
| Apr 23, 2021 | 76N73 | JerseyMadisonDistrict 8 | 8.2 miles of crack and joint sealing on IL 3 from 0.04 miles north of Pierce Lane to IL 109. | — | Executed | Complete Asphalt Service Co. $91,891 · | ||
| Apr 23, 2021 | 76N80 | MadisonDistrict 8 | Lighting improvements on I-55 at IL 143. | — | Executed | Gerstner Electric, Inc. $429,175 · | ||
| Apr 23, 2021 | 76P09 | MadisonDistrict 8 | Painting of the structure carrying IL 143 over I-55 (SN 060-0148). | — | Executed | ERA-Valdivia Contractors, Inc. $484,500 · | ||
| Apr 23, 2021 | 76P27 | MadisonDistrict 8 | Flood repair at the Grey-s Farm Pump Station; Frontage Road A, west of I-255 and north of Horseshoe Lake Road. | — | Executed | Keller Construction, Inc. $77,000 · | ||
| Apr 23, 2021 | 76P35 | MadisonDistrict 8 | 0.49 miles of patching on I-55/70 at the Maryville Weigh Station westbound on and off ramps, and on eastbound I-55/70 near IL 159. | — | Executed | RCS Construction, Inc. $122,416 · | ||
| Apr 23, 2021 | 97750 | MadisonDistrict 8 | Resurfacing Serento Road from Main Street to the Madison/Bond County Line. | — | Executed | The Kilian Corporation $539,097 · | ||
| Jun 11, 2021 | 76G57 | MadisonDistrict 8 | 4.8 miles of resurfacing and ADA improvements on IL 111/3 from Alby Street to Broadway in Alton. | — | Executed | Charles E. Mahoney Co. $5,947,763 · | ||
| Jun 11, 2021 | 76M36 | MadisonDistrict 8 | Discharge box culvert replacement at the Collinsville Pump Station #2 east of I-255, south of I-55/70. | — | Executed | Stutz Excavating, Inc. $54,536 · | ||
| Jun 11, 2021 | 76N72 | MadisonDistrict 8 | 2.7 miles of SMART overlay along IL 111/IL 267/US 67 from the Jersey County line to 0.1 miles north of Airport Road in Godfrey. | — | Executed | Charles E. Mahoney Co. $1,138,537 · | ||
| Jun 11, 2021 | 76P06 | MadisonSt. ClairDistrict 8 | Traffic signal repair and replacement at various locations: 1) IL 3 at Monsanto Avenue; 2) IL 3 at IL 157; 3) IL 15 at Racehorse Road; 4) IL 157 at Kazilek; 5) IL 140 at Stanley Road; 6) US 50 at Smiley Street. | — | Executed | Wissehr Electric, Inc. $433,531 · | ||
| Jun 11, 2021 | 76P33 | MadisonDistrict 8 | Traffic signal modernization on IL 111/US 67/ IL 143 from Lars Hoffman Crossing to IL 143. | — | Executed | Wissehr Electric, Inc. $745,299 · | ||
| Jun 11, 2021 | 76P47 | MadisonSt. ClairDistrict 8 | Railroad interconnect at 4 locations: 1) US 67 at Ridge, 2) US 67 at Henry, 3) US 40 at Douglas, 4) Lebanon Avenue at West Boulevard. | — | Executed | Wissehr Electric, Inc. $197,580 · | ||
| Jun 11, 2021 | 76P52 | MadisonDistrict 8 | Traffic signal cabinet replacement at multiple locations: 1) IL 3/IL 111 at Seminary Street in Alton, 2) IL 3 at IL 143 in Wood River, 3) IL 111 at IL 140 in Bethalto, 4) IL 111 at Horseshoe Lake Pond in Pontoon Beach, 5) IL 143 / IL 157 at Buchanan Street in Edwardsville. | — | Executed | Electrico, Inc. $124,353 · | ||
| Jun 11, 2021 | 97753 | MadisonDistrict 8 | Resurface Seiler Road from Bivens Rd. to IL 159. | — | Executed | The Kilian Corporation $696,392 · | ||
| Jun 11, 2021 | 97754 | MadisonDistrict 8 | Pavement reconstruction on Wood River Ave. from 3rd Street to south of 1st Street in Alton. | — | Executed | Stutz Excavating, Inc. $1,117,585 · | ||
