| 1 | 104-2028 |
REMOVING CONC (MISC) | 44 | SY |
$18.00 |
$30.00 |
$24.10 |
$253.12 |
| 2 | 112-2002 |
SUBGRADE WIDENING (DENS CONT) | 307.44 | STA |
$700.00 |
$575.00 |
$375.00 |
$1,078.87 |
| 3 | 134-2002 |
BACKFILL (TY B) | 354.7 | STA |
$100.00 |
$100.00 |
$116.25 |
$100.74 |
| 4 | 150-2001 |
BLADING | 354.7 | STA |
$100.00 |
$50.00 |
$76.30 |
$16.68 |
| 5 | 216-2001 |
PROOF ROLLING | 40 | HR |
$70.00 |
$75.00 |
$95.45 |
$150.00 |
| 6 | 247-2310 |
FL BS (CMP IN PLC)(TY A GR 4)(4.5") | 110,210.6 | SY |
$6.50 |
$7.00 |
$8.80 |
$9.75 |
| 7 | 251-2085 |
REWRK BSE MATL (TY B)(7")(ORD COMP) | 9,522.3 | SY |
$5.00 |
$7.00 |
$3.55 |
$3.79 |
| 8 | 260-2001 |
LIME (HYDRATED LIME (DRY)) | 482.2 | TON |
$200.00 |
$175.00 |
$189.00 |
$210.38 |
| 9 | 260-2026 |
LIME TRT (EXIST MATL)(24") | 14,283.4 | SY |
$6.00 |
$7.00 |
$16.55 |
$27.98 |
| 10 | 275-2001 |
CEMENT | 722.7 | TON |
$150.00 |
$135.00 |
$141.25 |
$157.09 |
| 11 | 275-2098 |
CEMENT TREAT (EXST MATL)(4.5")(DC) | 114,135.2 | SY |
$2.00 |
$2.70 |
$3.05 |
$4.37 |
| 12 | 310-2001 |
PRIME COAT (MC-30) | 21,261 | GAL |
$4.50 |
$4.20 |
$4.35 |
$7.34 |
| 13 | 314-2013 |
EMULS ASPH (EROSN CONT)(CSS-1H) | 17,421 | GAL |
$4.00 |
$2.75 |
$3.00 |
$3.13 |
| 14 | 315-2004 |
FOG SEAL (CSS-1H) | 9,442 | GAL |
$4.00 |
$2.75 |
$3.00 |
$3.33 |
| 15 | 316-2006 |
ASPH (AC-20-5TR) | 90,336 | GAL |
$3.80 |
$3.70 |
$4.45 |
$3.89 |
| 16 | 316-2221 |
AGGR(TY-PB GR-3 SAC-B) | 1,286.4 | CY |
$85.00 |
$87.25 |
$143.40 |
$194.57 |
| 17 | 316-2223 |
AGGR(TY-PB GR-4 SAC-B) | 999.2 | CY |
$95.00 |
$87.25 |
$121.55 |
$174.34 |
| 18 | 316-2508 |
ASPH (AC-12-5TR) | 10,000 | GAL |
$3.80 |
$3.70 |
$1.00 |
$3.89 |
| 19 | 400-2005 |
CEM STABIL BKFL | 37 | CY |
$300.00 |
$300.00 |
$194.20 |
$207.54 |
| 20 | 432-2038 |
RIPRAP (CONC) (CL A ) | 8.6 | CY |
$500.00 |
$600.00 |
$535.00 |
$583.80 |
| 21 | 460-2015 |
CMP AR (GAL STL DES 3) | 30 | LF |
$150.00 |
$250.00 |
$77.70 |
$113.24 |
| 22 | 464-2005 |
RC PIPE (CL III)(24 IN) | 73 | LF |
$200.00 |
$250.00 |
$277.00 |
$174.94 |
| 23 | 464-2007 |
RC PIPE (CL III)(30 IN) | 66 | LF |
$250.00 |
$275.00 |
$330.00 |
$243.82 |
| 24 | 464-2009 |
RC PIPE (CL III)(36 IN) | 21 | LF |
$275.00 |
$300.00 |
$461.00 |
$349.56 |
| 25 | 467-2224 |
SET (TY II)(24 IN)(RCP)(4:1)(C) | 10 | EA |
$1,500.00 |
$1,500.00 |
$1,810.00 |
$4,354.16 |
| 26 | 467-2225 |
SET (TY II)(30 IN)(RCP)(4:1)(C) | 16 | EA |
$2,000.00 |
$1,750.00 |
$2,680.00 |
$4,819.04 |
| 27 | 467-2227 |
SET (TY II)(36 IN)(RCP)(4:1)(C) | 6 | EA |
$2,500.00 |
$2,500.00 |
$3,400.00 |
$5,693.03 |
| 28 | 467-2288 |
SET (TY II)(24 IN)(RCP)(6:1)(P) | 14 | EA |
$1,500.00 |
$1,600.00 |
$1,980.00 |
$2,925.70 |
| 29 | 467-2305 |
SET (TY II)(30 IN)(CMP)(6:1)(P) | 4 | EA |
$2,000.00 |
$2,000.00 |
$1,300.00 |
$1,751.38 |
| 30 | 467-2337 |
SET (TY II)(DES 3)(CMP)(6:1)(P) | 6 | EA |
$1,500.00 |
$2,000.00 |
$1,165.00 |
$4,691.12 |
| 31 | 480-2001 |
CLEAN EXIST CULVS | 5 | EA |
$1,000.00 |
$1,000.00 |
$2,280.00 |
$2,276.29 |
| 32 | 496-2016 |
REMOV STR (PIPE) | 3 | EA |
$1,000.00 |
$1,200.00 |
$725.00 |
$5,396.94 |
