Filtered by: County: DuPage Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 8, 2024 | 61K22 | DuPageDistrict 1 | Resurface Church Road from Grove Avenue to IL 19, and resurface Main Street from Church Road to York Road in Bensenville. | — | Executed | Builders Paving, LLC $914,627 · | ||
| Mar 8, 2024 | 62T66 | DuPageDistrict 1 | (5.5-miles) Crack and Joint Sealing. Location: FAP 311 (US 34) from Southwest of Authority Drive to West of IL 83 (Kingery Highway) within the Villages of Clarendon Hills, Downers Grove, and Westmont in DuPage County. | — | Executed | SKC Construction, Inc. $256,694 · | ||
| Mar 8, 2024 | 62T79 | DuPageDistrict 1 | (4.64-Mile) Crack and Joint Sealing on IL 83 (Kingery Hwy) from 0.1-mile north of Ridgemoor Drive to Cook County Line. The project is located within the Villages of Burr Ridge and Willowbrook in DuPage County. | — | Executed | Freehill Asphalt, Inc. $559,556 · | ||
| Mar 8, 2024 | 62U96 | CookDuPageDistrict 1 | 219.6 Debris and litter cleaning along I-290 and I-290 Extension from IL 83 (Kingery Highway) to Austin Boulevard. | — | Executed | William Dunbar Construction LLC. $128,995 · | ||
| Mar 8, 2024 | 62W07 | CookDuPageDistrict 1 | Debris and litter cleaning along I-290/IL-53 from Lake Cook Rd to IL-83 This contract consists of debris and litter cleaning along I-290/IL-53 from Lake Cook Rd to IL-83. The project length is 240 miles. | — | Executed | William Dunbar Construction LLC. $140,978 · | ||
| Apr 26, 2024 | 60P75 | DuPageDistrict 1 | (1.62-Mile) Proposed improvement includes widening and reconstruction of IL Route 56 (Butterfield Road) from West of I-355 to Arboretum Drive including Bridge repairs, multi-use path, traffic signals and lighting. | — | Executed | R. W. Dunteman Company $38,948,948 · | ||
| Apr 26, 2024 | 61J14 | DuPageDistrict 1 | Replace existing structure with a single-span PPC bulb t-beam superstructure with concrete deck, HMA pavement, retaining wall, HMA multi-use path, storm sewers, sidewalks, ADA improvements, Guardrail, curb and gutter, and signage on Warrenville Road over the East Branch of the DuPage River in Lisle. | — | Executed | Dunnet Bay Construction Company $8,419,194 · | ||
| Apr 26, 2024 | 61K00 | DuPageDistrict 1 | Resurfacing Lombard Road from Army Trial Boulevard to Fullerton Avenue in the Village of Addison. | — | Executed | R. W. Dunteman Company $1,427,498 · | ||
| Apr 26, 2024 | 61K13 | DuPageDistrict 1 | Sidewalk construction along Armitage Avenue from Ardmore Avenue to Ellsworth Avenue in Addison. | — | Executed | R. W. Dunteman Company $544,000 · | ||
| Apr 26, 2024 | 61K32 | DuPageDistrict 1 | Pavement reconstruction with an HMA multi-use path, curb and gutter, HMA shoulders, sidewalks, ADA ramps, traffic signals, culvert extension, and storm sewer on Gary Avenue from Jewell Road to Harrison Avenue in Wheaton. | — | Executed | Plote Construction, Inc. $4,291,788 · | ||
| Apr 26, 2024 | 61K33 | DuPageDistrict 1 | HMA Resurfacing, sidewalks, traffic signal modifications, and pavement markings on Main Street from Sherman Road to Franklin Street in Downers Grove. | — | Executed | K-Five Construction Corporation $2,384,159 · | ||
| Apr 26, 2024 | 62M37 | DuPageDistrict 1 | Bridge deck overlay and joint repair of the structure located at IL 83 (Kingery Highway) over I-88, Dupage Cou (1014-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located at IL 83 (Kingery Highway) over I-88, Dupage County. | — | Executed | Lorig Construction Company $2,360,619 · | ||
| Apr 26, 2024 | 62P06 | DuPageDistrict 1 | Culvert repair of the structure located at I-55 at stream (0 (1157-Ft) The proposed improvement consists of culvert repair of the structure located at I-55 at stream (0.9 Mi E. of Cass Ave) in Downers Grove Township, DuPage County. | — | Executed | Lorig Construction Company $1,281,947 · | ||
