| 1 | 104-2028 |
REMOVING CONC (MISC) | 20 | SY |
$18.00 |
$90.00 |
$155.00 |
$285.90 |
| 2 | 112-2002 |
SUBGRADE WIDENING (DENS CONT) | 344.7 | STA |
$900.00 |
$462.03 |
$242.80 |
$992.25 |
| 3 | 132-2006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 3,350 | CY |
$8.00 |
$28.00 |
$20.15 |
$14.61 |
| 4 | 134-2002 |
BACKFILL (TY B) | 344.7 | STA |
$100.00 |
$200.00 |
$122.20 |
$64.51 |
| 5 | 150-2001 |
BLADING | 344.7 | STA |
$80.00 |
$200.00 |
$77.50 |
$49.31 |
| 6 | 216-2001 |
PROOF ROLLING | 40 | HR |
$80.00 |
$200.00 |
$105.00 |
$150.00 |
| 7 | 247-2064 |
FL BS (CMP IN PLC)(TY A GR 4) (6") | 114,666.7 | SY |
$8.00 |
$9.97 |
$12.10 |
$12.37 |
| 8 | 275-2001 |
CEMENT | 750 | TON |
$160.00 |
$128.98 |
$133.65 |
$153.95 |
| 9 | 275-2098 |
CEMENT TREAT (EXST MATL)(4.5")(DC) | 118,480.7 | SY |
$2.10 |
$2.76 |
$3.60 |
$4.13 |
| 10 | 310-2001 |
PRIME COAT (MC-30) | 22,928 | GAL |
$4.60 |
$4.58 |
$4.80 |
$7.44 |
| 11 | 314-2013 |
EMULS ASPH (EROSN CONT)(CSS-1H) | 14,939 | GAL |
$4.00 |
$4.73 |
$3.40 |
$3.23 |
| 12 | 315-2004 |
FOG SEAL (CSS-1H) | 10,528 | GAL |
$4.00 |
$5.41 |
$3.40 |
$3.33 |
| 13 | 316-2006 |
ASPH (AC-20-5TR) | 100,749 | GAL |
$4.00 |
$3.82 |
$4.70 |
$4.00 |
| 14 | 316-2221 |
AGGR(TY-PB GR-3 SAC-B) | 1,434.3 | CY |
$90.00 |
$119.63 |
$146.80 |
$186.59 |
| 15 | 316-2223 |
AGGR(TY-PB GR-4 SAC-B) | 1,114.2 | CY |
$95.00 |
$132.58 |
$147.30 |
$168.68 |
| 16 | 316-2508 |
ASPH (AC-12-5TR) | 10,000 | GAL |
$4.00 |
$0.6690 |
$1.00 |
$4.00 |
| 17 | 400-2005 |
CEM STABIL BKFL | 34.4 | CY |
$300.00 |
$150.00 |
$395.00 |
$216.99 |
| 18 | 432-2038 |
RIPRAP (CONC) (CL A ) | 5 | CY |
$500.00 |
$250.00 |
$950.00 |
$604.82 |
| 19 | 464-2005 |
RC PIPE (CL III)(24 IN) | 180 | LF |
$200.00 |
$300.00 |
$330.00 |
$154.15 |
| 20 | 464-2007 |
RC PIPE (CL III)(30 IN) | 20 | LF |
$250.00 |
$314.30 |
$425.00 |
$251.12 |
| 21 | 467-2224 |
SET (TY II)(24 IN)(RCP)(4:1)(C) | 28 | EA |
$1,500.00 |
$1,500.00 |
$2,030.00 |
$4,624.52 |
| 22 | 467-2225 |
SET (TY II)(30 IN)(RCP)(4:1)(C) | 4 | EA |
$2,000.00 |
$2,545.20 |
$3,000.00 |
$4,958.15 |
| 23 | 480-2001 |
CLEAN EXIST CULVS | 9 | EA |
$1,500.00 |
$2,000.00 |
$2,475.00 |
$1,512.27 |
| 24 | 500-2001 |
MOBILIZATION | 1 | LS |
$300,000.00 |
$381,150.19 |
$450,000.00 |
$447,278.00 |
| 25 | 502-2001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 | MO |
$6,000.00 |
$2,860.00 |
$44,115.00 |
