Filtered by: County: Lake Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 15, 2021 | 62M07 | LakeDistrict 1 | (4.176-Mile) Resurfacing (SMART Overlay), ADA Improvements; Location: FAU 2711: IL 131 from North of ILL 120 to CN (fmr EJandE) Railroad in the Cities of Waukegan and North Chicago in Lake County. | — | Executed | Peter Baker & Son Co. $3,117,568 · | ||
| Jan 15, 2021 | 62M39 | LakeDistrict 1 | A bridge deck overlay and joint repair located in the Village of Libertyville The improvement of IL 176 (Park Avenue) over Des Plaines River consists of a bridge deck overlay and joint repair located in the Village of Libertyville. | — | Executed | Martam Construction Incorporated $484,734 · | ||
| Jan 15, 2021 | 62M91 | LakeMcHenryDistrict 1 | Cleaning and painting existing steel structures at 5 locations. 1st location, US 12 over Pistakee Lake (SN 049-0019). 2nd location, IL 43 over IL 120 (SN 049-0111). 3rd location, Metra RR over Person Rd. (SN 049-0127). 4th location, US 12 over Nippersink Lake (SN 049-0167). 5th location, US 14 over UP RR and McComb St. (SN 056-0007). | — | Executed | ERA-Valdivia Contractors, Inc. $949,114 · | ||
| Mar 5, 2021 | 61G40 | LakeDistrict 1 | Reconstruction on North Krueger Road from Gilmer Road to IL 22 in Long Grove. | — | Executed | Peter Baker & Son Co. $1,045,471 · | ||
| Mar 5, 2021 | 62L56 | LakeDistrict 1 | (7.6-Mile) SMART overlay, patching and pedestrian ramps on IL 137 from south of Greenwood Avenue to north of Russell Road in the Villages of Beach Park, Winthrop Harbor and Cities of Waukegan and Zion. | — | Executed | J. A. Johnson Paving Company $4,258,746 · | ||
| Mar 5, 2021 | 62M70 | LakeDistrict 1 | This is a building demolition project for gas station. Work includes removing of all existing improvements: one-story building, canopy with gas pumps and storage tanks. Location: 491 South IL. Route 83, Village of Grayslake. | — | Executed | Lima Contractors $367,612 · | ||
| Apr 23, 2021 | 60T11 | LakeDistrict 1 | Intersection Reconstruction, Channelization, Traffic Signal Modernization, Location: FAP 344: US 45 (Lake Street) at IL 173 (Rosecrans Road) within unincorporated Antioch Township in Lake County. | — | Executed | Lake County Grading Company, LLC $3,097,393 · | ||
| Apr 23, 2021 | 60V39 | LakeDistrict 1 | This traffic signal installation and channelization project begins about 652.5 feet (0.12 miles) west of the intersection of IL 173 (FAP 303) and North Lake Avenue and proceeds in a southerly/easterly direction for 1462.3 feet (0.28 miles). This project also begins at the center of the intersection of IL 173 (FAP 303) and North Lake Avenue. | — | Executed | Dunnet Bay Construction Company $3,128,974 · | ||
| Jun 11, 2021 | 46572 | LakeWillDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width. | — | Executed | STF, LLC d/b/a Traffic Control Company $635,000 · | ||
| Jun 11, 2021 | 46573 | LakeDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings within the limits shown. | — | Executed | Superior Road Striping, Inc. $507,850 · | ||
| Jun 11, 2021 | 62L64 | LakeDistrict 1 | Smart Overlay improvement in the Village of Gurnee, Warren Township (1.91-Mile) Improvement of US 41 (Skokie Hwy) from IL 21 (Riverside Dr) to North of Dorchester Ave consists of Smart Overlay improvement in the Village of Gurnee, Warren Township. | — | Executed | Peter Baker & Son Co. $1,931,808 · | ||
| Jun 11, 2021 | 62N82 | LakeDistrict 1 | (1. 71-Mile) Standard Overlay, Designed Overlay, Patching, and ADA improvements Location: IL 60 (Townline Rd) from East of Des River to Riverwoods Rd, in the Village of Mettawa, in Lake County. | — | Executed | Peter Baker & Son Co. $1,805,903 · | ||
| Jul 30, 2021 | 60X57 | LakeDistrict 1 | (1,300-Ft) Intersection Improvement, culvert replacement and extension, new traffic signal installation, in the Village of Wauconda, Wauconda and Freemont Townships. | — | Executed | Peter Baker & Son Co. $1,158,508 · | ||
| Jul 30, 2021 | 62D86 | LakeDistrict 1 | The length of this improvement is 4711 feet (0.89 miles) the type of work is Bridge Replacement, Reconstruction, and Resurfacing in Lake County. | — | Executed | Lorig Construction Company $12,031,007 · | ||