| Apr 26, 2024 | 62R91 | DuPageDistrict 1 | Bridge Deck Overlay, Bridge Joint Replacement / Repair at US 20 (Lake Street) over IL 390 (Elgin O'Hare Expressway). This project is located in the Village of Hanover Park in DuPage County. | — | Executed | Martam Construction Incorporated $1,888,608 · | ||
| Apr 26, 2024 | 62U73 | DuPageDistrict 1 | (2,000-Ft) Traffic Signal Modernization and Intersection Improvements located at IL 83 (Kingery Highway) and Bluff Rd. in the Downers Grove Township, DuPage County. | — | Active | R. W. Dunteman Company $1,457,500 · | ||
| Apr 26, 2024 | 62V97 | DuPageDistrict 1 | This improvement is located at the IDOT Oakbrook Maintenance yard at 17W125 Butterfield Road, Villa Park, IL. Scope of work includes pavement removal, Catch Basins PCC reconstruction, placement of subbase granular material, HMA asphalt pavement, PCC pavement, and thermoplastic pavement marking. | — | Executed | K-Five Construction Corporation $780,422 · | ||
| Apr 26, 2024 | 62W09 | CookDuPageDistrict 1 | Debris cleaning and litter picking located on I-55 - Stevenson expressway from IL 43 (Harlem Ave) to I-355 in This project consists of debris cleaning and litter picking located on I-55 - Stevenson expressway from IL 43 (Harlem Ave) to I-355 in Cook and DuPage Co. | — | Executed | The Final Connection, Inc. $140,400 · | ||
| Jun 14, 2024 | 46649 | DuPageMcHenryDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width. The location of the work is on various State-maintained highways in McHenry and DuPage Counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $893,950 · | ||
| Jun 14, 2024 | 62N32 | DuPageDistrict 1 | (14.64-Mile) Changeable Message Signs, Signal Timing/ Progression, Signing (New), Surveillance, Traffic Signal Modernization and ADA improvements. Located on IL 56 from IL 59 to York Rd in the Cities of Wheaton, Warrenville, Oakbrook Terrace, the Villages of Downers Grove, Oak Brook, Lombard, and Milton Township in DuPage County. | — | Executed | H & H Electric Co. $15,380,412 · | ||
| Jun 14, 2024 | 62N40 | CookDuPageDistrict 1 | (10.1-Mile) Changeable Message Signs, Signal Timing/ Progression, Signing (New) Surveillance, Traffic Signal Modernization and ADA Improvements. Located on IL 64 (North Avenue) from York Rd to IL 50 (Cicero Ave) in the Cities of Chicago, Elmhurst, Northlake, the Villages of Elmwood Park, Melrose Park, Oak Park, River Forest, River Grove and Stone Park in DuPage and Cook Co. | — | Executed | John Burns Construction Company $17,075,556 · | ||
| Aug 2, 2024 | 61K57 | DuPageDistrict 1 | Resurfacing St. Charles Road from IL 53 to Grace Street in Lombard. | — | Executed | R. W. Dunteman Company $1,814,750 · | ||
| Sep 20, 2024 | 61G80 | DuPageDistrict 1 | Replace existing struture with a four-cell cast-in-place box culvert with 10X12 cells, south of the Arlington Drive and Greenbrook Boulevard Intersection in Hanover Park. Work includes roadway reconstruction and replacing water mains. | — | Executed | Martam Construction Incorporated $2,262,440 · | ||
| Sep 20, 2024 | 62R60 | DuPageDistrict 1 | The scope of work includes designed overlay, new shoulders and ADA improvements This project is located along IL. 19 (Irving Park Road) from Roselle Road to east of Baker Drive. The gross and net length is 13,262 feet (2.51 miles). It is located in the Villages of Itasca and Roselle and unincorporated Bloomingdale Township in DuPage County. | — | Executed | R. W. Dunteman Company $3,872,485 · | ||
| Sep 20, 2024 | 62W80 | DuPageDistrict 1 | Reconstruction of the northeast wingwall at US 20 (Lake St) over I-290, pavement patching, removing and re-ere Scope of work consists of reconstruction of the northeast wingwall at US 20 (Lake St) over I-290, pavement patching, removing and re-erecting the existing guardrail terminal, maintenance of traffic, and pavement markings. Improvement is located in the City of Elmhurst in DuPage County. Gross Length= 2628 FT (0.5 Miles); Net Length= 12 FT (0.002 Miles). | — | Executed | Alliance Contractors, Inc. $221,327 · | ||