$35,000.00 |
| 26 | 530-2011 |
DRIVEWAYS (ACP) | 1,252 | SY |
$40.00 |
$46.13 |
$57.55 |
$52.08 |
| 27 | 530-2017 |
TURNOUTS (ACP) | 956 | SY |
$75.00 |
$59.10 |
$68.40 |
$117.08 |
| 28 | 530-2018 |
TURNOUTS (SURF TREAT) | 152 | SY |
$50.00 |
$60.00 |
$93.00 |
$152.43 |
| 29 | 560-2019 |
MAILBOX INSTALL-S(WC-POST)TY 3FND-AB | 6 | EA |
$300.00 |
$550.00 |
$327.25 |
$201.42 |
| 30 | 644-2056 |
RELOCATE SM RD SN SUP & AM TY 10BWG | 10 | EA |
$350.00 |
$550.00 |
$400.00 |
$635.06 |
| 31 | 658-2329 |
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND | 26 | EA |
$60.00 |
$110.00 |
$125.00 |
$132.59 |
| 32 | 658-2337 |
INSTL OM ASSM (OM-2Z)(FLX)GND(BI) | 18 | EA |
$60.00 |
$110.00 |
$128.00 |
$137.76 |
| 33 | 662-2030 |
WK ZN PAV MRK NON-REMOV (Y) 4" (BRK) | 15,788 | LF |
$0.2500 |
$0.1760 |
$0.1700 |
$0.1900 |
| 34 | 662-2032 |
WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) | 40,606 | LF |
$0.2500 |
$0.1760 |
$0.1700 |
$0.1900 |
| 35 | 662-2115 |
WK ZN PAV MRK SHT TERM (TAB) TY Y-2 | 1,740 | EA |
$1.00 |
$1.44 |
$1.00 |
$0.4800 |
| 36 | 668-2105 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 36 | LF |
$10.00 |
$13.20 |
$12.60 |
$14.52 |
| 37 | 730-2002 |
FULL-WIDTH MOWING | 142.5 | AC |
$65.00 |
$75.00 |
$90.00 |
$118.66 |
| 38 | 760-2001 |
DITCH CLEANING AND RESHAPING (FOOT) | 36,000 | LF |
$3.00 |
$1.75 |
$1.40 |
$1.74 |
| 39 | 1122-2016 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 100 | SY |
$16.00 |
$25.00 |
$50.00 |
$22.04 |
| 40 | 1122-2019 |
CONSTRUCTION EXITS (REMOVE) | 100 | SY |
$7.00 |
$12.00 |
$7.50 |
$9.32 |
| 41 | 1122-2031 |
SANDBAGS FOR EROSION CONTROL | 2,210 | EA |
$6.00 |
$7.43 |
$11.00 |
$9.94 |
| 42 | 1122-2037 |
TEMPORARY SEDIMENT CONTROL FENCE INSTLL | 3,675 | LF |
$2.50 |
$2.92 |
$3.75 |
$3.20 |
| 43 | 1122-2057 |
TEMPORARY SEDIMENT CONTROL FENCE REMOVE | 3,675 | LF |
$0.5000 |
$1.10 |
$1.50 |
$1.21 |
| 44 | 8251-2006 |
RE PM W/RET REQ TY I(W)4"(SLD)(100MIL) | 68,770 | LF |
$0.3500 |
$0.5060 |
$0.4800 |
$0.5600 |
| 45 | 8251-2015 |
RE PM W/RET REQ TY I(Y)4"(BRK)(100MIL) | 7,894 | LF |
$0.3500 |
$0.5060 |
$0.4800 |
$0.5600 |
| 46 | 8251-2018 |
RE PM W/RET REQ TY I(Y)4"(SLD)(100MIL) | 20,303 | LF |
$0.3500 |
$0.5060 |
$0.4800 |
$0.5600 |
| 47 | 318-2418 |
A-R BINDER (TYPE V) | 100,749 | GAL |
$4.00 |
|
|
|
| 48 | 318-2419 |
A-R BINDER (TYPE IV) | 100,749 | GAL |
$4.00 |
|
|
|