| Jun 11, 2021 | 97755 | MadisonDistrict 8 | Replace the bridge carrying Troy-Fallon Road over Mill Creek, 0.3 mile north of Lebanon Road. | — | Executed | Plocher Construction Company, Inc. $1,159,400 · | ||
| Jul 30, 2021 | 76N17 | MadisonDistrict 8 | Bridge repair, HMA overlay and joint repair on IL 11 over the Union Pacific Railroad (SN 060-0122) approximately 2 miles north of I-270 and on IL 111 over the Norfolk Southern Railroad and an access road (SN 060-0123) approximately 1.2 miles north of I-270. | — | Executed | Keeley & Sons, Inc. $1,898,717 · | ||
| Jul 30, 2021 | 76P28 | MadisonDistrict 8 | 3.9 miles of resurfacing and design overlay on IL 111 from 0.1 miles south of Horseshoe Lake Road to the St. Clair County line. | — | Executed | Christ Bros. Asphalt, Inc. $4,645,357 · | ||
| Sep 17, 2021 | 76P68 | MadisonDistrict 8 | Bridge painting on I-255 over I-55/70 (SN 060-0206 and 060-0207). | — | Executed | Venus Painting Co. $779,600 · | ||
| Sep 17, 2021 | 76P76 | MadisonDistrict 8 | Pavement marking in various locations of Madison County. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $666,667 · | ||
| Sep 17, 2021 | 97758 | MadisonDistrict 8 | Replace the bridge carrying Albers Lane over Rocky Branch Creek in Bethalto. | — | Executed | Stutz Excavating, Inc. $1,316,433 · | ||
| Sep 17, 2021 | 97760 | MadisonDistrict 8 | Pavement reconstruction, new sidewalks and drainage improvements on North Prairie Street from Corbin Street to Dorothy Street in Bethalto. | — | Executed | Baxmeyer Construction, Inc. $1,375,777 · | ||
| Sep 17, 2021 | 97762 | MadisonDistrict 8 | Construction of a shared-use path along IL 157 from Lewis Road to the Goshen Trail Pedestrian Tunnel under IL 157 in Edwardsville. | — | Executed | Baxmeyer Construction, Inc. $837,008 · | ||
| Sep 17, 2021 | 97764 | MadisonDistrict 8 | Resurfcing Johnson Road from Terrace Lane to Wabsh Avenue in Granite City. | — | Executed | RCS Construction, Inc. $769,306 · | ||
| Nov 5, 2021 | 76P84 | MadisonDistrict 8 | 3.8 miles of pavement patching along IL 111 / IL 3 / US 67 from Montclaire Avenue to Homer Adams Parkway, then to Alby Street. | — | Executed | Christ Bros. Asphalt, Inc. $341,876 · | ||
| Jan 21, 2022 | 76P18 | MadisonDistrict 8 | 7.9 miles of crack and joint sealing on IL 157 from IL 140 to IL 143. | — | Executed | Complete Asphalt Service Co. $89,983 · | ||
| Jan 21, 2022 | 76P39 | MadisonDistrict 8 | 4.6 miles of overlay on IL 111 / IL 140 from Annex Street to 0.1 miles west of IL 11 in Bethalto. | — | Executed | Charles E. Mahoney Co. $4,213,069 · | ||
| Jan 21, 2022 | 97708 | MadisonDistrict 8 | Construction of a rounabout intersection at Keebler Road and IL 162 in Maryville. | — | Rejected | Baxmeyer Construction, Inc. $2,238,118 · | ||
| Jan 21, 2022 | 97768 | MadisonDistrict 8 | Resurfacing Brown Street from Main Street to Worden Avenue in Alton. | — | Executed | Charles E. Mahoney Co. $731,061 · | ||
| Mar 11, 2022 | 76P23 | MadisonDistrict 8 | 1.6 miles of resurfacing on IL 143 from US 40 to the Bond County line. | — | Executed | The Kilian Corporation $590,157 · | ||