| Nov 8, 2024 | 60T22 | DuPageDistrict 1 | (2,439 Ft) Channelization, Traffic Signal Installation: Median improvement, new HMA shoulders, HMA resurfacing, pavement widening, pavement patching, grading and shaping ditches, curb ramps (ADA) improvements, pavement markings, installation of new traffic signal and APS. FAP 870: IL 53 (Columbine Ave), from Bryant Avenue to Surrey Drive in the Villages of Lombard and Glen Ellyn in DuPage County. | — | Rejected | |||
| Nov 8, 2024 | 61K65 | DuPageDistrict 1 | Resurface Liberty Street from Eola Road to Commons Drive in Aurora. | — | Executed | K-Five Construction Corporation $734,188 · | ||
| Nov 8, 2024 | 61K75 | DuPageDistrict 1 | Resurface Schick Road from the west corporate limits to County Farm Road in Hanover Park. | — | Executed | K-Five Construction Corporation $939,975 · | ||
| Nov 8, 2024 | 62G63 | DuPageDistrict 1 | (6.63-Mile) Standard and Designed Overlay, ADA Improvements, Patching, Signal Modifications, Landscape Medians. Project is located on IL-38 (Roosevelt Rd) from East of Technology Blvd to Pierce Ave. in the Cities of West Chicago, Wheaton and the Village of Winfield in Cook County. | — | Executed | R. W. Dunteman Company $8,631,060 · | ||
| Nov 8, 2024 | 62T10 | DuPageDistrict 1 | (5.78-Mile) SMART Overlay and ADA Improvements: HMA surface removal and replacement, Class D patches, detector loops replacement, pavement markings, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements. Located along IL 59 (Neltnor Boulevard ) from South of Heritage Woods Drive to North of Batavia Road within the City of West Chicago and the Village of Warrenville. | — | Executed | Plote Construction, Inc. $5,630,000 · | ||
| Dec 13, 2024 | 62T17 | DuPageDistrict 1 | (760-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair at IL 38 (Roosevelt Rd) at IL 53. This project is located in the Village of Glen Ellyn in DuPage County. | — | Executed | D. Construction, Inc. $1,972,826 · | ||
| Dec 13, 2024 | 62T30 | DuPageDistrict 1 | (307-Ft) Bridge preservation project: Deck overlay, Joints replacement/repair. Located on IL 53 / Rohlwing Road, at Canadian National (CN) Railroad (approximately 0.1-miles South of Fullerton Avenue) in the Village of Addison. | — | Executed | Martam Construction Incorporated $1,491,736 · | ||
| Jan 17, 2025 | 61K01 | DuPageDistrict 1 | Sidewalk construction, traffic signals and street lights on York Street from WB I-290 ramps/Crestview Avenue to Lake Street in Elmhurst. | — | Rejected | Martam Construction Incorporated $2,649,349 · | ||
| Jan 17, 2025 | 61K90 | DuPageDistrict 1 | Resurfacing Indian Trail Road from the Kane/DuPage County line to Eola Road in Aurora. | — | Executed | Geneva Construction Company $1,102,489 · | ||
| Jan 17, 2025 | 61L04 | DuPageDistrict 1 | Roadway reconstruction on Woodridge Drive from Hobson Road to Center Drive in Woodridge. | — | Executed | K-Five Construction Corporation $2,756,923 · | ||
| Jan 17, 2025 | 62T21 | DuPageDistrict 1 | (6.15-Mile) Smart Overlay and ADA Ramp improvements, hot-mix asphalt surface removal and replacement, pedestrian ramp, pavement patching, pavement markings. Project location at IL 56 (Butterfield Road) from 0.4 mile west of IL 59 to East of Naperville Road within Cities of Warrenville, Wheaton and Aurora in Dupage Co. | — | Executed | R. W. Dunteman Company $6,615,450 · | ||
| Jan 17, 2025 | 62W49 | DuPageDistrict 1 | (1.40-Mile) Standard Overlay, ADA Improvements: Hot-mix asphalt surface removal earth excavation, new shoulders, pavement patching, hot-mix asphalt surface course, hot-mix asphalt binder course, curb and gutter removal and replacement, longitudinal joint sealing, thermoplastic pavement markings, raised reflective pavement markers, detector loops replacement and incidental and collateral work Project is located on I-55 (North) Frontage Road, from Clarendon Hills Road to Cass Avenue, within the Ci | — | Executed | K-Five Construction Corporation $1,066,333 · | ||
