‹ All TxDOT jobs My Jobs
Overlay
OfficialPOTTER COUNTY LINE to SOUTH SL 335 (HOLLYWOOD RD)
- Let date
- Tuesday, December 1, 2026
- Bids open
- Dec 1, 2026 1:00 PM
- District
- Amarillo
- County
- PotterRandall
- Highway
- FM 2590
- Type of work
- Preventive Maintenance
- Project number
- F 2027(215)
- CSJs
- 2635-03-031, 2635-04-048
- Design standard
- PM - Preventative Maintenance
- Let type
- Statewide Let
- Bid type
- Low Bid
- Length
- 4.22 mi
- Project ID
- A00222238
- Added
- Nov 6, 2026
Bid items 92
Notice Averages Review estimate Draft from history Excel HCSS HeavyBid CSV| Seq | Bid code | Description | Quantity | Unit | |
|---|---|---|---|---|---|
| CSJ 2635-03-031 · 42 items | |||||
| 2 | |||||
| 2 | |||||
| 1 | 134-7001 | BACKFILL (TY A)BACKFILLING PAVEMENT EDGES | 61 | STA | |
| 2 | 164-7020 | HYDRO MULCH SEED (PERM_URBAN_CLAY)SEEDING FOR EROSION CONTROL | 13,556 | SY | |
| 3 | 344-7057 | SP MIXES SP-D SAC-A PG70-28SUPERPAVE MIXTURES | 2,914 | TON | |
| 4 | 344-7077 | TACK COATSUPERPAVE MIXTURES | 4,853 | GAL | |
| 5 | 354-7073 | PLANE ASPH CONC PAV (0" TO 1.5")PLANING AND TEXTURING PAVEMENT | 21,969 | SY | |
| 7 | 358-7004 | HIR (RECYCLING AGENT)HOT IN-PLACE RECYCLING OF ASPHALT CONCRETE SURFACES | 68,071 | GAL | |
| 8 | 358-7005 | HIR (MIX)HOT IN-PLACE RECYCLING OF ASPHALT CONCRETE SURFACES | 9,525 | TON | |
| 9 | 358-7006 | HIR (SURFACE)(1.5")HOT IN-PLACE RECYCLING OF ASPHALT CONCRETE SURFACES | 113,450 | SY | |
| 10 | 479-7001 | ADJUSTING MANHOLESADJUSTING MANHOLES AND INLETS | 1 | EA | |
| 11 | 500-7001 | MOBILIZATION | 0.8 | LS | |
| 12 | 502-7001 | BARRICADES, SIGNS AND TRAFFIC HANDLINGBARRICADES, SIGNS, AND TRAFFIC HANDLING | 2 | MO | |
| 13 | 503-7002 | PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA | |
| 14 | 505-7001 | TMA (STATIONARY)TRUCK-MOUNTED ATTENUATOR (TMA) AND TRAILER ATTENUATOR (TA) | 48 | DAY | |
| 15 | 505-7002 | TMA (MOBILE OPERATION)TRUCK-MOUNTED ATTENUATOR (TMA) AND TRAILER ATTENUATOR (TA) | 288 | HR | |
| 16 | 636-7001 | ALUMINUM SIGNS (TY A)SIGNS | 135 | SF | |
| 17 | 636-7004 | REPLACE EXISTING ALUMINUM SIGNS(TY A)SIGNS | 2 | SF | |
| 18 | 644-7001 | IN SM RD SN SUP&AM TY10BWG(1)SA(P)SMALL ROADSIDE SIGN ASSEMBLIES | 2 | EA | |
| 19 | 644-7004 | IN SM RD SN SUP&AM TY10BWG(1)SA(T)SMALL ROADSIDE SIGN ASSEMBLIES | 57 | EA | |
| 22 | 644-7064 | IN SM RD SN SUP&AM (INST SIGN ONLY)SMALL ROADSIDE SIGN ASSEMBLIES | 2 | EA | |
| 24 | 644-7073 | REMOVE SM RD SN SUP&AMSMALL ROADSIDE SIGN ASSEMBLIES | 5 | EA | |
| 25 | 644-7075 | REMOVE SM RD SN SUP&AM (SIGN ONLY)SMALL ROADSIDE SIGN ASSEMBLIES | 3 | EA | |
| 26 | 658-7078 | REMOVE DELIN & OBJECT MARKER ASSMSDELINEATOR AND OBJECT MARKER ASSEMBLIES | 115 | EA | |
| 27 | 658-7080 | INSTL OM SM RD SIGN (1-OM-CON)RDELINEATOR AND OBJECT MARKER ASSEMBLIES | 39 | EA | |
