J. LEE MILLIGAN, INC.

Texas bid history Sign up free

‹ All contractors

Contact information

Email
doug@jlminc.net
Phone
(806) 373-4386
Fax
(806) 373-5350
Address
9200 TRIANGLE DR, AMARILLO, TX 79108
TxDOT prequalification
Construction qualified
218BidsSep 11, 2013 to Sep 3, 2026
59Wins (low bidder)
27.1%Win rate
$589,197,399Total won

Competitor scorecard

Last 5 years in Texas
26.7%Win rate23 of 86 bids
+12.4%Average bid vs estimate
+6.4%Winning bids vs estimate
+17.9%Over the low bid when they loseAverage field: 4.4 bidders
Head to headTimes metBeat themLost to themRecord
RK HALL, LLC49 2326 47%
GILVIN-TERRILL, LTD.49 3316 67%
DUININCK, INC.41 1625 39%
KIEWIT INFRASTRUCTURE SOUTH CO.20 164 80%
L A FULLER & SONS CONSTRUCTION, LTD.17 611 35%
A. L. HELMCAMP, INC.17 314 18%
EARTH BUILDERS, L.P.11 38 27%
ZACK BURKETT CO.8 17 13%
OVERLAND CORPORATION7 43 57%
TOUCHSTONE RESOURCES, LLC6 33 50%

Bid history

ExcelCSV
Let dateCCSJProjectRankTheir bidLow bidvs low
Sep 3, 2026 0275-03-072 IH 40 AT SH 207 BRIDGE REPLACEMENTCarson · Amarillo 5 of 7 $12,984,816 $9,899,343GILVIN-TERRILL, LTD. +31.2%
Sep 3, 2026 0844-04-011 FM 1547 @ Buck CreekCollingsworth · Childress 7 of 7 $5,691,985 $3,017,334COPPELL CONSTRUCTION CO., I… +88.6%
Aug 6, 2026 0541-02-033 SH 256 FM 2361, E to US 287Hall · Childress 1 of 3 $9,477,781 $9,477,781 Won
Aug 6, 2026 0041-07-121 US 87 HIR AMA CRK TO SL 335Potter · Amarillo 1 of 3 $30,085,056 $30,085,056 Won
Aug 6, 2026 0168-03-038 US 60- In Friona 5th St. to WalnutParmer · Lubbock 2 of 5 $10,064,052 $9,764,859A. L. HELMCAMP, INC. +3.1%
Aug 5, 2026 2635-05-005 SL 335 B-2: NEW LOCATION AMA LOOP, PH VRandall · Amarillo 1 of 5 $42,220,204 $42,220,204 Won
Aug 5, 2026 6505-52-001 FY 27 Amarillo District FlexbaseDallam · Amarillo 4 of 4 $1,381,073 $1,230,475HOLMES CONSTRUCTION CO., L.… +12.2%
Jul 29, 2026 6505-04-001 FY 27 Amarillo Area HMACRandall · Amarillo 2 of 2 $676,375 $625,000RK HALL, LLC +8.2%
Jun 3, 2026 0105-06-023 SH 70 US 82Dickens · Childress 2 of 6 $4,088,032 $4,016,029A. L. HELMCAMP, INC. +1.8%
Jun 2, 2026 0105-04-047 SH 70 @ Quitaque RiverMotley · Childress 8 of 9 $5,374,971 $3,403,214SKYLINE BRIDGE LLC +57.9%
May 7, 2026 0880-04-040 FM 179-US 62 to LP 88 (FM 1585)Lubbock · Lubbock 4 of 6 $12,730,908 $9,632,448A. L. HELMCAMP, INC. +32.2%
May 6, 2026 6497-68-001 General Maintenance Amarillo AE FY 26Potter · Amarillo 1 of 1 $6,531,750 $6,531,750 Won
Apr 7, 2026 1245-02-052 FY 26 RM 1061 OVERLAYPotter · Amarillo 5 of 6 $8,892,413 $7,487,324L A FULLER & SONS CONSTRUCT… +18.8%
Feb 5, 2026 0098-03-037 SH 6 US 70 TO Knox C/L OverlayFoard · Childress 7 of 7 $8,772,061 $6,793,699ZACK BURKETT CO. +29.1%
Feb 4, 2026 0904-02-051 IRWIN RD @ E AMA CREEK OFF-SYSTEM BRIDGEPotter · Amarillo 5 of 7 $2,769,350 $1,996,761L A FULLER & SONS CONSTRUCT… +38.7%
Jan 7, 2026 0711-02-045 FM 104 WideningCottle · Childress 4 of 8 $6,993,552 $6,279,570ZACK BURKETT CO. +11.4%
Jan 6, 2026 0032-04-034 Super 2 FM 1038, S to King C/LCottle · Childress 8 of 9 $56,600,784 $46,493,743ZACK BURKETT CO. +21.7%
Dec 2, 2025 6482-44-001 Castro Co. FM145 Roadway WideningCastro · Lubbock 2 of 5 $2,377,155 $2,282,170A. L. HELMCAMP, INC. +4.2%
Dec 2, 2025 0041-02-020 2026 HSIP US 385 TURN LANES 1/3Hartley · Amarillo 1 of 6 $15,925,814 $15,925,814 Won
Nov 6, 2025 0042-12-096 US 287 Hall C/L to 2102' W of FM 164Childress · Childress 5 of 8 $5,724,844 $5,183,756RK HALL, LLC +10.4%
