| 1 | 104-2017 |
REMOVING CONC (DRIVEWAYS) | 9 | SY |
$10.00 |
$43.10 |
$105.00 |
$79.00 |
|
| 2 | 105-2043 |
REMOVING STAB BASE & ASPH PAV (0-6") | 47 | SY |
$25.00 |
$30.00 |
$36.00 |
$46.90 |
|
| 3 | 112-2001 |
SUBGRADE WIDENING (ORD COMP) | 365.91 | STA |
$300.00 |
$209.30 |
$280.00 |
$380.00 |
|
| 4 | 134-2004 |
BACKFILL (TY A OR B) | 579.91 | STA |
$150.00 |
$235.42 |
$245.00 |
$300.00 |
|
| 5 | 150-2002 |
BLADING | 57 | HR |
$100.00 |
$131.44 |
$310.00 |
$100.00 |
|
| 6 | 164-2034 |
DRILL SEEDING (PERM) (RURAL) (SANDY) | 26.36 | AC |
$400.00 |
$345.45 |
$350.00 |
$600.00 |
|
| 7 | 164-2042 |
DRILL SEEDING (TEMP) (WARM) | 13.21 | AC |
$350.00 |
$241.50 |
$245.00 |
$740.00 |
|
| 8 | 164-2044 |
DRILL SEEDING (TEMP) (COOL) | 13.21 | AC |
$350.00 |
$278.25 |
$280.00 |
$760.00 |
|
| 9 | 168-2001 |
VEGETATIVE WATERING | 1,028 | MG |
$20.00 |
$28.10 |
$25.00 |
$20.00 |
|
| 10 | 316-2010 |
ASPH (CRS-2) | 6,110 | GAL |
$3.50 |
$3.56 |
$3.50 |
$6.00 |
|
| 11 | 316-2365 |
AGGREGATE (TY B GR 4) | 132 | CY |
$150.00 |
$192.67 |
$185.00 |
$292.00 |
|
| 12 | 351-2003 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(7") | 15,278 | SY |
$40.00 |
$6.26 |
$5.20 |
$6.60 |
|
| 13 | 354-2002 |
PLAN & TEXT ASPH CONC PAV(0" TO 2") | 2,091 | SY |
$10.00 |
$3.62 |
$5.75 |
$6.55 |
|
| 14 | 416-2029 |
DRILL SHAFT (RDWY ILL POLE) (30 IN) | 8 | LF |
$275.00 |
$315.00 |
$265.00 |
$330.00 |
|
| 15 | 432-2002 |
RIPRAP (CONC)(5 IN) | 14.4 | CY |
$400.00 |
$490.89 |
$450.00 |
$650.00 |
|
| 16 | 460-2014 |
CMP AR (GAL STL DES 2) | 432 | LF |
$50.00 |
$46.20 |
$42.50 |
$38.75 |
|
| 17 | 460-2015 |
CMP AR (GAL STL DES 3) | 200 | LF |
$60.00 |
$57.75 |
$53.00 |
$52.40 |
|
| 18 | 467-2101 |
SET (TY I)(S= 3 FT)(HW= 3 FT)(4:1)(C) | 5 | EA |
$4,000.00 |
$5,082.18 |
$4,600.00 |
$5,155.00 |
|
| 19 | 467-2107 |
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1)(C) | 8 | EA |
$4,500.00 |
$5,197.69 |
$4,800.00 |
$5,210.00 |
|
| 20 | 467-2108 |
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1)(C) | 2 | EA |
$5,000.00 |
$8,316.30 |
$7,600.00 |
$6,350.00 |
|
| 21 | 467-2151 |
SET (TY I)(S= 3 FT)(HW= 3 FT)(6:1)(C) | 1 | EA |
$5,500.00 |
$4,562.42 |
$4,200.00 |
$5,830.00 |
|
| 22 | 467-2286 |
SET (TY II)(18 IN)(RCP)(6:1)(P) | 2 | EA |
$700.00 |
$1,097.29 |
$1,000.00 |
$1,765.00 |
|
| 23 | 467-2305 |
SET (TY II)(30 IN)(CMP)(6:1)(P) | 2 | EA |
$1,250.00 |
$1,472.68 |
$1,300.00 |
$1,415.00 |
|
| 24 | 467-2336 |
SET (TY II)(DES 2)(CMP)(6:1)(P) | 22 | EA |
$1,000.00 |
$981.79 |
$900.00 |
$1,340.00 |
|
| 25 | 467-2337 |
SET (TY II)(DES 3)(CMP)(6:1)(P) | 14 | EA |
$1,250.00 |
$1,097.29 |
$1,000.00 |
$1,420.00 |
|
| 26 | 496-2006 |
REMOV STR (HEADWALL) | 2 | EA |
$800.00 |
$1,155.04 |
$1,100.00 |
$2,650.00 |
|
| 27 | 496-2007 |
REMOV STR (PIPE) | 396 | LF |
$12.50 |
$11.55 |
$10.50 |
$13.50 |
|
| 28 | 496-2008 |
REMOV STR (BOX CULVERT) | 5 | LF |
$100.00 |
$63.53 |
$58.00 |
$265.00 |
|
| 29 | 500-2001 |
MOBILIZATION | 1 | LS |
$435,827.42 |
$331,828.87 |
$380,000.00 |
$400,775.00 |
|