| 33 | 500-2001 |
MOBILIZATION | 1 | LS |
$295,000.00 |
$320,000.00 |
$405,200.00 |
$450,000.00 |
| 34 | 502-2001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 | MO |
$6,000.00 |
$8,800.00 |
$31,860.00 |
$35,000.00 |
| 35 | 530-2011 |
DRIVEWAYS (ACP) | 942 | SY |
$40.00 |
$51.00 |
$54.45 |
$50.11 |
| 36 | 530-2017 |
TURNOUTS (ACP) | 1,024 | SY |
$75.00 |
$72.00 |
$64.00 |
$93.53 |
| 37 | 530-2018 |
TURNOUTS (SURF TREAT) | 518 | SY |
$50.00 |
$20.00 |
$46.00 |
$141.88 |
| 38 | 560-2019 |
MAILBOX INSTALL-S(WC-POST)TY 3FND-AB | 14 | EA |
$300.00 |
$90.00 |
$300.00 |
$241.15 |
| 39 | 644-2056 |
RELOCATE SM RD SN SUP & AM TY 10BWG | 18 | EA |
$350.00 |
$200.00 |
$360.00 |
$512.46 |
| 40 | 658-2329 |
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND | 91 | EA |
$70.00 |
$60.00 |
$105.00 |
$120.58 |
| 41 | 658-2337 |
INSTL OM ASSM (OM-2Z)(FLX)GND(BI) | 34 | EA |
$70.00 |
$60.00 |
$110.00 |
$120.58 |
| 42 | 662-2030 |
WK ZN PAV MRK NON-REMOV (Y) 4" (BRK) | 7,641 | LF |
$0.3000 |
$0.1400 |
$0.1500 |
$0.2800 |
| 43 | 662-2032 |
WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) | 50,394 | LF |
$0.3000 |
$0.1400 |
$0.1500 |
$0.2800 |
| 44 | 662-2054 |
WK ZN PAV MRK REMOV (REFL) TY II-A-A | 578 | EA |
$3.25 |
$3.00 |
$3.15 |
$3.50 |
| 45 | 662-2067 |
WK ZN PAV MRK REMOV (W) 4" (SLD) | 1,200 | LF |
$1.50 |
$2.70 |
$2.85 |
$0.5800 |
| 46 | 662-2079 |
WK ZN PAV MRK REMOV (W) 24" (SLD) | 120 | LF |
$10.00 |
$16.00 |
$16.80 |
$17.52 |
| 47 | 662-2115 |
WK ZN PAV MRK SHT TERM (TAB) TY Y-2 | 3,800 | EA |
$1.00 |
$1.00 |
$1.00 |
$0.4500 |
| 48 | 668-2105 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 33 | LF |
$12.00 |
$16.00 |
$16.80 |
$12.84 |
| 49 | 677-2001 |
ELIM EXT PAV MRK & MRKS ( 4") | 6,801 | LF |
$0.6000 |
$0.6000 |
$1.40 |
$0.4700 |
| 50 | 681-2001 |
TEMP TRAF SIGNALS | 12 | EA |
$8,000.00 |
$2,000.00 |
$3,115.00 |
$10,000.00 |
| 51 | 730-2002 |
FULL-WIDTH MOWING | 146.6 | AC |
$65.00 |
$100.00 |
$80.00 |
$111.51 |
| 52 | 760-2001 |
DITCH CLEANING AND RESHAPING (FOOT) | 3,600 | LF |
$5.00 |
$1.50 |
$2.65 |
$7.56 |
| 53 | 1122-2016 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 100 | SY |
$16.00 |
$51.00 |
$33.65 |
$21.27 |
| 54 | 1122-2019 |
CONSTRUCTION EXITS (REMOVE) | 100 | SY |
$7.00 |
$25.50 |
$7.00 |
$9.00 |
| 55 | 1122-2031 |
SANDBAGS FOR EROSION CONTROL | 1,930 | EA |
$7.00 |
$6.00 |
$11.00 |
$10.84 |
| 56 | 1122-2037 |
TEMPORARY SEDIMENT CONTROL FENCE INSTLL | 2,000 | LF |
$2.00 |
$4.00 |
$4.40 |
$3.09 |
| 57 | 1122-2057 |
TEMPORARY SEDIMENT CONTROL FENCE REMOVE | 2,000 | LF |
$0.5000 |
$1.00 |
$1.60 |
$1.05 |
| 58 | 8251-2006 |
RE PM W/RET REQ TY I(W)4"(SLD)(100MIL) | 70,768 | LF |
$0.3500 |
$0.4900 |
$0.5100 |
$0.4400 |
| 59 | 8251-2015 |
RE PM W/RET REQ TY I(Y)4"(BRK)(100MIL) | 7,205 | LF |
$0.3500 |
$0.4900 |
$0.5100 |
$0.4200 |
| 60 | 8251-2018 |
RE PM W/RET REQ TY I(Y)4"(SLD)(100MIL) | 24,054 | LF |
$0.3500 |
$0.4900 |
$0.5100 |
$0.4200 |
| 61 | 318-2418 |
A-R BINDER (TYPE V) | 90,336 | GAL |
$3.80 |
|
|
|
| 62 | 318-2419 |
A-R BINDER (TYPE IV) | 90,336 | GAL |
$3.80 |
|
|
|