| Jan 17, 2025 | 62X75 | CookDuPageDistrict 1 | Expressway Cleaning (Litter/Debris Removal) on various routes in D1. | — | Executed | Orlando Lawn Service, Inc. $276,000 · | ||
| Mar 7, 2025 | 61L10 | DuPageDistrict 1 | PCC Sidewalk with segmental concrete block retaining wall from Freeport Drive to DuJardin Elementary Shcool. Additional work includes curb and gutter, pavement patching, storm sewer, steel railing, and fencing. | — | Executed | D'Land Construction, LLC $225,598 · | ||
| Mar 7, 2025 | 62N33 | DuPageDistrict 1 | (16.7-Mile) Changeable Message Signs, Signal Timing/Progression, Signing (New), Surveillance, Traffic Signal Modernization and ADA improvements. Located on IL 64 (North Avenue) from Smith / Kautz Rd to York St in the Cities of St. Charles West Chicago, and Elmhurst, and in the Villages of Carol Stream, Glendale Heights, Lombard, Addison, and Villa Park in DuPage County. | — | Rejected | John Burns Construction Company $25,464,000 · | ||
| Mar 7, 2025 | 62R58 | CookDuPageDistrict 1 | This project is located along IL 19 (Irving Park Road) from East of Wise Road to Roselle Road. The scope of work includes designed overlay, new shoulders, and ADA improvements. The gross and net length is 14,175 feet (2 .68 miles). It is located in the Villages of Roselle and Schaumburg, and unincorporated Bloomingdale and Schaumburg Townships in Cook and DuPage Counties. | — | Executed | R. W. Dunteman Company $4,792,444 · | ||
| Mar 7, 2025 | 62T31 | DuPageDistrict 1 | Gross and Net Length = 3,713 feet (0.703 miles) and 341 feet (0.065 miles). Bridge Preservation Project: Deck Overlay, Joint Replacement / Repair at IL 53 over Ginko Way (Morton Arboretum) and over East Branch DuPage River. This project is located in Unincorporated DuPage County. | — | Executed | D. Construction, Inc. $1,159,146 · | ||
| Mar 7, 2025 | 62W60 | CookDuPageDistrict 1 | This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, installation of accessible pedestrian signals with ADA compliant ramps at various locations in District 1. | — | Executed | H & H Electric Co. $1,375,723 · | ||
| Mar 7, 2025 | 62X76 | CookDuPageWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-55 Expressway from ILL 43 (Harlem Ave) to Reed Road in Cook, DuPage, and Will Counties. | — | Executed | Thor General Contracting LLC $305,910 · | ||
| Apr 25, 2025 | 61G79 | DuPageDistrict 1 | Widening the North Aurora road underpass and construction of railroad Bridges to carry WCL and BNSF Railways over North Aurora Road in Naperville. | — | Executed | OHLA Central, Inc. $33,197,030 · | ||
| Apr 25, 2025 | 61K79 | DuPageDistrict 1 | Construct HMA bike paths at various locations in Carol Stream. | — | Executed | Everlast Blacktop Inc. $871,518 · | ||
| Apr 25, 2025 | 61K95 | DuPageDistrict 1 | HMA resurfacing on Lombard Rod from Army Trail Boulevard to Lake Street in Addison. Includes; ADA improvements, storm sewers, and Landscaping. | — | Executed | R. W. Dunteman Company $1,638,372 · | ||
| Apr 25, 2025 | 61L29 | DuPageDistrict 1 | HMA resurfacing on Fairfield Way between Lake Street and Bloomingdale Road in Bloomingdale. Includes; Patching, curb and gutter, and frame and grate adjustments. | — | Executed | Builders Paving, LLC $1,534,281 · | ||
| Apr 25, 2025 | 62V86 | DuPageDistrict 1 | (1.929-Mile) SMART Overlay, ADA Improvements: Removing and replace (HMA) surface course, pavement patching and curb removal and replacement, curb ramps, drainage structures adjustment and cleaning, pavement markings, raised reflective pavement markers. Pedestrian signals improvements (APS), detector loops replacement located on IL 53 (Lincoln Avenue), from North of 61st Street to 75th Street in the Villages of Woodridge and Lisle in DuPage County. | — | Executed | K-Five Construction Corporation $2,285,003 · | ||