Nov 5, 2025 3327-01-006 FM 3257 Greenbelt Lake RoadDonley · Childress 3 of 6 $1,955,763 $1,781,819EARTH BUILDERS, L.P. +9.8%
Sep 5, 2025 0355-05-046 SH 207 OVHansford · Amarillo 2 of 5 $12,947,164 $12,484,683DUININCK, INC. +3.7%
Aug 7, 2025 6486-66-001 FY 26 AMA District FlexbaseRandall · Amarillo 4 of 4 $2,182,010 $1,718,815HOWELL SAND COMPANY, INC. +26.9%
Jul 23, 2025 6486-01-001 FY 26 Amarillo Area HMACRandall · Amarillo 2 of 2 $658,500 $625,000RK HALL, LLC +5.4%
Jul 1, 2025 0704-06-016 FM 94 @ DrawMotley · Childress 7 of 7 $3,386,966 $1,837,101STX CIVIL +84.4%
Jun 4, 2025 0168-07-043 US 60 RER HEREFORD CONCRETE EASTDeaf Smith · Amarillo 1 of 3 $44,993,689 $44,993,689 Won
May 1, 2025 0052-01-043 OV-US 70 Farwell to Bailey CCSJParmer · Lubbock 4 of 8 $31,366,142 $29,652,485A. L. HELMCAMP, INC. +5.8%
Apr 23, 2025 6482-28-001 FY 25-26 Dumas Area HMACHartley · Amarillo 3 of 3 $714,750 $625,000RK HALL, LLC +14.4%
Mar 5, 2025 0397-02-041 SH 152 Super 2Wheeler · Childress 4 of 6 $16,081,108 $14,172,579RK HALL, LLC +13.5%
Feb 6, 2025 0098-05-036 SH 6 FM 2534, S to SH 222Knox · Childress 5 of 5 $5,599,490 $4,478,136ZACK BURKETT CO. +25.0%
Dec 4, 2024 0052-05-046 OV-US 84 Ltlfld to HockleyLamb · Lubbock 3 of 6 $29,736,979 $25,868,924A. L. HELMCAMP, INC. +15.0%
Dec 3, 2024 0904-11-064 TP&W CANONCITA PROJECTRandall · Amarillo 5 of 5 $5,976,903 $4,199,123L A FULLER & SONS CONSTRUCT… +42.3%
Nov 6, 2024 0042-03-047 FY 25 US 287 OV ARMSTRONG COArmstrong · Amarillo 2 of 5 $20,517,262 $19,891,474DUININCK, INC. +3.1%
Aug 1, 2024 6469-91-001 FLEXIBLE BASERandall · Amarillo 3 of 3 $1,163,475 $999,165L A FULLER & SONS CONSTRUCT… +16.4%
Jul 9, 2024 6469-03-001 MILL AND INLAYCarson · Amarillo 1 of 2 $4,669,500 $4,669,500 Won
Jun 5, 2024 2614-01-024 INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TRandall · Amarillo 1 of 2 $28,487,051 $28,487,051 Won
Jun 5, 2024 0090-02-055 HIGHWAY IMPROVEMENTOldham · Amarillo 3 of 4 $17,134,054 $15,078,258KIEWIT INFRASTRUCTURE SOUTH… +13.6%
May 3, 2024 0066-04-083 HAZARD ELIMINATION & SAFETYMoore · Amarillo 2 of 3 $2,759,972 $2,231,728L A FULLER & SONS CONSTRUCT… +23.7%
May 2, 2024 0455-03-038 HIGHWAY IMPROVEMENTGray · Amarillo 2 of 3 $17,566,864 $17,457,097RK HALL, LLC +0.6%
Apr 4, 2024 0170-02-023 PREVENTIVE MAINTENANCELipscomb · Amarillo 2 of 4 $20,289,240 $19,475,601DUININCK, INC. +4.2%
Mar 5, 2024 6462-85-001 HOT MIXHartley · Amarillo 3 of 3 $688,500 $600,000BIG CREEK SAND & GRAVEL, IN… +14.8%
Feb 2, 2024 1727-02-024 REHABILITATE EXISTING ROADWAYMoore · Amarillo 1 of 3 $41,097,397 $41,097,397 Won
Feb 2, 2024 6462-58-001 TOTAL MAINTENANCEPotter · Amarillo 1 of 1 $6,977,100 $6,977,100 Won
Feb 1, 2024 0226-06-036 SUPER 2Castro · Lubbock 2 of 2 $59,421,540 $54,353,807DUININCK, INC. +9.3%
Feb 1, 2024 0449-01-024 WIDEN ROAD - ADD LANES AND SHOULDERSCollingsworth · Childress 1 of 3 $4,695,146 $4,695,146 Won
Jan 5, 2024 0043-04-083 HIGHWAY IMPROVEMENTHardeman · Childress 7 of 7 $11,068,031 $8,059,391DUININCK, INC. +37.3%
Jan 4, 2024 0168-05-043 HIGHWAY IMPROVEMENTDeaf Smith · Amarillo 2 of 6 $2,284,386 $1,956,451L A FULLER & SONS CONSTRUCT… +16.8%
Dec 5, 2023 0132-01-055 OVERLAYDickens · Childress 3 of 5 $11,799,347 $11,319,018A. L. HELMCAMP, INC. +4.2%
Dec 5, 2023 0067-01-087 CONSTRUCT PEDESTRIAN INFRASTRUCTURERandall · Amarillo 2 of 4 $10,257,567 $9,542,615TI-ZACK CONCRETE, INC. +7.5%
Nov 2, 2023 0455-02-031 HIGHWAY IMPROVEMENTCarson · Amarillo 3 of 4 $18,315,457 $16,474,504RK HALL, LLC +11.2%