| Sep 17, 2021 | 62D79 | CookLakeDistrict 1 | The project extends from Montrose Ave to Park Blvd. Improvements cover 13.5 miles along 1-94 and 2 miles along US 41. The scope includes fiber optic cable, CCTV and dynamic message signs in order to provide surveillance coverage of the highway. | — | Executed | Meade Inc. $11,996,355 · | ||
| Sep 17, 2021 | 62J90 | LakeDistrict 1 | (2.17-Mile) Designed Overlay, ADA Improvements; Location: FAU 3506: Sheridan Rd from St. Johns Ave to Lambert Tree Ave in the City of Highland Park in Lake County. | — | Executed | Builders Paving, LLC $1,448,000 · | ||
| Nov 5, 2021 | 61G85 | LakeDistrict 1 | Pavement reconstruction, resurfacing, curb and gutter replacement, sidewalk replacement, storm sewer, traffic signal improvements and pavement markings on Clavey Road, from 0.4 miles east of US 41 to Green Bay Road in Highland. | — | Rejected | Lake County Grading Company, LLC $9,399,399 · | ||
| Nov 5, 2021 | 61H28 | LakeDistrict 1 | Replace the bridge carrying Central Avenue over an unamed ravine, 0.1 mile west of Lake Michigan in Highland Park. | — | Executed | Dunnet Bay Construction Company $3,315,548 · | ||
| Nov 5, 2021 | 62J26 | LakeDistrict 1 | (2300-Ft) Rehabilitation of culverts located on US 41 over Unnamed Creeks (N of IL 173 to S of Westleigh Rd) in the Villages of Wardsworth, Gurnee and Lake Forest. (SN 049-0228, SN 049-2015, SN 049-2016, SN 049-0575) | — | Executed | Lorig Construction Company $2,777,744 · | ||
| Jan 21, 2022 | 62H06 | LakeDistrict 1 | (2.810-Mile) Standard Overlay and ADA improvements along Grand Ave. from IL-131 to IL-137 (Amstutz Expy.) in the City of Waukegan. | — | Executed | Peter Baker & Son Co. $4,160,958 · | ||
| Jan 21, 2022 | 62M92 | LakeDistrict 1 | (1.21-Mile) Roadway lighting improvement, located in Gurnee, Park City and Waukegan, IL on IL 120 from west of O'Plaine Rd. to US 41 {Skokie Hwy). Light tower and foundation removal. Install new light poles, foundations, LED luminaires, controllers, conduits and cables, excavations, and site restoration | — | Executed | H & H Electric Co. $2,259,898 · | ||
| Mar 11, 2022 | 61H45 | LakeDistrict 1 | Pavement reconstruction, curb and gutter, Sidewalk replacement, storm sewer, drainage structures and pavment marking on Brandywyn Lane from Deerfield Pkwy to Thompson Boulevard, and on Thompson Boulevard from Arlington Heights Road to Brandywyn Lane in Buffalo Grove. | — | Executed | A Lamp Concrete Contractors, Inc. $3,088,675 · | ||
| Mar 11, 2022 | 62H69 | LakeDistrict 1 | (1.86-Mile) Designed Overlay, ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK etc. IL 137 (Buckley Road) from West of Frontenac St to IL 137 (Bobby Thompson Expwy) in the City of North Chicago in Lake Co. | — | Executed | Peter Baker & Son Co. $3,849,712 · | ||
| Mar 11, 2022 | 62M45 | CookLakeDistrict 1 | (1.830-Mile) Designed Overlay improvement along Lake-Cook Road from Ela Road to Rue Touraine in the Villages of Deer Park and Lake Zurich. | — | Executed | Arrow Road Construction Co. $1,347,052 · | ||
| Mar 11, 2022 | 62M47 | CookLakeDistrict 1 | (2.60-Mile) Designed Overlay, ADA Improvements: HMA removal, pavement patching HMA resurfacing, curb ramps improvements, PMK. FAP 1270: Main Street from West of Hart Rd to Ela Rd in the Village of Barrington + Unincorp. areas in Cook and Lake Counties. | — | Executed | Arrow Road Construction Co. $2,917,919 · | ||
| Mar 11, 2022 | 62R35 | CookLakeDistrict 1 | (130.8-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-94 (Edens Expwy)/ US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy). | — | Executed | MYS, Incorporated $135,901 · | ||
| Apr 29, 2022 | 61H63 | LakeDistrict 1 | Resurfacing 27th Street from Galilee Avenue to Emmaus Avenue in Zion. | — | Executed | J. A. Johnson Paving Company $871,468 · | ||
| Apr 29, 2022 | 61H66 | LakeDistrict 1 | Construction of a pedestrian path along Hart road from Field of Dreams to Lake Cook Road, and along Lake Cook Road from Hart Road to the high school entrance, in Barrington. | — | Executed | Lorig Construction Company $695,851 · | ||