| Jun 13, 2025 | 62N39 | CookDuPageDistrict 1 | (9.38-Mile) Changeable Message Signs, Signal Timing/Progression, Signing (New), Surveillance, Traffic Signal Modernization, and ADA Improvements. Located along 22nd St / Cermak Rd from York Rd to IL 50 (Cicero Ave.) in the Village of Oak Brook in DuPage County, and in the Villages of Hillside, Westchester, Broadview North Riverside, Forest Park, the City of Berwyn, and the Town of Cicero,in Cook County. | — | Executed | Meade Inc. $20,875,047 · | ||
| Jun 13, 2025 | 62V88 | DuPageDistrict 1 | Curb and gutter spot repairs, sidewalk removal and replacement for curb ramps for sidewalks (ADA), cold asphal (3,848-Ft) Designed Overlay, ADA Improvements, New Shoulders consists of curb and gutter spot repairs, sidewalk removal and replacement for curb ramps for sidewalks (ADA), cold asphalt pavement milling, patches (Class D), replace existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, longitudinal joint sealing, resurfacing (inlay) with HMA binder and surface course, new thermoplastic pavement markings and raised reflective pavement markers, accessible pedestrian sig | — | Executed | R. W. Dunteman Company $1,208,153 · | ||
| Jun 13, 2025 | 62X60 | DuPageDistrict 1 | Designed overlay, ADA improvements, and collateral work necessary to complete the project (2,909-Ft) Improvement consists of Designed overlay, ADA improvements, and collateral work necessary to complete the project. Located on Gary-s Mill Road from IL. 38 to IL. 59 in the City of West Chicago. | — | Executed | R. W. Dunteman Company $842,712 · | ||
| Aug 1, 2025 | 61K77 | DuPageDistrict 1 | Construct a shared-use path along Elizabeth Drive from Forest Preserve Drive to Wood Dale Road, and Wood Dale from Murray Drive to Elizabeth Drive in Wood Dale. | — | Executed | R. W. Dunteman Company $553,433 · | ||
| Aug 1, 2025 | 61L45 | DuPageDistrict 1 | Scarification of existing PCC pavement, and HMA resurfacing on Western Frontage Road from IL 83 to Oakleaf Drive in Addison Township. | — | Executed | R. W. Dunteman Company $495,500 · | ||
| Aug 1, 2025 | 61L46 | DuPageDistrict 1 | Construct Multi-Use Paths along various routes in Hanover Park. Includes; PCC Sidewalk, and steel plate beam guardrail. | — | Executed | A Lamp Concrete Contractors, Inc. $1,424,943 · | ||
| Aug 1, 2025 | 61L47 | DuPageDistrict 1 | HMA resurfacing and widening of Town Road from West Roosevelt Road (IL 38) to West Washington Street in West Chicago. Includes; curb and gutter, sidewalks, ADA ramps, driveways, and storm sewer. | — | Executed | Everlast Blacktop Inc. $1,807,185 · | ||
| Aug 1, 2025 | 62W21 | DuPageDistrict 1 | Joint replacement, substructure repairs and steel repairs of the bridge, located on I-55 at Cass Avenue (Overh (500-Ft) Bridge Deck Overlay on SN 022-0072 consists of joint replacement, substructure repairs and steel repairs of the bridge, located on I-55 at Cass Avenue (Overhead) in the Village of Darien, DuPage County, Illinois. | — | Executed | Martam Construction Incorporated $1,781,767 · | ||
| Sep 19, 2025 | 61L69 | DuPageDistrict 1 | Construct a prefabicated pedestrian truss bridge to carry Cricket Trail extension over IL 83 in Elmhurst. | — | Executed | D. Construction, Inc. $3,634,117 · | ||
| Sep 19, 2025 | 62W62 | CookDuPageWillDistrict 1 | This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals, installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals. Installations are various locations in District 1. | — | Executed | John Burns Construction Company $2,170,856 · | ||
| Nov 7, 2025 | 61J54 | DuPageDistrict 1 | Extension of the west branch of DuPage River Trail from Gary's Mill Road to an existing trail within the West DuPage Woods Forest Preserve. | — | Executed | Lorig Construction Company $6,927,969 · | ||
| Nov 7, 2025 | 61L57 | DuPageDistrict 1 | Resurfacing Stonebridge Boulevard from Sheffer Road to Indian head Road, and from Sheffer Road to Eola Road in Aurora. | — | Executed | K-Five Construction Corporation $1,786,248 · | ||