Nov 2, 2023 6455-65-001 AGGREGATELamb · Lubbock 2 of 3 $98,340 $92,000WEST TEXAS PAVING, INC. +6.9%
Nov 2, 2023 6455-67-001 AGGREGATEHale · Lubbock 1 of 2 $399,280 $399,280 Won
Oct 16, 2023 6456-85-001 HOT MIXChildress · Childress 3 of 3 $300,000 $231,100ZACK BURKETT CO. +29.8%
Oct 5, 2023 0275-11-090 BRIDGE REPLACEMENTGray · Amarillo 1 of 3 $12,919,745 $12,919,745 Won
Oct 5, 2023 0105-02-023 OVERLAYHall · Childress 1 of 4 $6,639,790 $6,639,790 Won
Sep 7, 2023 0168-08-075 REHABILITATE EXISTING ROADWAYRandall · Amarillo 3 of 4 $39,697,800 $34,924,134DUININCK, INC. +13.7%
Sep 6, 2023 0042-06-076 HIGHWAY IMPROVEMENTDonley · Childress 1 of 5 $6,446,301 $6,446,301 Won
Aug 3, 2023 0275-04-069 TRANSPORTATION NON-ROADWAYCarson · Amarillo 1 of 4 $6,318,690 $6,318,690 Won
Aug 3, 2023 6446-84-001 FLEXIBLE BASERandall · Amarillo 2 of 3 $1,933,028 $1,816,522VOLCANIC STONE CO. +6.4%
May 5, 2023 0449-01-023 WIDEN ROAD - ADD LANES AND SHOULDERSCollingsworth · Childress 1 of 4 $7,122,577 $7,122,577 Won
Apr 5, 2023 0041-07-113 BRIDGE REPLACEMENTPotter · Amarillo 1 of 3 $11,665,732 $11,665,732 Won
Apr 5, 2023 6435-60-001 MILL AND INLAYCarson · Amarillo 1 of 2 $5,263,125 $5,263,125 Won
Mar 14, 2023 6397-72-001 HOT MIXRandall · Amarillo 4 of 4 $298,020 $265,490L A FULLER & SONS CONSTRUCT… +12.3%
Feb 2, 2023 0356-01-107 HIGHWAY IMPROVEMENTHutchinson · Amarillo 3 of 4 $9,849,820 $9,658,644RK HALL, LLC +2.0%
Feb 2, 2023 0030-06-060 BICYCLE AND PEDESTRIAN IMPROVEMENTSHemphill · Amarillo 2 of 3 $13,999,932 $13,405,600TI-ZACK CONCRETE, INC. +4.4%
Feb 1, 2023 1339-02-028 BRIDGE REPLACEMENTLipscomb · Amarillo 3 of 5 $12,203,647 $10,425,012COPPELL CONSTRUCTION CO., I… +17.1%
Jan 6, 2023 0168-07-050 REHABILITATE EXISTING ROADWAYDeaf Smith · Amarillo 2 of 4 $24,067,985 $23,784,486RK HALL, LLC +1.2%
Nov 3, 2022 0169-02-068 INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TPotter · Amarillo 2 of 3 $2,299,026 $2,207,755L A FULLER & SONS CONSTRUCT… +4.1%
Nov 2, 2022 0030-07-022 SURFACING/ROADWAY RESTORATIONHemphill · Amarillo 2 of 4 $5,594,278 $5,382,630DUININCK, INC. +3.9%
Oct 6, 2022 0557-02-019 SURFACING/ROADWAY RESTORATIONHutchinson · Amarillo 3 of 5 $7,534,006 $7,081,620DUININCK, INC. +6.4%
Sep 8, 2022 1245-02-050 PREVENTIVE MAINTENANCEPotter · Amarillo 4 of 5 $8,649,186 $7,909,237RK HALL, LLC +9.4%
Sep 7, 2022 0032-01-034 OVERLAYChildress · Childress 5 of 5 $8,418,212 $7,466,260RK HALL, LLC +12.8%
Sep 7, 2022 0453-04-024 REHABILIATIONCrosby · Lubbock 3 of 4 $27,359,903 $23,557,971DUININCK, INC. +16.1%
Aug 4, 2022 0704-02-022 WIDENING OF A NON-FREEWAY FACILITYChildress · Childress 6 of 6 $21,026,132 $17,182,341RK HALL, LLC +22.4%
Aug 4, 2022 1650-01-010 BRIDGE REPLACEMENTHall · Childress 5 of 5 $2,255,279 $1,575,474EARTH BUILDERS, L.P. +43.1%
Jun 30, 2022 0308-01-013 BRIDGE REPLACEMENTHansford · Amarillo 1 of 3 $7,907,130 $7,907,130 Won
Feb 4, 2022 1245-02-049 HIGHWAY IMPROVEMENTPotter · Amarillo 4 of 5 $13,807,257 $12,755,021KIEWIT INFRASTRUCTURE SOUTH… +8.2%
Feb 4, 2022 6382-50-001 HOT MIX ASPHALTIC CONCRETE ~ MATERIALS ONLYOchiltree · 3 of 3 $1,141,775 $928,000BIG CREEK SAND & GRAVEL, IN… +23.0%
Feb 4, 2022 6395-56-001 TOTAL MAINTENANCE ROADWAY REPAIRSPotter · Amarillo 1 of 2 $6,290,664 $6,290,664 Won
Feb 3, 2022 1245-01-019 HIGHWAY IMPROVEMENTOldham · Amarillo 3 of 4 $19,280,387 $18,084,714KIEWIT INFRASTRUCTURE SOUTH… +6.6%
Jan 7, 2022 0379-01-046 REHABILITATE EXISTING ROADWAYHutchinson · Amarillo 3 of 5 $9,896,007 $9,504,385DUININCK, INC. +4.1%