| Apr 29, 2022 | 62L68 | LakeDistrict 1 | (3.42-Mile) Design overlay project on IL Route 137 from Buckley Road to Belvidere Road that includes ADA curb ramp improvements located in City of Waukegan and City of North Chicago in Lake County. | — | Executed | Peter Baker & Son Co. $5,588,006 · | ||
| Apr 29, 2022 | 62M58 | LakeDistrict 1 | (1000-Ft) Bridge joint repairs, bridge deck overlay, guardrail, and asphalt shoulder reconstruction for the structures that carry US 41 over Mill Creek located in the Village of Wadsworth in Lake County. | — | Executed | Lorig Construction Company $1,225,496 · | ||
| Apr 29, 2022 | 62N07 | CookDuPageLakeDistrict 1 | This is a drainage improvement on various State maintained routes within the Cities of Elmhurst and Waukegan and the Villages of Glendale Heights, Lemont, and Mount Prospect in Cook, DuPage and Lake Counties. The routes are Kensington Road, IL 137, I-290, IL 64, and McCarthy Road / 123rd Street. | — | Executed | Martam Construction Incorporated $1,608,899 · | ||
| Apr 29, 2022 | 62N23 | LakeDistrict 1 | (2535-Ft) Land bridge deck overlay and repairs to the structures at Fish Creek. Scope of work includes abandoning structure, grouting, concrete bridge deck overlays, and shoulder reconstruction located in the Village of Volo. | — | Executed | Lorig Construction Company $2,831,222 · | ||
| Apr 29, 2022 | 62N65 | LakeDistrict 1 | (1.86-Mile) SMART overlay along IL 83 from Winchester Rd to IL 176/Maple St. This project is in the Village of Mundelein in Lake County. | — | Executed | Peter Baker & Son Co. $1,021,974 · | ||
| Apr 29, 2022 | 62N70 | LakeDistrict 1 | Smart overlay resurfacing on IL 173 (Rosecrans Road) Approximately 2000 feet east of 1-94 and extends in an easterly direction approximately 20,062 feet (3.80 miles) to approximately 130 feet west of IL 131 located in the Villages of Wadsworth and Zion. | — | Executed | J. A. Johnson Paving Company $1,798,173 · | ||
| Apr 29, 2022 | 62P47 | CookLakeMcHenryDistrict 1 | Designed overlay resurfacing on County-Line Rd., beginning at E. of Haegers Bend Rd. and continuing in the easterly direction for approximately 23483 feet (4.44 miles) to 300 ft west of Hart Rd. located in the Village of Barrington Hills. | — | Executed | Plote Construction, Inc. $2,590,116 · | ||
| Apr 29, 2022 | 62R47 | LakeDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout Lake County (422.6-Mile) Improvement consists of cleaning(sweeping) various arterial highways in District One throughout Lake County. | — | Executed | Elgin Sweeping Services, Inc. $1,593,840 · | ||
| Jun 17, 2022 | 61H79 | LakeDistrict 1 | Resurface Barclay Boulevard from Aptaksic Road to Half Day Road in Lincolnshire . | — | Executed | Peter Baker & Son Co. $1,206,851 · | ||
| Jun 17, 2022 | 62P14 | LakeDistrict 1 | (2,344-Ft) Removal and construction of bridge deck, approach slab and pavement connector for bridge carrying over UPRR and bridge deck scarification and overlay for the bridge carrying over US 41 in the City of Park City and Village of Gurnee, Lake County. | — | Executed | Lorig Construction Company $3,650,806 · | ||
| Jun 17, 2022 | 62P33 | LakeDistrict 1 | (1.02-Mile) Designed Overlay, ADA Improvements: HMA removal and resurfacing, Class D patching, ADA curb ramps improvements, PMK. FAP 330: IL 21 (Milwaukee Ave) from Church Street to South of Finstad Drive in the Village of Libertyville. | — | Executed | Peter Baker & Son Co. $2,379,343 · | ||
| Aug 5, 2022 | 62N66 | LakeDistrict 1 | (3,294-Ft) Smart Overlay and ADA improvements located in Village of Buffalo Grove | — | Executed | Builders Paving, LLC $1,250,000 · | ||
| Aug 5, 2022 | 62P04 | LakeDistrict 1 | (410-Ft) Wingwall replacement and culvert repairs for the culvert carrying Peterson Road over Ditch (0.4 Miles East of US 45) located in the Village of Libertyville in Lake County. | — | Executed | Alliance Contractors, Inc. $219,788 · | ||
| Sep 23, 2022 | 61H92 | LakeDistrict 1 | Resurfacing Wildspring Road from IL 120 to Townline Road, and resurfacing Amarias Drive from Townline Road to Cedar Lake Road in Round Lake. | — | Executed | Peter Baker & Son Co. $1,477,000 · | ||