| Apr 29, 2022 | 76P24 | MadisonDistrict 8 | 3.9 miles of milling, resurfacing, ADA upgrades and guardrail upgrades on IL 143 / IL 160 / US 40 in Highland. | — | Executed | Christ Bros. Asphalt, Inc. $1,746,801 · | ||
| Apr 29, 2022 | 76P86 | MadisonDistrict 8 | Pavement patching on IL 4 from I-55 to Blue Spruce Lane. | — | Executed | The Kilian Corporation $738,089 · | ||
| Apr 29, 2022 | 76P92 | MadisonDistrict 8 | Patching turn lanes on IL 3 (Lewis-Clark Boulevard) at St. Louis Avenue in East Alton. | — | Executed | RCS Construction, Inc. $90,961 · | ||
| Apr 29, 2022 | 97774 | MadisonDistrict 8 | Sidewalk removal, PCC sidewalks, curb and gutter, retaining wall, and pavement markings at various locations in Alton. | — | Executed | RCS Construction, Inc. $442,744 · | ||
| Jun 17, 2022 | 76P71 | MadisonDistrict 8 | Bridge painting on I-255 over IL 162 (SN 060-0220 and SN 060-0221), IL 157 over Burdick Branch Creek (SN 060-0088), and Main Street / Glen Carbon Road over I-270 (SN 060-0184). | — | Executed | Venus Painting Co. $1,152,000 · | ||
| Jun 17, 2022 | 76P94 | MadisonSt. ClairDistrict 8 | Traffic signal modernization on IL 157 at Lazercheff Drive in Cahokia, on IL 157 at Kenneth Street / Paris Avenue in Cahokia, on IL 3 at IL 143 in Wood River, on IL 3 / IL 111 at IL 140 in Alton, and on IL 3 / IL 111 at Bloomer Drive in Alton. | — | Executed | Electrico, Inc. $697,430 · | ||
| Jun 17, 2022 | 97761 | MadisonDistrict 8 | Resurface Keebler Road from 0.1 mile south of IL 162 to Lorry Lane in Maryville . | — | Executed | The Kilian Corporation $918,670 · | ||
| Jun 17, 2022 | 97763 | MadisonDistrict 8 | Reconstruct First Street from C Street to E Street in America's Central Port District. | — | Executed | Hank's Excavating & Landscaping, Inc. $3,291,630 · | ||
| Jun 17, 2022 | 97777 | MadisonDistrict 8 | Traffic signal improvments along Troy Road from Monclaire Avenue to Illini Drive in Glen Carbon and Edwardsville. | — | Executed | Electrico, Inc. $705,276 · | ||
| Aug 5, 2022 | 76P12 | MadisonDistrict 8 | Bridge painting on I-255 southbound Ramp 1 and Roadway B, just north of I-55/70 (SN 060-0253 and SN 060-0214). | — | Executed | Thomas Industrial Coatings, Inc. $634,809 · | ||
| Aug 5, 2022 | 76P66 | MadisonDistrict 8 | Installation of dynamic message signs on I-270 at the Chain of Rocks Canal Bridge and on IL 255 north of I-270. | — | Executed | Wissehr Electric, Inc. $1,247,940 · | ||
| Aug 5, 2022 | 97786 | MadisonDistrict 8 | 6.35 miles of bituminous pavement surface removal and Hot-Mix asphalt pavement and shoulder resurfacting on Renken Road from Washington Street in Prairietown to the Macoupin County line. | — | Executed | The Kilian Corporation $2,334,698 · | ||
| Sep 23, 2022 | 76L72 | MadisonDistrict 8 | 3 miles of resurfacing and ADA improvements on US 67 / IL 111 from 0.1 miles north of Airport Road to IL 3 in Godfrey. | — | Executed | Charles E. Mahoney Co. $5,485,505 · | ||
| Sep 23, 2022 | 76R79 | JerseyMadisonDistrict 8 | Guardrail replacement at various locations throughout Madison and Jersey Counties. | — | Executed | Lovewell Fencing, Inc. $3,153,333 · | ||
| Nov 18, 2022 | 76M79 | MadisonDistrict 8 | 6.87 miles of standard overlay resurfacing, ADA improvements, patching, guardrail improvements and detector loop replacement on US 40 / IL 143 in Highland. | — | Executed | The Kilian Corporation $5,494,168 · | ||
