Bid tab 1245-02-050

Let Sep 8, 2022 · Amarillo · Potter Sign up free

‹ Sep 2022 results

PREVENTIVE MAINTENANCE

Let date
Thursday, September 8, 2022
CCSJ
1245-02-050
District
Amarillo
County
Potter
Highway
RM 1061
Limits
RM 2381 to TO 10.5 MILES NORTH
Classification
Construction
Project number
F 2023(053)
Working days
79

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$7,835,330
1 RK HALL, LLC Low bidder $7,909,237 +0.9%
2 DUININCK, INC. $8,332,385 +6.3% +5.4%
3 GILVIN-TERRILL, LTD. $8,563,708 +9.3% +8.3%
4 J. LEE MILLIGAN, INC. $8,649,186 +10.4% +9.4%
5 KIEWIT INFRASTRUCTURE SOUTH CO. $9,652,784 +23.2% +22.0%

Bid tab: unit prices 46 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 RK HALL, LLC#2 DUININCK, INC.#3 GILVIN-TERRILL,…#4 J. LEE MILLIGAN…#5 KIEWIT INFRASTR…
1100-6001 PREPARING ROW24.77AC $200.00 $278.29 $105.00 $500.00 $490.00 $369.50
2104-6054 REMOVING CONCRETE(MOW STRIP)4,455LF $9.00 $15.90 $5.15 $5.00 $8.55 $5.07
3134-6001 BACKFILL (TY A)542STA $200.00 $259.54 $340.00 $250.00 $265.00 $288.77
4164-6042 DRILL SEEDING (TEMP) (WARM)24.86AC $600.00 $441.30 $440.00 $450.00 $580.00 $704.08
5314-6009 EMULS ASPH (EROSN CONT)(MULTI)12,040GAL $4.00 $4.00 $3.90 $5.00 $5.00 $5.95
6351-6012 FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")7,470SY $21.00 $20.91 $26.50 $30.00 $31.45 $30.92
7354-6179 PLANE ASPH CONC PAV (0"-2.75")3,272SY $5.00 $4.94 $5.65 $5.00 $5.00 $3.84
8432-6045 RIPRAP (MOW STRIP)(4 IN)58CY $750.00 $1,272.00 $845.00 $800.00 $740.00 $1,126.52
9500-6001 MOBILIZATION1LS $650,000.00 $197,730.93 $480,000.00 $850,000.00 $859,000.00 $959,761.79
10502-6001 BARRICADES, SIGNS AND TRAFFIC HANDLING5MO $21,000.00 $9,894.29 $25,500.00 $19,200.00 $22,350.00 $35,000.00
11530-6002 INTERSECTIONS (ACP)892SY $75.00 $25.96 $29.50 $65.00 $58.25 $72.79
12533-6001 RUMBLE STRIPS (SHOULDER)107,560LF $0.3000 $0.1600 $0.1000 $0.3000 $0.2500 $0.1000
13533-6002 RUMBLE STRIPS (CENTERLINE)53,780LF $0.3000 $0.1800 $0.1500 $0.3000 $0.3000 $0.1000
14540-6002 MTL W-BEAM GD FEN (STEEL POST)3,075LF $45.00 $37.10 $38.00 $35.00 $37.20 $39.43
15540-6006 MTL BEAM GD FEN TRANS (THRIE-BEAM)8EA $4,000.00 $3,299.81 $2,800.00 $2,675.00 $4,000.00 $3,013.44
16540-6033 MTL BM GD FEN (LONG SPAN SYSTEM)2EA $2,500.00 $1,590.00 $1,500.00 $1,500.00 $1,700.00 $1,689.78
17542-6001 REMOVE METAL BEAM GUARD FENCE2,595LF $5.00 $4.24 $2.65 $4.00 $3.15 $4.51
18542-6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM)8EA $300.00 $424.00 $265.00 $400.00 $315.00 $450.61
19544-6001 GUARDRAIL END TREATMENT (INSTALL)24EA $4,200.00 $3,312.50 $3,300.00 $3,125.00 $3,700.00 $3,520.38