| 30 | 502-2001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 | MO |
$5,500.00 |
$1,750.40 |
$9,100.00 |
$6,000.00 |
|
| 31 | 510-2001 |
ONE-WAY TRAFFIC CONTROL | 480 | HR |
$90.00 |
$74.16 |
$100.00 |
$155.00 |
|
| 32 | 560-2018 |
MAILBOX INSTALL-S(TWG-POST)TY 4 FND | 9 | EA |
$220.00 |
$267.75 |
$270.00 |
$307.00 |
|
| 33 | 610-2058 |
INS RD IL AM (TY ST) 50T-12 (.4 KW)S | 1 | EA |
$7,700.00 |
$7,875.00 |
$7,400.00 |
$2,750.00 |
|
| 34 | 618-2018 |
CONDT (PVC) (SCHD 40) ( 2") | 403 | LF |
$8.80 |
$4.20 |
$8.45 |
$4.40 |
|
| 35 | 620-2011 |
ELEC CONDR (NO. 8) BARE | 409 | LF |
$1.10 |
$1.05 |
$1.05 |
$1.10 |
|
| 36 | 620-2012 |
ELEC CONDR (NO. 8) INSULATED | 818 | LF |
$1.10 |
$1.05 |
$1.05 |
$1.10 |
|
| 37 | 624-2007 |
GROUND BOX TY A (122311) | 1 | EA |
$600.00 |
$1,575.00 |
$1,300.00 |
$1,650.00 |
|
| 38 | 628-2142 |
ELC SRV TY T 120/240 000 (NS)GS(L)SP(O) | 1 | EA |
$6,000.00 |
$10,500.00 |
$5,800.00 |
$11,000.00 |
|
| 39 | 644-2056 |
RELOCATE SM RD SN SUP & AM TY 10BWG | 56 | EA |
$410.00 |
$472.50 |
$475.00 |
$320.00 |
|
| 40 | 658-2328 |
REMOVE DELIN & OBJECT MARKERS ASSMS | 16 | EA |
$13.00 |
$15.75 |
$16.00 |
$25.00 |
|
| 41 | 658-2342 |
INSTL OM ASSM (OM-2X) (FLX) (GND) | 16 | EA |
$15.00 |
$105.00 |
$105.00 |
$140.00 |
|
| 42 | 662-2113 |
WK ZN PAV MRK SHT TERM (TAB) TY W | 12 | EA |
$1.00 |
$0.9900 |
$1.05 |
$1.00 |
|
| 43 | 662-2115 |
WK ZN PAV MRK SHT TERM (TAB) TY Y-2 | 4,480 | EA |
$1.00 |
$1.00 |
$1.05 |
$1.00 |
|
| 44 | 666-2042 |
REFL PAV MRK TY I (W) 12"(SLD)(100MIL) | 44 | LF |
$5.25 |
$6.30 |
$6.35 |
$6.60 |
|
| 45 | 672-2015 |
REFL PAV MRKR TY II-A-A | 728 | EA |
$2.75 |
$3.15 |
$3.15 |
$3.30 |
|
| 46 | 1122-2001 |
ROCK FILTER DAMS (INSTALL) (TY 1) | 700 | LF |
$20.00 |
$26.25 |
$35.00 |
$27.00 |
|
| 47 | 1122-2009 |
ROCK FILTER DAMS (REMOVE) | 700 | LF |
$6.00 |
$6.30 |
$10.00 |
$3.75 |
|
| 48 | 1122-2016 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 390 | SY |
$18.00 |
$12.60 |
$18.00 |
$33.70 |
|
| 49 | 1122-2019 |
CONSTRUCTION EXITS (REMOVE) | 390 | SY |
$6.50 |
$6.30 |
$8.00 |
$6.75 |
|
| 50 | 1122-2049 |
BIOGRD EROSN CONT LOGS (18" DIA)INSTALL | 2,200 | LF |
$6.00 |
$5.25 |
$6.35 |
$7.75 |
|
| 51 | 1122-2056 |
BIODEGRADBLE EROSION CONTROL LOGS REMOV | 2,200 | LF |
$1.00 |
$0.2600 |
$1.05 |
$2.20 |
|
| 52 | 3268-2008 |
D-GR HMA TY-B PG64-22 | 6,837 | TON |
$100.00 |
$93.44 |
$105.00 |
$89.00 |
|
| 53 | 3268-2085 |
D-GR HMA TY-D SAC-A PG 76-28 | 23,616 | TON |
$100.00 |
$105.21 |
$97.00 |
$98.20 |
|
| 54 | 5369-2001 |
CENTERLINE TEXTURING | 581.63 | STA |
$25.00 |
$22.66 |
$24.50 |
$20.20 |
|
| 55 | 8251-2003 |
RE PM W/RET REQ TY I(W)4"(BRK)(100MIL) | 90 | LF |
$0.3000 |
$0.2300 |
$0.2300 |
$0.2400 |
|
| 56 | 8251-2006 |
RE PM W/RET REQ TY I(W)4"(SLD)(100MIL) | 114,396 | LF |
$0.3500 |
$0.2300 |
$0.2300 |
$0.2400 |
|
| 57 | 8251-2015 |
RE PM W/RET REQ TY I(Y)4"(BRK)(100MIL) | 14,237 | LF |
$0.4000 |
$0.2300 |
$0.2300 |
$0.2400 |
|
| 58 | 8251-2018 |
RE PM W/RET REQ TY I(Y)4"(SLD)(100MIL) | 1,250 | LF |
$0.3000 |
$0.2300 |
$0.2300 |
$0.2400 |
|