| Sep 23, 2022 | 62N05 | CookLakeDistrict 1 | (66.6-Mile), 1-94 from Lake Cook Rd to Lincoln Ave, Lighting replacement, new light poles, LED luminaires, foundations, lighting controllers, conduit and cables, restorations. Located in City of Highland Park and Villages of and Morton Grove, Northbrook, Northfield, Skokie, and Wilmette. | — | Executed | Meade Inc. $7,139,420 · | ||
| Nov 18, 2022 | 61H33 | LakeDistrict 1 | Replace the bridge carrying Park Avenue West over a Ditch of the Skokie River in Highland Park. | — | Executed | Dunnet Bay Construction Company $5,067,778 · | ||
| Nov 18, 2022 | 61J05 | LakeDistrict 1 | Resurfacing Telegraph Road from the north village limits to North Avenue, and placement of a bike path/sidewalk south of IL 22 in Bannockburn. | — | Rejected | Builders Paving, LLC $1,542,000 · | ||
| Nov 18, 2022 | 62N67 | LakeDistrict 1 | (2.62-Mile); Smart Overlay and ADA Improvements on IL 83 from S of Hook Drive to Lake Avenue, located in the Villages of Round Lake Beach and Lake Villa in Lake County. | — | Executed | Peter Baker & Son Co. $2,095,749 · | ||
| Jan 20, 2023 | 62A53 | LakeDistrict 1 | Dry Land Bridge reconstruction, roadway widening, resurfacing and ADA improvement for IL 132 (Grand Avenue) at (2,811-Ft) The proposed improvement consists of Dry Land Bridge reconstruction, roadway widening, resurfacing and ADA improvement for IL 132 (Grand Avenue) at East of Cedar Lake Road located in the Village of Lake Villa in Lake County. | — | Executed | Dunnet Bay Construction Company $8,715,212 · | ||
| Jan 20, 2023 | 62G26 | LakeDistrict 1 | (5.35-Mile) Design, Standard and Smart overlay resurfacing on IL Rte. 173 (Rosecrans Rd.) from Brown Ave. to Hunt Club Rd. in the Village of Antioch, Lake County. | — | Executed | Payne & Dolan, Inc. $3,296,603 · | ||
| Jan 20, 2023 | 62N69 | LakeDistrict 1 | (5.59-Mile) Smart overlay and ADA improvements, on IL 120 (0.2 Mile East of IL 60 0.1 Mile East of Alleghany Road) in the villages of Volo, Round Lake, Round Lake Park, Hainseville, Grayslake, and Mundelein in the townships of Avon, Grant, Wauconda, and Freemont in Lake County. | — | Executed | Peter Baker & Son Co. $2,492,285 · | ||
| Mar 10, 2023 | 61J06 | LakeDistrict 1 | HMA Resurfacing, PCC sidewalk with ADA improvements, patching, drainage improvements, and pavement markings along Deer Park Boulevard in Deer Park. | — | Executed | Geske and Sons, Inc. $576,911 · | ||
| Mar 10, 2023 | 61J15 | LakeDistrict 1 | HMA resurfacing and widening at the Lakeview Parkway and Hawthorn Parkway intersection and at the Lakeview Parkway and IL 60 intersection. Includes PCC path, ADA ramps, storm sewers, traffic signals and lighting modifications in Vernon Hills. | — | Executed | Alliance Contractors, Inc. $6,074,312 · | ||
| Mar 10, 2023 | 62M65 | CookLakeDistrict 1 | Location 1: (9,353-Ft) Designed overlay improvement on Barrington Rd in the villages of Inverness, Barrington, South Barrington and Barrington Hills in Cook County. Location 2: (366-Ft) Drainage improvement on Lake Cook Rd in the village of Deer Park. | — | Executed | Plote Construction, Inc. $1,750,124 · | ||
| Mar 10, 2023 | 62U66 | CookLakeDistrict 1 | Debris and litter cleaning along I-94/US-41 (Edens Expressway) from I-90 (Kennedy Expressway) to Clavey Road This contract consists of debris and litter cleaning along I-94/US-41 (Edens Expressway) from I-90 (Kennedy Expressway) to Clavey Road. | — | Executed | MYS, Incorporated $179,983 · | ||
| Apr 28, 2023 | 60N11 | LakeDistrict 1 | (1.86-Mile) Roadway reconstruction and realignment; building removal and site clearing; installation of a new traffic signal; drainage improvement; cul-de- sac both north and south legs of Ivanhoe Road (existing IL 83); new signage and pavement markings; and aesthetic landscaping to IL 83 from IL 120 to IL 137 and at Atkinson Road, located in Lake County, IL. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $15,926,091 · | ||
| Apr 28, 2023 | 62T98 | LakeDistrict 1 | Partial removal and replacement of culvert located on IL 60 at the Ditch (West of Peterson Road) in the Villag (172.9-Ft) The proposed improvement consists of partial removal and replacement of culvert located on IL 60 at the Ditch (West of Peterson Road) in the Village of Round Lake, Lake County. | — | Executed | Alliance Contractors, Inc. $378,118 · | ||