20544-6003 GUARDRAIL END TREATMENT (REMOVE)24EA $500.00 $424.00 $265.00 $400.00 $315.00 $450.61
21644-6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P)41EA $850.00 $832.10 $675.00 $820.00 $1,055.00 $884.32
22644-6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T)11EA $1,100.00 $1,018.66 $830.00 $37.00 $1,185.00 $1,082.59
23644-6076 REMOVE SM RD SN SUP&AM14EA $130.00 $134.48 $21.00 $110.00 $110.00 $168.98
24658-6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB12EA $16.00 $36.04 $21.00 $34.00 $21.10 $38.30
25658-6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF257EA $50.00 $47.70 $38.50 $45.00 $44.85 $50.69
26658-6100 INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)24EA $160.00 $128.26 $185.00 $145.00 $163.50 $136.31
27662-6001 WK ZN PAV MRK NON-REMOV (W)4"(BRK)5,760LF $0.2500 $0.2100 $0.2100 $0.2000 $0.2100 $0.2300
28662-6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK)6,805LF $0.2500 $0.2100 $0.2100 $0.2000 $0.2100 $0.2300
29662-6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD)85,180LF $0.2500 $0.1800 $0.1800 $0.1700 $0.1800 $0.1900
30662-6109 WK ZN PAV MRK SHT TERM (TAB)TY W3,179EA $1.50 $1.29 $1.05 $1.00 $1.60 $2.25
31662-6110 WK ZN PAV MRK SHT TERM (TAB)TY Y12,612EA $1.50 $1.29 $1.05 $1.00 $1.65 $2.25
32666-6005 REFL PAV MRK TY I (W)4"(DOT)(090MIL)285LF $0.5000 $1.06 $1.05 $1.00 $1.05 $1.13
33672-6007 REFL PAV MRKR TY I-C290EA $3.25 $6.36 $6.30 $6.00 $6.35 $6.76
34672-6009 REFL PAV MRKR TY II-A-A1,411EA $3.25 $5.30 $5.25 $5.00 $5.25 $5.63
353057-6001 REINFORMT GRID FOR ASPHALT PVMT OVERLAY188,864SY $7.00 $8.06 $8.00 $8.00 $8.00 $8.73
363076-6058 D-GR HMA TY-F SAC-A PG70-229,144TON $140.00 $137.23 $145.00 $135.00 $135.00 $170.49
373076-6066 TACK COAT28,817GAL $5.50 $4.39 $3.40 $4.50 $4.75 $4.97
383077-6058 SP MIXES SP-D SAC-A PG70-2824,430TON $122.00 $137.03 $141.60 $140.00 $134.75 $148.38
393077-6075 TACK COAT39,620GAL $5.50 $7.49 $7.20 $4.50 $7.40 $7.14
406001-6002 PORTABLE CHANGEABLE MESSAGE SIGN2EA $15,000.00 $24,837.80 $10,500.00 $20,000.00 $16,500.00 $24,383.72
416024-6002 HPPM W/RET REQ TY I(W)4"(BRK)(090MIL)5,760LF $0.6000 $0.5100 $0.5100 $0.4800 $0.5000 $0.5400
426024-6005 HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)108,354LF $0.5000 $0.4600 $0.4500 $0.4300 $0.4500 $0.4800
436024-6014 HPPM W/RET REQ TY I(Y)4"(BRK)(090MIL)6,805LF $0.6000 $0.5100 $0.5100 $0.4800 $0.5000 $0.5400
446024-6017 HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)85,180LF $0.5000 $0.4600 $0.4500 $0.4300 $0.4500 $0.4800
456185-6002 TMA (STATIONARY)83DAY $200.00 $446.49 $210.00 $670.00 $515.00 $606.39
466185-6003 TMA (MOBILE OPERATION)110HR $80.00 $82.22 $95.00 $95.00 $86.00 $107.35