Jan 6, 2022 0030-01-035 HIGHWAY IMPROVEMENTOchiltree · 3 of 4 $6,974,304 $5,571,551DUININCK, INC. +25.2%
Jan 6, 2022 0238-04-038 HIGHWAY IMPROVEMENTDallam · Amarillo 2 of 3 $10,363,722 $8,285,085RK HALL, LLC +25.1%
Dec 2, 2021 1040-02-022 BRIDGE REPLACEMENTHall · Childress 6 of 7 $1,724,424 $1,177,468COPPELL CONSTRUCTION CO., I… +46.5%
Dec 1, 2021 0275-01-221 PREVENTIVE MAINTENANCEPotter · Amarillo 1 of 3 $13,120,890 $13,120,890 Won
Dec 1, 2021 0226-02-038 REHABILITATE EXISTING ROADWAYOldham · Amarillo 1 of 3 $9,766,080 $9,766,080 Won
Nov 3, 2021 0226-05-067 PREVENTIVE MAINTENANCEDeaf Smith · Amarillo 3 of 3 $6,467,744 $5,447,354RK HALL, LLC +18.7%
Oct 8, 2021 0168-05-041 PREVENTIVE MAINTENANCEDeaf Smith · Amarillo 5 of 5 $6,250,418 $5,275,867RK HALL, LLC +18.5%
Oct 7, 2021 1337-02-012 REHABILITATE EXISTING ROADWAYLipscomb · Amarillo 1 of 2 $7,414,244 $7,414,244 Won
Sep 1, 2021 0052-02-036 SURFACING/ROADWAY RESTORATIONBailey · Lubbock 4 of 4 $23,677,546 $18,113,896DUININCK, INC. +30.7%
Sep 1, 2021 0379-03-026 HAZARD ELIMINATION & SAFETYPotter · Amarillo 2 of 2 $7,061,086 $6,694,352GILVIN-TERRILL, LTD. +5.5%
Aug 17, 2021 6382-36-001 HOT MIXRandall · Amarillo 3 of 3 $360,720 $274,300RK HALL, LLC +31.5%
Aug 17, 2021 6382-37-001 HOT MIXOldham · Amarillo 3 of 3 $360,720 $274,300RK HALL, LLC +31.5%
Aug 17, 2021 6382-38-001 HOT MIXArmstrong · Amarillo 3 of 3 $360,720 $274,300RK HALL, LLC +31.5%
Aug 5, 2021 0168-07-047 HIGHWAY IMPROVEMENTDeaf Smith · Amarillo 1 of 2 $3,689,715 $3,689,715 Won
Aug 4, 2021 0169-07-053 HIGHWAY IMPROVEMENTGray · Amarillo 4 of 5 $17,836,168 $16,536,379RK HALL, LLC +7.9%
Aug 4, 2021 1480-02-036 INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TRandall · Amarillo 1 of 3 $5,305,311 $5,305,311 Won
Jul 20, 2021 6382-24-001 HOT MIXDallam · Amarillo 4 of 4 $360,720 $300,000L A FULLER & SONS CONSTRUCT… +20.2%
Jul 20, 2021 6382-25-001 HOT MIXDallam · Amarillo 3 of 3 $360,720 $300,000L A FULLER & SONS CONSTRUCT… +20.2%
Jul 20, 2021 6382-27-001 SEAL COATGray · Amarillo 2 of 3 $23,756 $20,400BIG CREEK SAND & GRAVEL, IN… +16.5%
Jul 20, 2021 6382-28-001 SEAL COATMoore · Amarillo 3 of 3 $26,441 $23,057VOLCANIC STONE CO. +14.7%
Jul 20, 2021 6382-59-001 SEAL COATArmstrong · Amarillo 2 of 2 $25,444 $24,566VOLCANIC STONE CO. +3.6%
Jul 1, 2021 0455-02-027 BRIDGE REPLACEMENTCarson · Amarillo 3 of 3 $9,061,957 $8,225,270GILVIN-TERRILL, LTD. +10.2%
Jul 1, 2021 0168-07-049 INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TDeaf Smith · Amarillo 4 of 4 $6,200,747 $5,647,434GILVIN-TERRILL, LTD. +9.8%
Jun 4, 2021 1861-02-024 BRIDGE REPLACEMENTGray · Amarillo 3 of 4 $4,162,986 $3,478,340INTEGRITY SERVICES, LLC +19.7%
Jun 4, 2021 0042-12-082 BRIDGE REPLACEMENTChildress · Childress 8 of 8 $3,172,082 $2,074,853CDM HOLDINGS, LLC +52.9%
Jun 4, 2021 2494-01-015 INTERSECTION IMPROVEMENTPotter · Amarillo 1 of 3 $2,407,612 $2,407,612 Won
Jun 3, 2021 0797-07-032 BRIDGE REPLACEMENTCollingsworth · Childress 6 of 8 $1,652,311 $954,519EARTH BUILDERS, L.P. +73.1%
May 6, 2021 0168-09-181 HIGHWAY IMPROVEMENTRandall · Amarillo 2 of 3 $34,542,703 $30,998,613ALLEN BUTLER CONSTRUCTION, … +11.4%
May 6, 2021 0042-09-124 A NEW LOCATION FREEWAY FACILITYHall · Childress 6 of 6 $16,008,127 $13,478,723CK NEWBERRY, LLC +18.8%
Apr 8, 2021 0066-05-065 HIGHWAY IMPROVEMENTMoore · Amarillo 3 of 3 $42,545,429 $36,800,374SEMA CONSTRUCTION, INC. +15.6%
