33-1RS-3

Let date
Friday, April 29, 2022
Contract
76P24 · job page
District
District 8
County
Madison
Highway
Limits
3.9 miles of milling, resurfacing, ADA upgrades and guardrail upgrades on IL 143 / IL 160 / US 40 in Highland.

Bidders 2

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Christ Bros. Asphalt, Inc. Low bidder $1,746,801
2 The Kilian Corporation $1,771,875 +1.4%

Bid tab: unit prices 59 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Christ Bros. As…#2 The Kilian Corp…
1X0327008 REM/REL SIGN SPECIAL18EACH $74.00 $78.00
2X6320100 GUARDRAIL REMOV SPL752FOOT $7.65 $8.00
3Z0034105 MATL TRANSFER DEVICE5,770TON $3.72 $5.00
4Z0070100 SURV MONUMENT COV ASY1EACH $1,000.00 $150.00
5Z0076600 TRAINEES500HOUR $0.8000 $0.8000
6Z0076604 TRAINEES TPG500HOUR $15.00 $15.00
728100701 STONE DUMP RIP CL A1133SQ YD $166.57 $40.00
831101200 SUB GRAN MAT B 4275SQ YD $15.97 $18.50
940200800 AGG SURF CSE B12TON $75.00 $125.00
1040600290 BIT MATLS TACK CT37,091POUND $1.53 $1.35
1140600370 LONG JOINT SEALANT24,510FOOT $2.07 $2.55
1240600990 TEMPORARY RAMP1,012SQ YD $0.0100 $0.0100
1340604062 HMA SC IL-9.5 D N705,770TON $110.67 $118.00
1440800029 BIT MATLS TACK CT569POUND $3.36 $1.30
1540800050 INCIDENTAL HMA SURF94TON $285.66 $257.00
1642400100 PC CONC SIDEWALK 42,515SQ FT $12.30 $16.50
1742400800 DETECTABLE WARNINGS354SQ FT $48.00 $46.00
1844000155 HMA SURF REM 1 1/283,315SQ YD $2.72 $2.95
1944000500 COMB CURB GUTTER REM271FOOT $18.31 $20.00
2044000600 SIDEWALK REM2,869SQ FT $4.10 $3.65
2144200144 PAVT PATCH T2 1243SQ YD $286.80 $336.00
2244200148 PAVT PATCH T3 1270SQ YD $286.80 $289.00
2344213200 SAW CUTS523FOOT $3.56 $10.00
2448102100 AGG WEDGE SHLD TYPE B668TON $24.85 $44.00
2548203100 HMA SHOULDERS1,027TON $123.67 $122.00
2660605100 COMB CC&G TB6.24 AEP271FOOT $46.42 $78.00
2763000001 SPBGR TY A 6FT POSTS300FOOT $33.80 $35.50
2863000003 SPBGR TY A 9FT POSTS662.5FOOT $38.75 $40.75
2963100167 TR BAR TRM T1 SPL TAN4EACH $3,305.00 $3,465.00
3063200310 GUARDRAIL REMOV389FOOT $6.00 $6.25
3167000400 ENGR FIELD OFFICE A4CAL MO $2,000.00 $2,100.00
3267100100 MOBILIZATION1L SUM $154,469.00 $112,000.00
3370100450 TRAF CONT-PROT 7012011L SUM $0.0100 $1,625.00
3470100460 TRAF CONT-PROT 7013061L SUM $49,866.00 $37,500.00
3570100600 TRAF CONT-PROT 7013361L SUM $6,460.00 $0.0100
3670102620 TR CONT & PROT 7015011L SUM $35,843.00 $19,300.00
3770102622 TR CONT & PROT 7015021L SUM $0.0100 $8,150.00
3870102635 TR CONT & PROT 7017011L SUM $2,500.00 $0.0100
3970102640 TR CONT & PROT 7018011L SUM $18,510.00 $2,100.00
4070107025 CHANGEABLE MESSAGE SN84CAL DA $79.70 $80.00
4170300100 SHORT TERM PAVT MKING3,968FOOT $1.39 $3.00
4270300150 SHRT TRM PAVT MK REM661SQ FT $0.0100 $10.00
4370300211 TEMP PVT MK LTR & SYM PAINT282SQ FT $0.0100 $0.0100
4470300221 TEMP PVT MK LINE 4 - PAINT72,876FOOT $0.0100 $0.0100
4570300261 TEMP PVT MK LINE 12 - PAINT982FOOT $0.0100 $0.0100
4670300281 TEMP PVT MK LINE 24 - PAINT406FOOT $0.0100 $0.0100
4772501000 TERMINAL MARKER - DA4EACH $25.00 $26.00
4872800100 TELES STL SIN SUPPORT131FOOT $22.00 $23.00
4973100100 BASE TEL STL SIN SUPP13EACH $290.00 $305.00
5073700100 REM GR MT SIN SUPPORT13EACH $100.00 $165.00
5178000100 THPL PVT MK LTR & SYM282SQ FT $13.25 $13.75
5278000200 THPL PVT MK LINE 472,876FOOT $0.5800 $0.6100
5378000600 THPL PVT MK LINE 12982FOOT $8.50 $8.90
5478000650 THPL PVT MK LINE 24406FOOT $15.75 $16.50
5578100100 RAISED REFL PAVT MKR272EACH $34.00 $39.00
5678200005 GRDRAIL REF TYPE A8EACH $9.00 $9.50
5778300200 RAISED REF PVT MK REM272EACH $0.0100 $0.0100
5878300202 PAVMT MRKG REM WTR BL25,759SQ FT $0.0100 $0.0100
5988600600 DET LOOP REPL875FOOT $8.00 $10.50