| Nov 7, 2025 | 61L78 | DuPageDistrict 1 | Resurfacing Rober Palmer Drive from North York Street to South York Street in Elmhurst. | — | Executed | A Lamp Concrete Contractors, Inc. $1,308,888 · | ||
| Nov 7, 2025 | 61L79 | DuPageDistrict 1 | HMA resurfacing on Lambert Road from the South Village limits to IL 38 in Glen Ellyn. Includes; pavement patching, curb and gutter, sidewalks, ADA ramps, and q traffic signal maintenance. | — | Executed | K-Five Construction Corporation $1,759,309 · | ||
| Nov 7, 2025 | 61L80 | DuPageDistrict 1 | Resurfacing Riford Road from St. Harles Road to Crescent Boulevard in Glen Ellyn. | — | Executed | Schroeder Asphalt Services, Inc. $603,175 · | ||
| Nov 7, 2025 | 80B70 | DuPageDistrict 1 | Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim The project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes within DuPage County. | — | Executed | Central Sweeping of Illinois, LLC $2,013,220 · | ||
| Jan 16, 2026 | 61J01 | DuPageDistrict 1 | Intersection improvements and traffic signal modification on Lemont Road from 83rd Street to 87th Street, and on 87th Street from Havens Drive to Lemont Rd. | — | Executed | R. W. Dunteman Company $9,341,000 · | ||
| Jan 16, 2026 | 61L36 | DuPageDistrict 1 | HMA resurfacing and intersection channelization at Main Street and Oxford St. in Downers Grove. Includes sidewalks, curb and gutter, storm sewers, street light relocation and pavement markings. | — | Executed | Acura Inc. $2,105,861 · | ||
| Jan 16, 2026 | 61L44 | DuPageDistrict 1 | Resurfacing Mittel Drive from Thorndale Avenue to Devon Avenue in Wood Dale. | — | Executed | Builders Paving, LLC $895,259 · | ||
| Jan 16, 2026 | 80B85 | CookDuPageDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-290/ IL 110; I-290A, FAP 342 and ILL 53 expressways from Lake Cook Road to Wells St. in Cook and DuPage Counties. | — | Executed | Thor General Contracting LLC $650,328 · | ||
| Jan 16, 2026 | 80B86 | CookDuPageWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking project shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-55 - Stevenson expressway from Reed Road to Lake Shore Dr in Cook, DuPage, and Will Counties. | — | Executed | Thor General Contracting LLC $515,515 · | ||
| Feb 27, 2026 | 80B08 | DuPageDistrict 1 | Hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement (1.21-Mile) Smart Overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement of thermoplastic pavement markings located on Busse Rd (Illinois Route FAP 344, IL 83), beginning south of Bryn Mawr Ave and ending at Illinois 19 (Irving Park Rd). in the Village of Bensenville in DuPage County. | — | Executed | Builders Paving, LLC $2,172,384 · | ||
| Feb 27, 2026 | 80B15 | DuPageDistrict 1 | (8,333-Ft) Standard Overlay of the existing PCC pavement with HMA surface course and binder course, thermoplastic pavement markings, ADA improvements for curb ramps, combination concrete curb and gutter, concrete medians, pavement widening for flush medians, located along IL Route 38 (Roosevelt Road) from east of Nicoll Way to Edson Avenue in the Villages of Glen Ellyn and Lombard in DuPage County. | — | Executed | R. W. Dunteman Company $4,255,555 · | ||
| Feb 27, 2026 | 80B25 | DuPageDistrict 1 | (2.5-Mile) Standard Overlay, ADA Improvements, New Shoulders: Removing and replacing exist. hot-mix asphalt, (HMA) surface and binder course. Narrow (minor) pavement widening, new HMA shoulders in place of existing aggregate, and median improvement. Spot locations pavement patching and curb removal and replacement. Curb ramps for sidewalks (ADA) improvements, drainage structures adjustment and cleaning. pavement markings, raised reflective pavement markers, pedestrian signals improvements (APS), | — | Executed | R. W. Dunteman Company $3,330,985 · | ||