Apr 8, 2021 0041-02-016 REHABILITATE EXISTING ROADWAYHartley · Amarillo 1 of 3 $9,656,579 $9,656,579 Won
Mar 5, 2021 2127-01-010 BRIDGE REPLACEMENTHutchinson · Amarillo 6 of 8 $4,017,159 $3,371,389GILVIN-TERRILL, LTD. +19.2%
Mar 4, 2021 0041-05-053 WIDEN ROAD - ADD LANES AND SHOULDERSPotter · Amarillo 1 of 2 $1,149,485 $1,149,485 Won
Feb 5, 2021 0168-08-073 INTERSECTION IMPROVEMENTSRandall · Amarillo 1 of 3 $4,103,044 $4,103,044 Won
Jan 8, 2021 0052-01-044 REHABILITATION OF EXISTING ROADWAYParmer · Lubbock 3 of 4 $3,648,500 $3,220,734GILVIN-TERRILL, LTD. +13.3%
Jan 7, 2021 0090-06-044 REPLACE EXISTING BRIDGESPotter · Amarillo 7 of 7 $7,037,270 $5,207,276INTEGRITY SERVICES, LLC +35.1%
Dec 2, 2020 2635-03-024 CONSTRUCT NEW ROADRandall · Amarillo 3 of 4 $33,006,734 $25,974,527ALLEN BUTLER CONSTRUCTION, … +27.1%
Nov 5, 2020 0146-04-029 ACP OVERLAYFoard · Childress 7 of 7 $7,738,944 $5,097,897DUININCK, INC. +51.8%
Nov 4, 2020 0397-01-045 HIGHWAY IMPROVEMENTGray · Amarillo 6 of 6 $17,907,359 $15,464,360RK HALL, LLC +15.8%
Nov 4, 2020 0043-04-082 MILL/INLAYHardeman · Childress 6 of 6 $2,764,510 $1,952,687A. L. HELMCAMP, INC. +41.6%
Oct 2, 2020 0042-08-058 OVERLAYDonley · Childress 1 of 3 $3,770,388 $3,770,388 Won
Oct 2, 2020 0168-09-165 ACP OVERLAY, PAVEMENT REPAIR, UPGRADE MBGFRandall · Amarillo 1 of 2 $6,336,099 $6,336,099 Won
Oct 2, 2020 6367-29-001 SUPPLY FLEXIBLE BASE (MATERIAL ONLY)Childress · Childress 5 of 5 $543,550 $344,290B & G ELECTRIC +57.9%
Sep 9, 2020 6367-68-001 FLEXIBLE BASE (MATERIALS ONLY)Carson · Amarillo 3 of 3 $38,400 $31,860L A FULLER & SONS CONSTRUCT… +20.5%
Sep 9, 2020 6367-69-001 FLEXIBLE BASE (MATERIALS ONLY)Hartley · Amarillo 1 of 2 $207,886 $207,886 Won
Sep 9, 2020 6367-70-001 FLEXIBLE BASE (MATERIALS ONLY)Potter · Amarillo 3 of 3 $99,180 $62,379L A FULLER & SONS CONSTRUCT… +59.0%
Sep 9, 2020 6367-71-001 FLEXIBLE BASE (MATERIALS ONLY)Dallam · Amarillo 3 of 3 $93,000 $67,119B & G ELECTRIC +38.6%
Sep 9, 2020 6367-72-001 FLEXIBLE BASE (MATERIALS ONLY)Moore · Amarillo 2 of 3 $84,000 $70,170B & G ELECTRIC +19.7%
Aug 24, 2020 6366-87-001 D-GR HMAC TY D (MATERIALS ONLY)Potter · Amarillo 3 of 3 $255,045 $197,650RK HALL, LLC +29.0%
Aug 24, 2020 6366-88-001 D-GRADE HMAC TY D (MATERIALS ONLY)Potter · Amarillo 3 of 3 $255,045 $197,650RK HALL, LLC +29.0%
Aug 24, 2020 6366-89-001 D-GR HMAC TYPE D (MATERIALS ONLY)Armstrong · Amarillo 3 of 3 $255,045 $197,650RK HALL, LLC +29.0%
Aug 24, 2020 6367-67-001 D-GR HMAC TY D (MATERIALS ONLY)Randall · Amarillo 3 of 3 $346,700 $243,035RK HALL, LLC +42.7%
Aug 6, 2020 0379-02-032 REHABILITATE EXISTING ROADWAYPotter · Amarillo 2 of 4 $9,367,148 $9,215,103KIEWIT INFRASTRUCTURE SOUTH… +1.6%
Jul 8, 2020 0133-03-038 SUPER 2Knox · Childress 6 of 6 $18,711,259 $12,684,228A. L. HELMCAMP, INC. +47.5%
Jun 5, 2020 0753-02-022 SFT - SAFETY IMPROVEMENT PROJECTSCarson · Amarillo 2 of 3 $1,065,140 $799,569L A FULLER & SONS CONSTRUCT… +33.2%
Jun 4, 2020 0042-06-074 MISCELLANOUS CONSTRUCTIONDonley · Childress 3 of 3 $5,482,265 $3,680,420L A FULLER & SONS CONSTRUCT… +49.0%
Apr 9, 2020 1819-01-015 ADDITIONAL PAVED SURFACE WIDTHLipscomb · Amarillo 1 of 3 $16,356,130 $16,356,130 Won
Apr 8, 2020 6357-75-001 D-GR HMA TY D PG 64-28 (MATERIALS ONLY)Hemphill · Amarillo 2 of 2 $911,000 $772,400L A FULLER & SONS CONSTRUCT… +17.9%
Mar 23, 2020 6358-27-001 FLEXIBLE BASE (MATERIALS ONLY)Hartley · Amarillo 1 of 3 $149,750 $149,750 Won
Mar 23, 2020 6358-24-001 DENSE-GRADE HOT-MIX ASPHALT(MATERIALS ONLY)Armstrong · Amarillo 4 of 4 $273,300 $212,250RK HALL, LLC +28.8%