| 28 | 658-7126 | INST DEL ASSM (D-SY)SZ 1(YFLX)SRFLL(BI)DELINEATOR AND OBJECT MARKER ASSEMBLIES | 82 | EA | |
| 29 | 658-7317 | INSTL OM SM RD SIGN (1-OM-PW)YDELINEATOR AND OBJECT MARKER ASSEMBLIES | 20 | EA | |
| 30 | 658-7339 | INST DEL ASS (D-SY)SZ 1(YFLX)GNDLL (BI)DELINEATOR AND OBJECT MARKER ASSEMBLIES | 33 | EA | |
| 31 | 662-7112 | WK ZN PAV MRK SHT TERM (TAB)TY WWORK ZONE PAVEMENT MARKINGS | 4,400 | EA | |
| 32 | 662-7114 | WK ZN PAV MRK SHT TERM (TAB)TY Y-2WORK ZONE PAVEMENT MARKINGS | 2,170 | EA | |
| 35 | 666-7036 | REFL PAV MRK TY I (W)24"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 1,120 | LF | |
| 36 | 666-7042 | REFL PAV MRK TY I (W)(ARROW)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 21 | EA | |
| 39 | 666-7066 | REFL PAV MRK TY I (W)(WORD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 22 | EA | |
| 40 | 666-7090 | REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 29 | EA | |
| 41 | 666-7132 | REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 21 | EA | |
| 42 | 666-7408 | REFL PAV MRK TY I (W)6"(BRK)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 14,870 | LF | |
| 43 | 666-7411 | REFL PAV MRK TY I (W)6"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 18,392 | LF | |
| 44 | 666-7420 | REFL PAV MRK TY I (Y)6"(BRK)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 5,500 | LF | |
| 45 | 666-7423 | REFL PAV MRK TY I (Y)6"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 27,100 | LF | |
| 46 | 672-7023 | RECESSED REFL PAV MRKR TY I-CRAISED PAVEMENT MARKERS | 734 | EA | |
| 47 | 672-7025 | RECESSED REFL PAV MRKR TY II-A-ARAISED PAVEMENT MARKERS | 415 | EA | |
| 59 | 678-7024 | PAV SURF PREP FOR MRK (MED NOSE)PAVEMENT SURFACE PREPARATION FOR MARKINGS | 21 | EA | |
| CSJ 2635-04-048 · 50 items | |||||
| 3 | 344-7057 | SP MIXES SP-D SAC-A PG70-28SUPERPAVE MIXTURES | 1,017 | TON | |
| 4 | 344-7077 | TACK COATSUPERPAVE MIXTURES | 1,618 | GAL | |
| 5 | 354-7073 | PLANE ASPH CONC PAV (0" TO 1.5")PLANING AND TEXTURING PAVEMENT | 4,731 | SY | |
| 6 | 354-7074 | PLANE ASPH CONC PAV (1.5")PLANING AND TEXTURING PAVEMENT | 10,502 | SY | |
| 7 | 358-7004 | HIR (RECYCLING AGENT)HOT IN-PLACE RECYCLING OF ASPHALT CONCRETE SURFACES | 5,901 | GAL | |
| 8 | 358-7005 | HIR (MIX)HOT IN-PLACE RECYCLING OF ASPHALT CONCRETE SURFACES | 821 | TON | |
| 9 | 358-7006 | HIR (SURFACE)(1.5")HOT IN-PLACE RECYCLING OF ASPHALT CONCRETE SURFACES | 9,834 | SY | |
| 11 | 500-7001 | MOBILIZATION | 0.2 | LS | |
| 12 | 502-7001 | BARRICADES, SIGNS AND TRAFFIC HANDLINGBARRICADES, SIGNS, AND TRAFFIC HANDLING | 1 | MO | |
| 16 | 636-7001 | ALUMINUM SIGNS (TY A)SIGNS | 150 | SF | |
| 19 | 644-7004 | IN SM RD SN SUP&AM TY10BWG(1)SA(T)SMALL ROADSIDE SIGN ASSEMBLIES | 5 | EA | |