| Nov 18, 2022 | 97792 | MadisonDistrict 8 | .52 miles of pavement patching, HMA removal and resurfacing, drainage repairs, and ADA curb ramps on State Street from Rozier Street to Logan Street in Alton. | — | Executed | Charles E. Mahoney Co. $672,894 · | ||
| Jan 20, 2023 | 76M87 | MadisonDistrict 8 | 5.7 miles of resurfacing and ADA upgrades on IL 159 / Troy Road from Center Grove Road to West Country Lane. | — | Executed | Christ Bros. Asphalt, Inc. $12,374,453 · | ||
| Jan 20, 2023 | 76P70 | MadisonDistrict 8 | Painting of SN 060-0185 carrying Meridian Road over I-270 in Glen Carbon. | — | Executed | Venus Painting Co. $490,150 · | ||
| Jan 20, 2023 | 76P99 | MadisonSt. ClairDistrict 8 | Chemical treatment of deep wells at various locations in East St. Louis and Venice. | — | Rejected | Layne Christensen Company $792,818 · | ||
| Jan 20, 2023 | 76R68 | MadisonDistrict 8 | Pavement patching on the ramps at I-255 and I-55/70 interchange. | — | Executed | Keeley & Sons, Inc. $396,963 · | ||
| Jan 20, 2023 | 76R70 | MadisonDistrict 8 | Partial and full depth patching on IL 160 from John Street in Grantfork to US 4. | — | Executed | Christ Bros. Asphalt, Inc. $544,881 · | ||
| Jan 20, 2023 | 76R71 | MadisonDistrict 8 | Partial and full depth patching on IL 3 from McKinley Bridge to New Poag Road. | — | Executed | Kinney Contractors, Inc. $516,396 · | ||
| Jan 20, 2023 | 97785 | MadisonDistrict 8 | Reconstruct North Buchanan Street from East Union Street to Hillsboro Avenue in Edwaardsville. | — | Executed | Stutz Excavating, Inc. $1,291,558 · | ||
| Jan 20, 2023 | 97787 | MadisonDistrict 8 | Reconstruction of clay Street from North Main Street to North Dewey Street in Troy. | — | Rejected | Baxmeyer Construction, Inc. $1,536,288 · | ||
| Mar 10, 2023 | 76N83 | MadisonDistrict 8 | 0.59 miles of standard overlay and ADA improvements on IL 140 from Monument Avenue to Terra Drive in Alton. | — | Executed | Charles E. Mahoney Co. $1,689,154 · | ||
| Mar 10, 2023 | 76R81 | MadisonDistrict 8 | Bridge painting on SN 060-0210 carrying IL 4 over US 40 and a railroad, approximately 1.5 miles west of St. Jacob. | — | Executed | Civil Coatings and Construction Inc. $631,797 · | ||
| Mar 10, 2023 | 76R87 | MadisonSt. ClairDistrict 8 | Dynamic message sign replacement at various locations in Madison and St. Clair Counties. | — | Rejected | Wissehr Electric, Inc. $587,933 · | ||
| Apr 28, 2023 | 76M82 | MadisonDistrict 8 | 1.7 miles of resurfacing and ADA improvements on IL 111 from 0.1 miles south of Pontoon Road to 0.1 miles south of Horseshoe Lake Road. | — | Executed | The Kilian Corporation $3,603,769 · | ||
| Apr 28, 2023 | 76M83 | MadisonDistrict 8 | 4.6 miles of resurfacing, ADA improvements and intersection improvements on IL 157 from St. Louis Street to South University Drive in Edwardsville. | — | Executed | Christ Bros. Asphalt, Inc. $8,186,958 · | ||
| Apr 28, 2023 | 76R63 | MadisonDistrict 8 | Bridge joint repair and replacement on SN 060-0077 carrying US 40 over Silver Creek, 1.6 miles west of IL 4. | — | Executed | Keeley & Sons, Inc. $1,048,120 · | ||