| Jun 16, 2023 | 46621 | LakeWillDistrict 1 | Application of water borne, lead free, white and yellow paint pavement marking lines of 4, 6 and 8 inches at various locations. The work will be on various State-maintained highways in Lake and Will Counties. | — | Executed | Precision Pavement Markings Inc. $1,816,500 · | ||
| Jun 16, 2023 | 46626 | LakeDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. The work to be completed in various routes throughout Lake County. | — | Executed | Superior Road Striping, Inc. $1,279,775 · | ||
| Jun 16, 2023 | 62J41 | LakeDistrict 1 | Replacing the existing 8-x10- double box culvert (SN 049-0214) and replacing it with a 12'x12' triple box culv This project consists of replacing the existing 8-x10- double box culvert (SN 049-0214) and replacing it with a 12'x12' triple box culvert (SN 049-0700). Also included is the construction of a 7' PCC sidewalk on the east side and an 8' multi-use path on the west side of IL 137. In addition, light pole relocation, guardrail replacement, and watermain, sanitary sewer relocation and embankment stabilization. | — | Executed | Campanella and Sons, Inc. $7,886,157 · | ||
| Jun 16, 2023 | 62K05 | LakeDistrict 1 | The demolition of 3 (three) single family residences, 1 (one) shed, and culvert repair at various locations on This improvement consists of the demolition of 3 (three) single family residences, 1 (one) shed, and culvert repair at various locations on IL 22 between Quentin Rd and West of IL 83 in the Villages of Long Grove and Kildeer in Lake County, IL. | — | Executed | Martam Construction Incorporated $345,708 · | ||
| Jun 16, 2023 | 62U17 | LakeDistrict 1 | Bridge painting of the structures at IL 137 over 24th St (049-0163) in North Chicago, IL 137 over Washington S This improvement consists of bridge painting of the structures at IL 137 over 24th St (049-0163) in North Chicago, IL 137 over Washington St (049-0164) in Waukegan, and US 41 over Mill Creek (049-0028) in Wadsworth in Lake County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $598,044 · | ||
| Aug 4, 2023 | 61J64 | LakeDistrict 1 | HMA Resurfacing with Curb and Gutter, Sidewalk Repair, Drainage Adjustments, and Parkway Restoration algon Glen Flora Avenue from McAree Road to Lewis Avenue, and on Sheridan Road from Greenwood Avenue to Flora Avenue in Waukegan. | — | Executed | Peter Baker & Son Co. $1,253,279 · | ||
| Aug 4, 2023 | 62R18 | LakeDistrict 1 | (3,068-Ft) Intersection improvement with traffic signal modernization, dual left-turn lanes, pedestrian signals, drainage System, ADA improvements at the intersection IL 120 at O'Plaine Road in the City of Waukegan and Village of Gurnee, Lake County. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $4,281,204 · | ||
| Aug 4, 2023 | 62T81 | LakeDistrict 1 | (2.17-Mile) Crack and Joint Sealing project is located on IL. 137, (Greenwood Ave.) It Begins at Genesse St and proceeds NE to Joe Favero Dr through the City of Waukegan, Lake County. | — | Executed | SKC Construction, Inc. $231,615 · | ||
| Sep 22, 2023 | 62T08 | LakeDistrict 1 | This is a Bridge Preservation Project: bridge repair, joint replace/ repair and deck overlay on bridge carrying IL 60 (Townline Rd) over Des Plaines River. Located in the Villages of Vernon Hills and Mettawa in Lake County. The gross and net length is 0.39-miles (2,043-feet). | — | Executed | Martam Construction Incorporated $886,316 · | ||
| Sep 22, 2023 | 62T71 | LakeDistrict 1 | (3.35-Mile) SMART Overlay and ADA improvements, accessible pedestrian signal additions on IL 43 (Waukegan Rd), from South of IL 22 (Half Day Road) to Lake Cook Road, located in the Villages of Deerfield and Bannockburn in Lake County. | — | Executed | Peter Baker & Son Co. $3,787,665 · | ||
| Nov 17, 2023 | 62P09 | LakeDistrict 1 | Bridge deck replacement of the structures carrying IL 120 over Des Plaines River The proposed improvement consists of bridge deck replacement of the structures carrying IL 120 over Des Plaines River. Also includes bridge overlay and substructure repairs of the structures carrying Belvidere Road Tributary over IL 120 and IL 120 NW ramp at IL 21. It also includes minor substructure repair and riprap placement at IL 21 over Belvidere Road tributary. The project is in the Village of Gurnee in Lake County. Total gross length and net length 1033 (0.2 Mile) and 625 Feet (0.12 Mile) | — | Executed | Dunnet Bay Construction Company $5,544,296 · | ||