| 20 | 644-7012 | IN SM RD SN SUP&AM TY10BWG(1)SB(T)SMALL ROADSIDE SIGN ASSEMBLIES | 4 | EA | |
| 21 | 644-7031 | IN SM RD SN SUP&AM TYS80(1)SA(U)SMALL ROADSIDE SIGN ASSEMBLIES | 2 | EA | |
| 23 | 644-7065 | RELOCATE SM RD SN SUP&AM TY 10BWGSMALL ROADSIDE SIGN ASSEMBLIES | 1 | EA | |
| 24 | 644-7073 | REMOVE SM RD SN SUP&AMSMALL ROADSIDE SIGN ASSEMBLIES | 4 | EA | |
| 25 | 644-7075 | REMOVE SM RD SN SUP&AM (SIGN ONLY)SMALL ROADSIDE SIGN ASSEMBLIES | 1 | EA | |
| 26 | 658-7078 | REMOVE DELIN & OBJECT MARKER ASSMSDELINEATOR AND OBJECT MARKER ASSEMBLIES | 44 | EA | |
| 27 | 658-7080 | INSTL OM SM RD SIGN (1-OM-CON)RDELINEATOR AND OBJECT MARKER ASSEMBLIES | 5 | EA | |
| 28 | 658-7126 | INST DEL ASSM (D-SY)SZ 1(YFLX)SRFLL(BI)DELINEATOR AND OBJECT MARKER ASSEMBLIES | 44 | EA | |
| 29 | 658-7317 | INSTL OM SM RD SIGN (1-OM-PW)YDELINEATOR AND OBJECT MARKER ASSEMBLIES | 7 | EA | |
| 31 | 662-7112 | WK ZN PAV MRK SHT TERM (TAB)TY WWORK ZONE PAVEMENT MARKINGS | 1,200 | EA | |
| 32 | 662-7114 | WK ZN PAV MRK SHT TERM (TAB)TY Y-2WORK ZONE PAVEMENT MARKINGS | 350 | EA | |
| 33 | 666-7009 | REFL PAV MRK TY I (W)6"(DOT)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 70 | LF | |
| 34 | 666-7024 | REFL PAV MRK TY I (W)8"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 1,500 | LF | |
| 35 | 666-7036 | REFL PAV MRK TY I (W)24"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 500 | LF | |
| 36 | 666-7042 | REFL PAV MRK TY I (W)(ARROW)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 32 | EA | |
| 37 | 666-7045 | REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 4 | EA | |
| 38 | 666-7051 | REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 8 | EA | |
| 39 | 666-7066 | REFL PAV MRK TY I (W)(WORD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 13 | EA | |
| 40 | 666-7090 | REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 56 | EA | |
| 41 | 666-7132 | REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 9 | EA | |
| 42 | 666-7408 | REFL PAV MRK TY I (W)6"(BRK)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 3,100 | LF | |
| 43 | 666-7411 | REFL PAV MRK TY I (W)6"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 1,946 | LF | |
| 45 | 666-7423 | REFL PAV MRK TY I (Y)6"(SLD)(100MIL)RETROREFLECTORIZED PAVEMENT MARKINGS | 2,700 | LF | |
| 46 | 672-7023 | RECESSED REFL PAV MRKR TY I-CRAISED PAVEMENT MARKERS | 60 | EA | |
| 47 | 672-7025 | RECESSED REFL PAV MRKR TY II-A-ARAISED PAVEMENT MARKERS | 55 | EA | |
| 48 | 677-7002 | ELIM EXT PM & MRKS (6")ELIMINATING EXISTING PAVEMENT MARKINGS AND MARKERS | 5,000 | LF | |
| 49 | 677-7004 | ELIM EXT PM & MRKS (8")ELIMINATING EXISTING PAVEMENT MARKINGS AND MARKERS | 1,500 | LF | |
| 50 | 677-7008 | ELIM EXT PM & MRKS (24")ELIMINATING EXISTING PAVEMENT MARKINGS AND MARKERS | 100 | LF | |