Mar 5, 2020 6358-25-001 MOWING HIGHWAY ROW (URBAN)Potter · Amarillo 5 of 5 $697,945 $331,681ALL HANDS & DUKE, INC. +110.4%
Mar 4, 2020 0031-04-054 SUPER 2 - SUBGRADE WIDENING, STRUCTURES & ACPCollingsworth · Childress 6 of 6 $13,884,715 $11,250,761DUININCK, INC. +23.4%
Jan 10, 2020 6354-17-001 MISC ROADWAY REPAIRSPotter · Amarillo 1 of 1 $4,994,600 $4,994,600 Won
Dec 4, 2019 0042-04-043 2" ACP OVERLAY, PAVEMENT REPAIRArmstrong · Amarillo 2 of 5 $9,262,033 $8,973,976KIEWIT INFRASTRUCTURE SOUTH… +3.2%
Dec 3, 2019 0275-11-083 CRCP REPAIR, OVERLAY AND BRIDGE RAIL REPLACEMENT FGray · Amarillo 5 of 6 $12,263,643 $10,924,180GILVIN-TERRILL, LTD. +12.3%
Dec 3, 2019 0052-01-042 REHABILITATION OF EXISTING ROADWAYParmer · Lubbock 3 of 4 $18,840,807 $15,350,632JOHNSON BROS. CORPORATION, … +22.7%
Nov 5, 2019 0066-01-021 OVERLAY AND PAVEMENT REPAIRDallam · Amarillo 3 of 5 $12,246,482 $11,978,030RK HALL, LLC +2.2%
Oct 2, 2019 2635-01-038 OVERLAYPotter · Amarillo 2 of 4 $11,058,362 $10,715,637RK HALL, LLC +3.2%
Oct 2, 2019 2218-01-035 REPLACE BRIDGE AND APPROACHES, RELOCATE RAMPCarson · Amarillo 1 of 2 $5,732,296 $5,732,296 Won
Aug 6, 2019 0238-03-064 THICK OVERLAY AND PAVEMENT REPAIRDallam · Amarillo 2 of 4 $14,545,453 $14,364,734RK HALL, LLC +1.3%
Apr 3, 2019 0145-05-032 PAVEMENT REPAIR, LEVEL-UP, OVERLAYHale · Lubbock 2 of 2 $20,525,499 $18,510,115DUININCK, INC. +10.9%
Apr 2, 2019 0490-04-045 OVERLAYRoberts · 1 of 5 $23,349,234 $23,349,234 Won
Apr 2, 2019 0040-03-064 OVERLAYDallam · Amarillo 3 of 4 $17,751,122 $17,114,342RK HALL, LLC +3.7%
Apr 2, 2019 0486-01-032 SUPER 2Wheeler · Childress 3 of 4 $11,703,900 $9,862,939JCCC, INC. +18.7%
Mar 6, 2019 0168-01-030 REHABILITATION OF EXISTING ROADWAYParmer · Lubbock 3 of 3 $27,023,881 $25,525,378JOHNSON BROS. CORPORATION, … +5.9%
Mar 6, 2019 0097-02-039 REHABILITAION OF EXISTING ROADWAYHardeman · Childress 4 of 4 $5,694,317 $3,994,436JCCC, INC. +42.6%
Mar 5, 2019 0030-02-052 OVERLAYOchiltree · 1 of 7 $13,814,377 $13,814,377 Won
Feb 6, 2019 0169-05-041 REHAB EXISITNG ROADWAYCarson · Amarillo 3 of 3 $17,376,513 $16,325,738RK HALL, LLC +6.4%
Feb 6, 2019 0042-07-066 ASPHALTIC CONCRETE OVERLAYDonley · Childress 1 of 3 $4,527,707 $4,527,707 Won
Feb 5, 2019 0066-03-041 OVERLAYSherman · Amarillo 2 of 2 $17,128,332 $14,540,199RK HALL, LLC +17.8%
Jan 9, 2019 2635-05-001 B-2 PHASE I: CONSTRUCT FRT RDS FOR FUTURE FREEWAYRandall · Amarillo 3 of 3 $50,501,291 $45,797,691ALLEN BUTLER CONSTRUCTION, … +10.3%
Jan 9, 2019 0275-04-052 ACP OVERLAY,CRCP REPAIR, MBGF, AND STRIPING.Carson · Amarillo 2 of 5 $8,866,382 $8,012,745KIEWIT INFRASTRUCTURE SOUTH… +10.7%
Jan 8, 2019 0238-02-038 CONVERT TO SUPER 2 HIGHWAYHartley · Amarillo 1 of 5 $35,223,787 $35,223,787 Won
Jan 8, 2019 0090-05-098 SMA OVERLAY, MBGF, STRIPING, RUMBLE STRIPS.Potter · Amarillo 4 of 4 $8,416,560 $7,778,312RK HALL, LLC +8.2%
Dec 6, 2018 2635-02-035 OVERLAY, MILL FILL, CONC BARRIER, ADD TURN LANES.Randall · Amarillo 1 of 4 $10,708,978 $10,708,978 Won
Nov 6, 2018 0490-03-028 BASE REPAIR AND OVERLAYOchiltree · 1 of 5 $13,090,322 $13,090,322 Won
Nov 6, 2018 0145-11-011 REHABILIATIONFloyd · 5 of 5 $11,084,276 $9,844,110GILVIN-TERRILL, LTD. +12.6%
Oct 3, 2018 0169-03-036 EBL - FULL DEPTH REPAIR, MILL AND FILLCarson · Amarillo 2 of 6 $17,423,992 $16,196,034RK HALL, LLC +7.6%
Oct 2, 2018 0275-05-044 OVERLAYGray · Amarillo 2 of 5 $16,584,965 $16,401,397KIEWIT INFRASTRUCTURE SOUTH… +1.1%