| Jan 19, 2024 | 61J82 | LakeDistrict 1 | Sidewalk reconstruction and traffic signal modifications at the intersection of Central Avenue and Hickory Street in Highland Park. | — | Executed | Alliance Contractors, Inc. $318,100 · | ||
| Jan 19, 2024 | 61K05 | LakeDistrict 1 | HMA resurfacing, widening, storm sewers, drainage structures, PCC sidewalks, HMA multi-use patch, and traffic signal improvements at the intersection of Wadsworth Road and Lewis Avenue in Waukegan and Beach Park. | — | Executed | Campanella and Sons, Inc. $4,199,910 · | ||
| Jan 19, 2024 | 62U69 | LakeDistrict 1 | Arterial routes sweeping in Lake County This contract consists of arterial routes sweeping in Lake County. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $2,640,000 · | ||
| Mar 8, 2024 | 61J99 | LakeDistrict 1 | Replace the bridge carrying Oak Spring Road over the Des Plaines River, 0.80 mile east of IL 21. | — | Executed | Dunnet Bay Construction Company $4,739,292 · | ||
| Mar 8, 2024 | 61K10 | LakeDistrict 1 | Full depth pavement reclamation, aggregate subgrade, HMA Pavement, curb, gutter and sidewalk replacement, and storm sewer on Fish Lake Road from north IL 120 to Nippersink Road in Volo. | — | Executed | Lenny Hoffman Excavating, Inc. $2,819,811 · | ||
| Mar 8, 2024 | 62R92 | LakeDistrict 1 | (1100 -Ft) (SN 049-0171) Bridge deck scarification and overlay, partial and full depth bridge deck, approach slab repair, expansion joint replacement, structural steel repair, and abutment bearing replacement, located over Metra Railroad and Rollins Rd in the Village of Fox Lake and Grant Township in Lake Co. | — | Executed | Martam Construction Incorporated $1,183,142 · | ||
| Mar 8, 2024 | 62T26 | LakeDistrict 1 | (3.51-Mile) Crack and Joint Sealing project along IL 132 (Grand Avenue) from 0.2-miles East of Hunt Club Road to Ferndale Street in the Village of Gurnee, Lake County. | — | Executed | SKC Construction, Inc. $242,111 · | ||
| Mar 8, 2024 | 62T59 | LakeMcHenryDistrict 1 | Hot-mix asphalt surface removal, pavement patching, hot-mix asphalt surface overlay, sidewalk removal and repl (6.1-Mile) SMART Overlay, ADA improvements: The work consists of hot-mix asphalt surface removal, pavement patching, hot-mix asphalt surface overlay, sidewalk removal and replacement for curb ramps (ADA) improvements, pavement markings, raised reflective pavement markers and detector loops. The project is located on US 12/ IL 59 (Rand Rd) from State Park Road/ East Street to North of IL 120, within the Villages of Spring Grove, Fox Lake and Volo in Lake and McHenry Counties. | — | Executed | Builders Paving, LLC $6,630,000 · | ||
| Mar 8, 2024 | 62U98 | CookLakeDistrict 1 | Debris and litter cleaning along I-94/US-41 (Edens Expwy) from I-90 (Kennedy Expwy) to Clavey Rd This contract consists of debris and litter cleaning along I-94/US-41 (Edens Expwy) from I-90 (Kennedy Expwy) to Clavey Rd. The project length is 200 miles. | — | Executed | William Dunbar Construction LLC. $117,482 · | ||
| Mar 8, 2024 | 62W53 | LakeDistrict 1 | 2,863-ft (0.54-miles). Intersection improvement of US 41 at Stearns School Road widening, addition of turning lanes, resurfacing, traffic signal modernization. Project includes improvements on Stearns School Road from Notting Hill Road to US 41 located in the Village of Gurnee and unincorporated Warren Township. | — | Executed | Campanella and Sons, Inc. $4,399,898 · | ||
| Apr 26, 2024 | 61K34 | LakeDistrict 1 | Pavement reconstruction on FAU 160 (Sprucewood Ln.) from Rolling Ridge Lane to Lake Shore Drive, continuing on Lake Shore from Sprucewood Lane to Beck Road in Lindenhurst. | — | Executed | Lenny Hoffman Excavating, Inc. $5,300,754 · | ||
| Apr 26, 2024 | 62M25 | LakeMcHenryDistrict 1 | (8.47-Mile) Standard Overlay, Milled Rumble Strips, Drainage Improvements on IL 173 (Kenosha St) from Greenwood Rd to Madison Ave. This project is in the Villages of Richmond, Spring Grove and in Unincorporated Hebron, Richmond and Burton Townships in McHenry and Lake Counties. | — | Executed | Payne & Dolan, Inc. $7,564,874 · | ||