| Apr 24, 2026 | 61L84 | DuPageDistrict 1 | HMA resurfacing of FAU 1379 (Fullerton Ave.) from Gary Ave. to Schmale Rd. in the Village of Carol Stream. Additional work includes curb and gutter, sidewalks with ADA ramps, street lighting, pavement marking and other required work. | — | Executed | K-Five Construction Corporation $2,324,754 · | ||
| Apr 24, 2026 | 61M36 | DuPageDistrict 1 | Resurfacing Mill Pond Drive from Schmale Road to Exchange Boulevard/President Street in Glendale Heights. | — | Executed | Builders Paving, LLC $979,958 · | ||
| Apr 24, 2026 | 61M37 | DuPageDistrict 1 | Resurfacing on North Grace Street from IL 64/North Avenue to East St. Charles Road in Lombard. | — | Executed | R. W. Dunteman Company $1,684,000 · | ||
| Apr 24, 2026 | 80B07 | DuPageDistrict 1 | Hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement (1.52-Mile) Smart Overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement of thermoplastic pavement markings. located on Rohlwing Rd (Illinois Route FAP 870 IL 53), beginning south of 75th Street and ending at the Will County Line in the Village of Woodridge in DuPage County. | — | Executed | Builders Paving, LLC $1,578,728 · | ||
| Apr 24, 2026 | 80B54 | DuPageDistrict 1 | Bridge painting on various routes in DuPage County. | — | Executed | ERA-Valdivia Contractors, Inc. $921,204 · | ||
| Apr 24, 2026 | 80B68 | DuPageDistrict 1 | Concrete surface removal, placement of HMA binder and surface courses, pavement patching, placement of pavemen (13,313-Ft) This work consists of concrete surface removal, placement of HMA binder and surface courses, pavement patching, placement of pavement markings, ADA improvements. The project is located along FAP Route 338 (IL 59) and extends from McCoy drive to Artesian Road in DuPage County Illinois. | — | Executed | D. Construction, Inc. $4,613,164 · | ||
| Jun 12, 2026 | 62V08 | CookDuPageKaneDistrict 1 | Ditch regrading, culvert replacement, and various other drainage improvements The work on this project consists of ditch regrading, culvert replacement, and various other drainage improvements. This project is in DuPage County, This project is in DuPage County, Cook County and Kane County. | — | Executed | D. Construction, Inc. $1,863,322 · | ||
| Jun 12, 2026 | 62V78 | DuPageKaneDistrict 1 | (1.31-Mile) This is a crack and joint sealant improvement consisting of routing cleaning, and sealing of longitudinal cracks and joints within concrete pavement, concrete patching, grading and shaping shoulders, some guardrail replacement, modified urethane pavement marking. This improvement is located within the City of Geneva and West Chicago in Kane and DuPage Counties. | — | Executed | Mosley Construction 1, LLC $850,529 · | ||
| Jun 12, 2026 | 62X52 | DuPageDistrict 1 | A full depth patching of the top slab over the culvert at the unnamed stream, concrete repair of the north hea The project consists of a full depth patching of the top slab over the culvert at the unnamed stream, concrete repair of the north headwall. Located at culvert (SN# 022-0567) in the City of Darien in DuPage County. | — | Executed | D. Construction, Inc. $266,169 · | ||
| Jul 31, 2026 | 61M40 | DuPageDistrict 1 | Implementation of flashing yellow arrow signals at five existing signalized intersections along 63rd St. in Dupage County. | — | Executed | Home Towne Electric, Inc. $2,996,846 · | ||
| Sep 18, 2026 | 80B49 | DuPageDistrict 1 | (3,716-Ft) Bridge Repairs (S.N. 022-0161) includes bridge deck scarification, latex concrete overlay, joint reconstruction, and patching, butt joints, HMA overlay of the approach pavement, concrete curb and gutter replacement, concrete median replacement, drainage structure adjustments, and pavement marking replacement. The project is located along IL Route 38 (Roosevelt Road) over the East Branch DuPage River in the Village of Glen Ellyn in DuPage County, Illinois. | — | Executed | Martam Construction Incorporated $759,267 · |
201–283 of 283‹ Prev
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.