| 51 | 677-7009 | ELIM EXT PM & MRKS (ARROW)ELIMINATING EXISTING PAVEMENT MARKINGS AND MARKERS | 6 | EA | |
| 52 | 677-7012 | ELIM EXT PM & MRKS (UTURN ARROW)ELIMINATING EXISTING PAVEMENT MARKINGS AND MARKERS | 4 | EA | |
| 53 | 677-7015 | ELIM EXT PM & MRKS (WORD)ELIMINATING EXISTING PAVEMENT MARKINGS AND MARKERS | 6 | EA | |
| 54 | 678-7002 | PAV SURF PREP FOR MRK (6")PAVEMENT SURFACE PREPARATION FOR MARKINGS | 3,600 | LF | |
| 55 | 678-7004 | PAV SURF PREP FOR MRK (8")PAVEMENT SURFACE PREPARATION FOR MARKINGS | 1,500 | LF | |
| 56 | 678-7009 | PAV SURF PREP FOR MRK (ARROW)PAVEMENT SURFACE PREPARATION FOR MARKINGS | 6 | EA | |
| 57 | 678-7012 | PAV SURF PREP FOR MRK (UTURN ARR)PAVEMENT SURFACE PREPARATION FOR MARKINGS | 4 | EA | |
| 58 | 678-7016 | PAV SURF PREP FOR MRK (WORD)PAVEMENT SURFACE PREPARATION FOR MARKINGS | 6 | EA | |
| 59 | 678-7024 | PAV SURF PREP FOR MRK (MED NOSE)PAVEMENT SURFACE PREPARATION FOR MARKINGS | 9 | EA | |
| 60 | 6064-7003 | PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTSTLONGITUDINAL PREFABRICATED PAVEMENT MARKINGS WITH WARRANTY | 1,200 | LF | |
| 61 | 6064-7006 | PREFB PV MK W/WNTY TY B (Y)(6")(SLD)LONGITUDINAL PREFABRICATED PAVEMENT MARKINGS WITH WARRANTY | 2,400 | LF | |
Pre-bid questions 2
Contract Time Determination Nov 19, 2026
Q: Can you please post the CTD?
A: The Conceptual Time Determination (CTD) may be provided upon request for informational purposes only to establish a general estimate of the number of working days anticipated for the contract. It also shows the assumptions used in developing the contract time, including generic resources, production rates, construction sequencing, and average weather conditions based on historical data.
The CTD is not a baseline schedule and does not modify, replace, or supersede any contract requirements, specifications, or provisions.
The CTD may not identify every work item, and some work items may be combined or represented generally for planning purposes.
The Contractor remains solely responsible for planning, scheduling, coordinating labor, equipment, material procurement, subcontractor work, and all other means necessary to prosecute and complete the work within the number of working days specified by the Contract. · Darrell Caldwell
Item 320 Nov 20, 2026
Q: Requirement for an MTV capable of receiving hot mix with min storage of 25 tons. Cutler Repaving utilizes a transfer machine but does not hold 25 tons. Who do we need to review our process with?
A: TxDOT's intent is for all contractors to utilize an MTV with 25 ton capacity. The engineer will consider purposed alternatives after the award of the contract. · Leslie Harms
From TxDOT's Pre-bid Question and Answer data. Answers become part of the proposal; check the official packet before bidding.