| Apr 26, 2024 | 62T69 | LakeDistrict 1 | (4.65-Mile) SMART Resurfacing and ADA Ramp improvements from County Line Road to West of US 12 and includes road surface removal, HMA paving, sidewalk removal, installation of PCC sidewalk, detectable warnings, and placement of pavement markings. Improvements is in the Villages of Lake Zurich, North Barrington, Lake Barrington, and in Cuba and ELA Townships in Lake County. | — | Executed | Peter Baker & Son Co. $1,732,377 · | ||
| Jun 14, 2024 | 46648 | LakeWillDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width. The location of of the work is on various State-maintained highways in Lake and Will Counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $1,812,600 · | ||
| Jun 14, 2024 | 62R84 | CookLakeDistrict 1 | Installation of new fiber optic cable, conduit, PTZ cameras, network switches along six different corridors located in Cook and Lake Counties located primarily within Village of Skokie, Elmwood Park, North Chicago, and Lincolnwood. | — | Executed | H & H Electric Co. $1,113,578 · | ||
| Jun 14, 2024 | 62U77 | LakeDistrict 1 | ADA pedestrian ramps improvements, pavement patching, hot-mix asphalt surface removal, combination concrete cu (0.35-Mile) Designed Overlay consists of ADA pedestrian ramps improvements, pavement patching, hot-mix asphalt surface removal, combination concrete curb and gutter removal and replacement, structure adjustments and drainage structure cleaning, asphalt leveling binder and surface course, pavement markings, raised reflective pavement marker installation. Located on IL 176 (Park Avenue) from Garfield Rd to Park Pl, within the Village of Libertyville in Lake County. | — | Executed | Peter Baker & Son Co. $649,700 · | ||
| Aug 2, 2024 | 61K49 | LakeDistrict 1 | Resurfacing Indian Creek Road from Gilmer Road to the east village limits of Hawthorne Woods | — | Executed | Peter Baker & Son Co. $369,519 · | ||
| Aug 2, 2024 | 61K51 | LakeDistrict 1 | HMA Resurfacing, curb and gutter, sidewalks, drainage adjustments, and parkway restoration on North Avenue from Glen Flora Avenue to Julian Street in Waukegan | — | Executed | Peter Baker & Son Co. $957,987 · | ||
| Aug 2, 2024 | 61K52 | LakeDistrict 1 | Construction of a Open-spandrel arch ridge with cast-in-place concrete deck and bituminous overlay on Lake Road over an unamed ravine in Lake Forest. | — | Rejected | Dunnet Bay Construction Company $4,297,627 · | ||
| Sep 20, 2024 | 62P38 | LakeDistrict 1 | Curb ramps (ADA) improvements on Various Routes at Various locations within the Villages of Mundelein, Liberty This project consists of curb ramps (ADA) improvements on Various Routes at Various locations within the Villages of Mundelein, Libertyville and Vernon Hills in Central Lake County. | — | Executed | Alliance Contractors, Inc. $1,061,609 · | ||
| Sep 20, 2024 | 62P40 | LakeDistrict 1 | This is an ADA curb ramp installation project. This project is located along various State routes in the Villages of Barrington, Beach Park, Lake Zurich and Winthrop Harbor and the Cities of North Chicago, Park City and Waukegan in Lake County. | — | Executed | Alliance Contractors, Inc. $888,213 · | ||
| Sep 20, 2024 | 62V17 | CookLakeDistrict 1 | Project covers 14 miles along I-94 from Montrose Ave to Lake Cook Rd and 3 mile along US Route 41 from Lake Cook Rd to Park Ave. Improvements are within 8 separate cities and villages within Cook and Lake counties from Chicago to Highland Park. Project involves replacing the surveillance vehicle detection system, ramp metering system, 6 sign structures and installing wrong way detection system. Connection to fiberoptic system and network integration is also included. | — | Executed | Meade Inc. $9,281,773 · | ||
| Nov 8, 2024 | 61J87 | LakeDistrict 1 | Construction of a grade separation structure to carry the CN/WCL Railroad over US 14; Pavement reconstruction of US 14, construction of a pump station, relocation of the Flint Creek Tributary, box culvert construction, retaining and noise walls, watermain, sanitary sewer, traffic signals and roadway lighting between IL 59 and Valencia Avenue in Barrington. | — | Executed | IHC Construction Companies LLC and Curran Contracting Company JV $69,424,887 · | ||