Sep 7, 2018 0275-03-066 EBL - MILL, REHAB AND OVERLAYCarson · Amarillo 5 of 5 $17,473,429 $15,103,094GILVIN-TERRILL, LTD. +15.7%
Sep 7, 2018 0042-03-042 OVERLAYArmstrong · Amarillo 4 of 6 $7,375,540 $6,591,548KIEWIT INFRASTRUCTURE SOUTH… +11.9%
Aug 8, 2018 0146-01-051 REPLACEMENT OF EXISTING BRIDGE FACILITYMotley · Childress 4 of 5 $2,889,739 $2,119,656HODGES AND SON CONSTRUCTION… +36.3%
Jun 6, 2018 0169-08-024 THICK OVERLAY,JOINT REPAIR,MBGF,RUMBLE STRIPSRoberts · 1 of 5 $13,340,742 $13,340,742 Won
Jun 6, 2018 0042-07-067 REHABILITATION OF EXISTING ROADDonley · Childress 1 of 2 $7,991,426 $7,991,426 Won
Jun 6, 2018 0704-05-022 WIDENING OF NON-FREEWAY FACILITYMotley · Childress 2 of 4 $7,971,034 $7,493,681GILVIN-TERRILL, LTD. +6.4%
May 2, 2018 0040-01-050 OVERLAY,PVMT REPAIR,MBGF,RUMBLE STRIPS,STRIPINGDallam · Amarillo 4 of 6 $10,859,704 $10,092,336KIEWIT INFRASTRUCTURE SOUTH… +7.6%
May 1, 2018 0168-01-029 REHABILITATION OF EXISTING ROADWAYParmer · Lubbock 1 of 8 $17,450,676 $17,450,676 Won
Apr 4, 2018 0226-06-032 REHABILITATIONCastro · Lubbock 1 of 6 $15,741,047 $15,741,047 Won
Apr 4, 2018 0066-05-066 THICK OVERLAY,PAV REPAIR,SIGNS,BMGF,HSIP IMPROVEMoore · Amarillo 3 of 6 $11,347,787 $11,242,986HIGHWAY CONTRACTORS, INC. +0.9%
Apr 3, 2018 0227-06-024 REHABILITATIONHockley · Lubbock 4 of 5 $10,554,667 $7,499,584ALLEN BUTLER CONSTRUCTION, … +40.7%
Apr 3, 2018 6328-67-001 MOWING HIGHWAY ROW (URBAN)Potter · Amarillo 2 of 3 $715,695 $613,922ALL HANDS & DUKE, INC. +16.6%
Mar 7, 2018 0453-02-018 PAVEMENT REPAIR, LEVEL-UP, OVERLAYCrosby · Lubbock 3 of 4 $8,905,210 $8,589,408ALLEN BUTLER CONSTRUCTION, … +3.7%
Feb 2, 2018 0798-01-025 REPLACE EXISTING BRIDGE AND APPROACHESRoberts · 7 of 8 $2,802,855 $2,093,932STATELINE CONSTRUCTION, LLC +33.9%
Feb 2, 2018 0169-05-042 REHAB EXISTING ROADWAYCarson · Amarillo 4 of 6 $11,772,973 $10,873,603RK HALL, LLC +8.3%
Feb 1, 2018 0042-06-071 MISCELLANEOUS WORKDonley · Childress 3 of 5 $1,453,975 $1,185,395GILVIN-TERRILL, LTD. +22.7%
Feb 1, 2018 0904-13-024 REPLACE BRIDGE AND APPROACHESGray · Amarillo 6 of 6 $2,107,213 $1,525,326STATELINE CONSTRUCTION, LLC +38.1%
Dec 5, 2017 6324-63-001 MISC ROADWAY REPAIRSPotter · Amarillo 1 of 4 $4,503,545 $4,503,545 Won
Nov 2, 2017 0042-09-123 ASPHALTIC CONCRETE PAVEMENT OVERLAYHall · Childress 3 of 4 $4,408,792 $4,165,121RK HALL, LLC +5.9%
Nov 2, 2017 0090-05-097 INTERSECTION & SAFETY IMPROVEMENTS ADDING TRUN LNSPotter · Amarillo 1 of 5 $1,771,161 $1,771,161 Won
Oct 4, 2017 0169-04-036 FULL DEPTH RECLAMATION,PLANING,HOTMIX&PAV MARKINGSCarson · Amarillo 2 of 8 $11,217,249 $11,057,967RK HALL, LLC +1.4%
Sep 7, 2017 0031-03-042 REHABILITATION OF EXISTING ROADCollingsworth · Childress 1 of 5 $4,173,324 $4,173,324 Won
Jul 12, 2017 2635-03-018 CONSTRUCT INTERCHANGE,MAINLANES AND FRT ROADSRandall · Amarillo 2 of 4 $51,335,927 $42,375,492ALLEN BUTLER CONSTRUCTION, … +21.1%
Jul 11, 2017 0925-09-035 THE REPLACEMENT OF A BRIDGE FACILITYHall · Childress 7 of 8 $778,752 $557,176REECE CONSTRUCTION CO., INC. +39.8%
Jun 6, 2017 0090-05-099 BRIDGE REPLACEMENTPotter · Amarillo 1 of 5 $1,333,511 $1,333,511 Won
Apr 5, 2017 0068-13-003 SMA OVERLAYLynn · Lubbock 3 of 4 $955,804 $754,510ALLEN BUTLER CONSTRUCTION, … +26.7%
Apr 5, 2017 0275-01-187 REPLACE BRIDGES,FRT RD IMPROVE,REHAB TRAF SIGNALSPotter · Amarillo 5 of 5 $9,008,871 $7,472,230GILVIN-TERRILL, LTD. +20.6%
Apr 4, 2017 0052-07-070 MILL AND INLAYLubbock · Lubbock 4 of 4 $7,075,503 $5,963,457FNF CONSTRUCTION, INC. +18.6%