| Apr 28, 2023 | 76R90 | MadisonDistrict 8 | 19.6 miles of intermittent pavement patching on I-55 and its connecting ramps from I-270 to the Macoupin County line. | — | Executed | Keeley & Sons, Inc. $589,483 · | ||
| Jun 16, 2023 | 76R40 | MadisonDistrict 8 | 10 miles of resurfacing on IL 255 from IL 143 to 0.1 miles north of Seminary Road. | — | Executed | The Kilian Corporation $15,205,837 · | ||
| Jun 16, 2023 | 76R69 | MadisonDistrict 8 | Patching on the I-270 eastbound collector distributor at the I-270 and I-255 interchange. | — | Executed | The Kilian Corporation $201,360 · | ||
| Jun 16, 2023 | 97713 | MadisonDistrict 8 | Replace existing structure with a single span steel beam structure with poured concrete deck, aggregate approaches and guardrail on Silver Creek Road over a branch of Silver Creek. | — | Executed | Keller Construction, Inc. $1,097,790 · | ||
| Jun 16, 2023 | 97801 | MadisonDistrict 8 | Construction of a Shared-Use Path along Rock Springs Drive from Memorial Drive to Brown Street, and along College Avenue at the intersection of Rock Springs Drive in Alton. | — | Executed | Stutz Excavating, Inc. $642,226 · | ||
| Jun 16, 2023 | 97806 | MadisonDistrict 8 | HMA resurfacing, curb and gutter, driveways, storm sewers, and pavement markings on University Drive from IL 157 to Devon Court in Edwardsville. | — | Executed | Stutz Excavating, Inc. $842,773 · | ||
| Aug 4, 2023 | 76P67 | MadisonSt. ClairDistrict 8 | Installation of 2 dynamic message signs on butterfly trusses and fiber optic on northbound I-255 at mile marker 7.6 and southbound I-255 at mile marker 27.1. | — | Executed | Keeley & Sons, Inc. and Wissehr Electric, Inc. JV $3,386,988 · | ||
| Aug 4, 2023 | 76R27 | MadisonDistrict 8 | Lighting upgrades on I-55 at IL 140. | — | Executed | Gerstner Electric, Inc. $577,727 · | ||
| Aug 4, 2023 | 76R47 | MadisonDistrict 8 | Median removal and replacement on US 67 (Landmark Boulevard), near the intersection of Broadway Street, in Alton. | — | Executed | Stutz Excavating, Inc. $143,115 · | ||
| Aug 4, 2023 | 76T09 | MadisonDistrict 8 | 9.6 miles of patching and resurfacing on IL 4 from 0.37 miles south of I-55 to IL 143. | — | Executed | Christ Bros. Asphalt, Inc. $4,788,328 · | ||
| Aug 4, 2023 | 97811 | MadisonDistrict 8 | Construction of a Shared-Use Path along Erwin Plegge Boulevard, from Old Bethalto Road to Ashbrook Street in Bethalto. | — | Executed | Baxmeyer Construction, Inc. $907,108 · | ||
| Sep 22, 2023 | 76R57 | MadisonSt. ClairDistrict 8 | Well treatment at various locations in East St. Louis and Venice. | — | Executed | Layne Christensen Company $856,535 · | ||
| Nov 17, 2023 | 46629 | MadisonSt. ClairDistrict 8 | Installation of new ground-mounted signs on various routes in Madison and St. Clair Counties. | — | Executed | Kujo, Inc. $358,351 · | ||
| Nov 17, 2023 | 76N16 | MadisonDistrict 8 | Bridge repairs, flood wall work and pavement reconstruction on IL 11 over Cahokia Diversion Channel (SN 060-0121), 3 miles north of I-270. | — | Executed | The Kilian Corporation $1,832,257 · | ||
| Nov 17, 2023 | 76N43 | MadisonDistrict 8 | Intersection reconstruction and ADA upgrades on IL 3 at 20th Street in Granite City. | — | Executed | Baxmeyer Construction, Inc. $7,285,268 · | ||