| Nov 8, 2024 | 61K74 | LakeDistrict 1 | HMA reconstruction of Hazel Avenue from Wilmot Road to Waukegan Road in Deerfield. Includes curb and gutter, PCC Sidewalk, ADA improvements, bridge deck sealing and landscaping. | — | Executed | A Lamp Concrete Contractors, Inc. $10,184,632 · | ||
| Nov 8, 2024 | 62B66 | LakeDistrict 1 | Decommissioning of existing Pump Station 37 located in the IL 176 over US 41 bridge abutment (SN 049-0131), an The project consists of decommissioning of existing Pump Station 37 located in the IL 176 over US 41 bridge abutment (SN 049-0131), and construction of the new pump station in the northeast quadrant of the US 41 and IL 176 intersection with a new outfall pipe to the Skokie River. | — | Executed | F. H. Paschen, S.N. Nielsen & Associates LLC $15,494,185 · | ||
| Jan 17, 2025 | 61K91 | LakeDistrict 1 | Resurfacing Washington Avenue from Western Avenue to Sheridan Road in Highland. | — | Executed | Peter Baker & Son Co. $464,636 · | ||
| Jan 17, 2025 | 62W32 | LakeDistrict 1 | The installing scour countermeasures such as riprap erosion control and landscaping The improvement consists of the installing scour countermeasures such as riprap erosion control and landscaping. The project is located approximately 0.1 miles west of the Tri-State Tollway (I-94) and 1,100 ft east of Illinois Route 21 at SN 049-0046 and SN 049-0047 along Illinois Route 120 in the Village of Gurnee in Lake County. | — | Executed | Martam Construction Incorporated $617,286 · | ||
| Jan 17, 2025 | 62X49 | LakeDistrict 1 | A Bridge Painting of the existing structure (049-0171) carrying IL 59 over Rollins Road, the existing structur This improvement consists of a Bridge Painting of the existing structure (049-0171) carrying IL 59 over Rollins Road, the existing structure (049-0016) carrying Washington Road over US 41, and the existing structure (049-0097) carrying Washington Road over the UP RR in the Village of FOX Lake, and the Village of FOX Lake, and the City of Park City in Lake County for a total length of 749 feet. | — | Executed | Capital Industrial Services, LLC $893,330 · | ||
| Mar 7, 2025 | 61L05 | LakeDistrict 1 | Resurfacing, PCC base course, decorative PCC sidewalk, granite cobble curb, brick paver banding, and crosswalks, decorative lighting, and landscaping on Deerpath Road from Oakwood Avenue to Western Avenue in Lake Forest. | — | Executed | D'Land Construction, LLC $2,990,057 · | ||
| Mar 7, 2025 | 61L16 | LakeDistrict 1 | Sidewalk improvements at various intersections in Lake Forest. | — | Executed | D'Land Construction, LLC $246,136 · | ||
| Mar 7, 2025 | 61L17 | LakeDistrict 1 | Resurfacing Hart Road from West of the Village limits to Round Lake Road in Round Lake | — | Executed | Peter Baker & Son Co. $388,288 · | ||
| Mar 7, 2025 | 62U91 | LakeDistrict 1 | (1.61-Mile) Standard Overlay, New Shoulders improvement consisting of hot-mix asphalt surface removal, pavement patching, nominal curb and gutter replacement hot-mix asphalt resurfacing, installation of hot-mix asphalt shoulders, grading and shaping of existing aggregate shoulders, and thermoplastic pavement marking Old Skokie Road from US 41 (Skokie Highway) to the Wisconsin State Line within the Village of Wadsworth, in Lake County. | — | Executed | Payne & Dolan, Inc. $2,424,972 · | ||
| Mar 7, 2025 | 62X21 | CookLakeDistrict 1 | Cleaning and painting designated steel surfaces This is a bridge painting project consists of cleaning and painting designated steel surfaces. Location #1: IL-58 (Dempster St) over I-94 (Edens Expwy) Village of Skokie in Cook County SN: 016-0943. Location #2: Clavey Rd over US-41 (Edens) City of Highland Park in Lake County SN: 049-0165. Location #3: Tower Rd over I-94/US-41 (Edens) Village of Northfield in Cook County SN: 016-0815. | — | Executed | ERA-Valdivia Contractors, Inc. $1,181,744 · | ||
| Mar 7, 2025 | 62X79 | CookLakeDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy) in Cook and Lake Counties. | — | Executed | The Final Connection, Inc. $164,400 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.