Bid tab 62T98

Let Apr 28, 2023 · District 1 · Lake Sign up free

‹ Apr 2023 results

FAP 0535 22 HW

Let date
Friday, April 28, 2023
Contract
62T98 · job page
District
District 1
County
Lake
Highway
Limits
(172.9-Ft) The proposed improvement consists of partial removal and replacement of culvert located on IL 60 at the Ditch (West of Peterson Road) in the Village of Round Lake, Lake County.
Classification
Partial removal and replacement of culvert located on IL 60 at the Ditch (West of Peterson Road) in the Villag

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Alliance Contractors, Inc. Low bidder $378,118
2 MYS, Incorporated $387,961 +2.6%
3 Copenhaver Construction, Inc. $434,178 +14.8%
4 Lorig Construction Company $451,120 +19.3%

Bid tab: unit prices 52 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Alliance Contra…#2 MYS, Incorporat…#3 Copenhaver Cons…#4 Lorig Construct…
1X0900075 COFFERDAM TYP 1 IS WW2EACH $1.00 $12,500.00 $40,000.00 $100.00
2X2501800 SEEDING CL 4 MOD0.04ACRE $20,000.00 $28,500.00 $20,000.00 $20,000.00
3X2501820 SEEDING CL 5 MOD0.04ACRE $20,000.00 $28,500.00 $20,000.00 $20,000.00
4X6700407 ENGR FLD OFF A D112CAL MO $750.00 $1,800.00 $2,100.00 $1,500.00
5X7010216 TRAF CONT & PROT SPL1L SUM $51,200.00 $22,500.00 $59,000.00 $120,000.00
6Z0012754 STR REP CON DP = < 524SQ FT $570.00 $325.00 $210.00 $400.00
7Z0013798 CONSTRUCTION LAYOUT1L SUM $1.00 $10,000.00 $14,000.00 $30,000.00
8Z0015500 DEBRIS REMOVAL1L SUM $1.00 $5,000.00 $5,000.00 $1,000.00
9Z0054400 ROCK FILL7.1CU YD $100.00 $200.00 $200.00 $360.00
10Z0064800 SELECTIVE CLEARING1UNIT $2,000.00 $2,000.00 $2,000.00 $2,000.00
11Z0073510 TEMP TR SIGNAL TIMING11EACH $300.00 $360.00 $450.00 $300.00
1220200100 EARTH EXCAVATION22CU YD $25.00 $115.00 $100.00 $135.00
1320300100 CHANNEL EXCAVATION25CU YD $25.00 $115.00 $103.00 $135.00
1420400800 FURNISHED EXCAVATION22CU YD $1.00 $115.00 $20.00 $135.00
1520700220 POROUS GRAN EMBANK85CU YD $48.00 $75.00 $36.00 $125.00
1621001000 GEOTECH FAB F/GR STAB23SQ YD $1.00 $10.00 $10.00 $11.00
1721101615 TOPSOIL F & P 4512SQ YD $5.00 $12.50 $5.00 $5.00
1825000210 SEEDING CL 2A0.06ACRE $38,720.00 $17,500.00 $30,000.00 $40,000.00
1925000400 NITROGEN FERT NUTR9POUND $1.00 $3.30 $1.00 $1.00
2025000600 POTASSIUM FERT NUTR9POUND $1.00 $3.30 $1.00 $1.00
2125100115 MULCH METHOD 20.1ACRE $0.1000 $11,000.00 $10,000.00 $10.00
2225100630 EROSION CONTR BLANKET512SQ YD $1.50 $2.10 $3.00 $1.50
2328000250 TEMP EROS CONTR SEED9POUND $0.1000 $22.00 $0.0100 $0.1000
2428000305 TEMP DITCH CHECKS60FOOT $15.00 $25.00 $20.00 $15.00
2528000400 PERIMETER EROS BAR195FOOT $6.50 $7.25 $5.00 $6.50
2628100107 STONE RIPRAP CL A421SQ YD $375.00 $300.00 $120.00 $230.00
2728200200 FILTER FABRIC41SQ YD $0.0100 $5.00 $10.00 $7.00
2830300112 AGG SUBGRADE IMPR 1216SQ YD $60.00 $56.00 $60.00 $110.00
2944004250 PAVED SHLD REMOVAL16SQ YD $1.00 $30.00 $60.00 $100.00
3048101500 AGGREGATE SHLDS B 6130SQ YD $38.00 $25.00 $30.00 $30.00
3148203037 HMA SHOULDERS 1016SQ YD $305.00 $475.00 $250.00 $450.00
3250102400 CONC REM12CU YD $2,000.00 $1,500.00 $1,050.00 $1,600.00
3350200100 STRUCTURE EXCAVATION86CU YD $25.00 $140.00 $86.00 $90.00
3450800205 REINF BARS, EPOXY CTD4,950POUND $2.00 $5.25 $3.00 $4.00
3550901760 PIPE HANDRAIL12.5FOOT $795.00 $665.00 $300.00 $800.00
3651500100 NAME PLATES1EACH $800.00 $900.00 $1,100.00 $1,000.00
3752200020 TEMP SOIL RETEN SYSTM398SQ FT $20.00 $65.00 $111.00 $1.00
3854002040 EXPAN BOLTS 3/4 X 632EACH $12.00 $75.00 $85.00 $95.00
3954003000 CONC BOX CUL14.8CU YD $8,821.00 $4,500.00 $1,600.00 $5,000.00
4060905305 BOX CUL TO BE CLEANED69FOOT $65.00 $105.00 $100.00 $75.00
4163000001 SPBGR TY A 6FT POSTS25FOOT $55.00 $52.00 $200.00 $60.00
4263100167 TR BAR TRM T1 SPL TAN4EACH $4,150.00 $3,500.00 $4,000.00 $3,175.00
4363200310 GUARDRAIL REMOV201FOOT $8.00 $12.00 $10.00 $5.50
4466900200 NON SPL WASTE DISPOSL135CU YD $83.00 $85.00 $80.00 $85.00
4566900530 SOIL DISPOSAL ANALY1EACH $1,500.00 $2,250.00 $5,000.00 $2,000.00
4666901001 REG SUB P-CONST PLAN1L SUM $2,400.00 $5,500.00 $4,000.00 $3,100.00
4766901003 REG SUB F CON REPORT1L SUM $1,400.00 $600.00 $2,500.00 $1,200.00
4866901006 REG SUB MON15CAL DA $75.00 $850.00 $800.00 $850.00
4967100100 MOBILIZATION1L SUM $35,000.00 $20,000.00 $28,000.00 $26,000.00
5070107025 CHANGEABLE MESSAGE SN63CAL DA $35.00 $40.00 $40.00 $45.00
5172501000 TERMINAL MARKER - DA2EACH $40.00 $50.00 $100.00 $50.00
5278200005 GRDRAIL REF TYPE A6EACH $25.00 $12.00 $70.00 $10.00