Apr 4, 2017 6313-53-001 MISC ROADWAY REPAIRSPotter · Amarillo 1 of 3 $2,347,860 $2,347,860 Won
Mar 7, 2017 0275-12-072 BRIDGE REPLACMENTWheeler · Childress 2 of 7 $3,058,870 $2,923,331COPPELL CONSTRUCTION CO., I… +4.6%
Feb 3, 2017 0275-01-163 OVERLAYPotter · Amarillo 1 of 4 $6,982,390 $6,982,390 Won
Feb 2, 2017 0030-02-044 REHAB EXISTING ROADWAYOchiltree · 1 of 5 $2,999,164 $2,999,164 Won
Jan 5, 2017 0068-01-069 MILL, HOTMIX INLAYLubbock · Lubbock 7 of 8 $9,232,968 $7,340,564ALLEN BUTLER CONSTRUCTION, … +25.8%
Dec 1, 2016 0131-06-053 INSTALL LED STOP SIGN/DECEL LANE/ILLUMINAIREDickens · Childress 2 of 3 $230,940 $171,971OPPORTUNITY EXCAVATION/CONC… +34.3%
Jun 13, 2014 6266-82-001 WIDENING EXISTING ROADWAYHemphill · Amarillo 1 of 2 $528,754 $528,754 Won
Nov 6, 2013 0238-05-039 REHAB EXIST RDWY & ADD PASSING LANESSherman · Amarillo 1 of 3 $3,184,353 $3,184,353 Won
Nov 5, 2013 2078-02-007 REPLACE BRIDGE AND APPROACHESLipscomb · Amarillo 1 of 3 $1,605,360 $1,605,360 Won
Nov 5, 2013 0925-12-014 REPAIR DRAINAGE FACILITIES WITHINBriscoe · Childress 7 of 8 $317,474 $162,224OMEGA CONSTRUCTION GROUP, L… +95.7%
Nov 5, 2013 0453-06-011 WIDENING OF NON-FREEWAY FACILITYBriscoe · Childress 3 of 4 $4,350,379 $4,243,801RK HALL, LLC +2.5%
Oct 9, 2013 0042-06-067 ASPHALTIC CONCRETE PAVEMENT OVERLAYDonley · Childress 1 of 3 $2,248,103 $2,248,103 Won
Oct 9, 2013 0800-04-009 REHABILITATION OF ROADWAYCrosby · Lubbock 4 of 4 $3,208,436 $2,664,168GILVIN-TERRILL, LTD. +20.4%
Oct 8, 2013 0043-02-071 ASPHALTIC CONCRETE PAVEMENT OVERLAYHardeman · Childress 2 of 5 $1,504,708 $1,474,833ZACK BURKETT CO. +2.0%
Oct 8, 2013 0582-02-018 RESTORING SHOULDERS AND MINOR SAFETY UPGRADELipscomb · Amarillo 3 of 3 $9,147,050 $7,694,756RK HALL, LLC +18.9%
Oct 8, 2013 2444-01-009 REHABILITATION OF EXISTING ROADParmer · Lubbock 2 of 3 $4,095,885 $3,262,224GILVIN-TERRILL, LTD. +25.6%
Oct 8, 2013 2182-02-008 REHABILITATION OF EXISTING ROADHockley · Lubbock 2 of 3 $4,554,795 $3,762,235ALLEN BUTLER CONSTRUCTION, … +21.1%
Sep 11, 2013 0052-03-029 MILL, CEMENT STABILIZE, TY B HOTMIX, SMABailey · Lubbock 3 of 5 $16,788,241 $15,399,876DUININCK, INC. +9.0%
Sep 11, 2013 2419-01-010 WIDEN, SALVAGE BASE, BASE, 2 CSTCastro · Lubbock 1 of 3 $1,987,950 $1,987,950 Won
Sep 11, 2013 0534-01-019 REPLACE CONCRETE WATER CROSSINGSRandall · Amarillo 2 of 3 $4,136,600 $3,956,849DCI CONTRACTING, INC. +4.5%

Active prime contracts 5

CCSJWhereWorkContractCompleteReport
0168-07-043Let Jun 4, 2025 Deaf SmithAmarillo · US 60 REHABILITATION OF EXISTING ROAD$45,199,631 16% PDF
0238-03-061Let Oct 1, 2024 DallamAmarillo · US 54 REHABILITATION OF EXISTING ROAD$26,623,978 70% PDF
2614-01-024Let Jun 5, 2024 RandallAmarillo · FM 2590 HAZARD ELIMINATION & SAFETY$28,568,456 59% PDF
1727-02-024Let Feb 2, 2024 MooreAmarillo · FM 281 WIDEN FREEWAY$41,423,505 101% PDF
6462-58-001Let Feb 2, 2024 PotterAmarillo · IH0040 MAINTENANCE$10,007,611 57% PDF

Subcontracts on active jobs 4

CCSJPrime contractorWhereWorkShareValue (est.)
2635-02-038Let Jul 9, 2024 L A FULLER & SONS CONSTRUCTION, LTD. RandallAmarilloHAZARD ELIMINATION & SAFETY 25.36%$1,769,025
0168-09-083Let Feb 1, 2024 WEBBER, LLC RandallAmarilloWIDEN FREEWAY 27.3%$85,931,546
0168-02-032Let Oct 5, 2023 WEBBER, LLC ParmerLubbockBRIDGE WIDENING OR REHABILITATION 28.97%$21,199,861
2635-04-031Let Dec 1, 2022 WEBBER, LLC PotterAmarilloMISCELLANEOUS CONSTRUCTION 29.45%$40,033,154