| Nov 17, 2023 | 97790 | MadisonDistrict 8 | Reconstruction of Lebanon Road on new alignment to facilitate closure of two underpass structures. Work includes structure removal, construction of a 6-span steel plate girder bridge, construction of a 1-span PC slabl bridge, box culverts, pavement removal, building removal, processing lime modified soil, PPC Pavement, HMA Pavement, HMA shoulders, combination curb and gutter, and storm sewer. Located 0.19 miles east of Clay School Road to 0.16 miles of Locmann Road over the CSX Railroad. | — | Executed | Keller Construction, Inc. $17,444,384 · | ||
| Nov 17, 2023 | 97793 | MadisonDistrict 8 | Reconstruction of the IL 159 and Glen Carbon Road intersection to establish north bound and east bound right turn lanes. Includes, HMA resurfacing, sidewalks, ADA ramps, traffic signal modifications, and drainage improvements. Located in Glen Carbon. | — | Rejected | Keller Construction, Inc. $1,439,471 · | ||
| Nov 17, 2023 | 97822 | MadisonDistrict 8 | Resurfacing West Airline Drive from Main Street to 9th Street in East Alton. | — | Executed | Charles E. Mahoney Co. $858,985 · | ||
| Jan 19, 2024 | 76F88 | MadisonDistrict 8 | Superstructure replacement on the north Southern Illinois University - Edwardsville entrance road over the Norfolk Southern Railroad (SN 060-0142 and SN 060-0143). | — | Rejected | Keller Construction, Inc. $4,559,532 · | ||
| Jan 19, 2024 | 76H49 | MadisonDistrict 8 | Replacement of SN 060-0347 carrying IL 111 southbound over Cahokia Canal, 0.24 miles north of I-55/70. Project also includes maintenance of the northbound structure, SN 060-0244. | — | Active | Plocher Construction Company, Inc. $8,868,716 · | ||
| Jan 19, 2024 | 76L82 | MadisonDistrict 8 | Bridge deck sealing on SN 060-0345 carrying I-270 over Chain of Rocks Canal. | — | Executed | All States Painting, Inc. $64,882 · | ||
| Jan 19, 2024 | 76R91 | MadisonDistrict 8 | New platform scales and patching at the Maryville Weight Station on westbound I-55 / I-70 approximately 1 mile west of Maryville. | — | Executed | Stutz Excavating, Inc. $739,349 · | ||
| Jan 19, 2024 | 97769 | MadisonDistrict 8 | HMA resurfacing with concrete curb and gutter, storm sewers, and signage on Sugar Loaf Road from west of Hone Lane to IL 157 in Collinsville. | — | Executed | DMS Contracting, Inc. $778,107 · | ||
| Jan 19, 2024 | 97824 | MadisonDistrict 8 | Resurfacing Johnson Road from Wabash Avenue to Edgewood Avenue in Granite City. | — | Executed | Hank's Excavating & Landscaping, Inc. $938,631 · | ||
| Jan 19, 2024 | 97826 | MadisonDistrict 8 | HMA resurfacing with sidewalks, driveways, curb and gutter on Keebler Road from Sher Nan Drive to West Main Street in Maryville | — | Rejected | Stutz Excavating, Inc. $829,420 · | ||
| Mar 8, 2024 | 76R84 | MadisonSt. ClairDistrict 8 | Traffic signal modernization at various intersections in District 8. (IL 3 / IL 111 at Godfrey Road; IL 203 at Madison Avenue / High Street; IL 203 at Ohio Avenue) | — | Executed | Electrico, Inc. $546,454 · | ||
| Mar 8, 2024 | 76T19 | MadisonDistrict 8 | Patching on IL 203 from Eagle Creek Road to the St. Clair County line. | — | Executed | G. M. Sipes Construction, Inc. $214,416 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.