| 1 | 100-6004 |
PREPARING ROW(TREE)(12" TO 24" DIA) | 12 | EA |
$1,000.00 |
$1,120.00 |
$1,000.00 |
$1,100.00 |
$1,000.00 |
$1,000.00 |
| 2 | 100-6011 |
PREPARING ROW(TREE)(24" TO 36" DIA.) | 2 | EA |
$1,500.00 |
$1,880.00 |
$2,000.00 |
$1,500.00 |
$1,250.00 |
$2,700.00 |
| 3 | 100-6013 |
PREP ROW (TREE) (2" TO 12" DIA) | 56 | EA |
$500.00 |
$790.00 |
$500.00 |
$300.00 |
$1,000.00 |
$700.00 |
| 4 | 100-6016 |
PREPARING ROW (TREE) (36" TO 48" DIA) | 2 | EA |
$3,000.00 |
$3,600.00 |
$3,500.00 |
$4,350.00 |
$1,500.00 |
$3,000.00 |
| 5 | 104-6009 |
REMOVING CONC (RIPRAP) | 148 | SY |
$40.00 |
$150.00 |
$20.00 |
$45.00 |
$50.00 |
$21.54 |
| 6 | 105-6105 |
REMOVING STAB BASE AND ASPH PAV(15") | 977 | SY |
$15.00 |
$22.60 |
$25.00 |
$25.00 |
$25.00 |
$42.66 |
| 7 | 110-6001 |
EXCAVATION (ROADWAY) | 2,117 | CY |
$35.00 |
$18.75 |
$25.00 |
$44.00 |
$50.00 |
$21.41 |
| 8 | 132-6004 |
EMBANKMENT (FINAL)(DENS CONT)(TY B) | 6,144 | CY |
$38.00 |
$34.60 |
$38.00 |
$44.00 |
$50.00 |
$37.38 |
| 9 | 164-6034 |
DRILL SEEDING (PERM) (RURAL) (SANDY) | 9.15 | AC |
$1,000.00 |
$925.00 |
$900.00 |
$845.00 |
$900.00 |
$1,418.84 |
| 10 | 164-6044 |
DRILL SEEDING (TEMP) (COOL) | 9.15 | AC |
$800.00 |
$810.00 |
$900.00 |
$740.00 |
$800.00 |
$1,221.54 |
| 11 | 169-6004 |
SOIL RETENTION BLANKETS (CL 1) (TY D) | 7,359 | SY |
$3.00 |
$2.00 |
$2.75 |
$2.15 |
$2.50 |
$2.33 |
| 12 | 247-6472 |
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12") | 1,597 | SY |
$60.00 |
$47.50 |
$55.00 |
$41.15 |
$50.00 |
$69.14 |
| 13 | 275-6001 |
CEMENT | 18 | TON |
$280.00 |
$300.00 |
$350.00 |
$370.00 |
$300.00 |
$281.10 |
| 14 | 275-6010 |
CEMENT TREAT (SUBGRADE) (8") | 1,597 | SY |
$14.00 |
$7.50 |
$20.00 |
$11.25 |
$20.00 |
$34.08 |
| 15 | 310-6027 |
PRIME COAT(MC-30 OR AE-P) | 399 | GAL |
$9.00 |
$9.00 |
$20.00 |
$10.40 |
$8.00 |
$8.78 |
| 16 | 354-6002 |
PLAN & TEXT ASPH CONC PAV(0" TO 2") | 1,480 | SY |
$6.00 |
$14.00 |
$14.00 |
$16.65 |
$20.00 |
$17.96 |
| 17 | 400-6005 |
CEM STABIL BKFL | 484 | CY |
$290.00 |
$255.00 |
$250.00 |
$230.00 |
$500.00 |
$322.76 |
| 18 | 403-6001 |
TEMPORARY SPL SHORING | 1,237 | SF |
$75.00 |
$107.00 |
$20.00 |
$145.00 |
$65.00 |
$68.77 |
| 19 | 403-6006 |
TEMPORARY SPL SHORING (COFFERDAM) | 3,640 | SF |
$5.00 |
$122.00 |
$20.00 |
$50.00 |
$45.00 |
$93.78 |
| 20 | 416-6001 |
DRILL SHAFT (18 IN) | 236 | LF |
$200.00 |
$140.00 |
$140.00 |
$120.00 |
$100.00 |
$118.68 |
| 21 | 416-6004 |
DRILL SHAFT (36 IN) | 3,364 | LF |
$490.00 |
$355.00 |
$350.00 |
$325.00 |
$300.00 |
$310.44 |
| 22 | 420-6011 |
CL B CONC (FLUME) | 12.7 | CY |
$850.00 |
$780.00 |
$2,000.00 |
$1,010.00 |
$2,000.00 |
$4,180.10 |
| 23 | 420-6014 |
CL C CONC (ABUT)(HPC) | 135.7 | CY |
$1,650.00 |
$1,490.00 |
$2,000.00 |
$1,550.00 |
$2,000.00 |
$3,463.18 |
| 24 | 420-6030 |
CL C CONC (CAP)(HPC) | 185.4 | CY |
$2,000.00 |
$1,485.00 |
$2,000.00 |
$1,975.00 |
$2,000.00 |
$3,093.02 |
| 25 | 420-6038 |
CL C CONC (COLUMN)(HPC) | 61.8 | CY |
$2,000.00 |
$2,145.00 |
$2,000.00 |
$1,975.00 |
$2,000.00 |
$3,361.85 |
| 26 | 422-6002 |
REINF CONC SLAB (HPC) | 46,200 | SF |
$42.00 |
$38.50 |
$40.00 |
$43.60 |
$37.00 |
$59.80 |
| 27 | 422-6016 |
APPROACH SLAB (HPC) | 131.7 | CY |
$1,000.00 |
$1,100.00 |
$1,500.00 |
$975.00 |
$2,000.00 |
$2,030.90 |
| 28 | 425-6037 |
PRESTR CONC GIRDER (TX40) | 5,370 | LF |
$275.00 |
$290.00 |
$350.00 |
$255.00 |
$250.00 |
$376.73 |
| 29 | 425-6039 |
PRESTR CONC GIRDER (TX54) | 597.5 | LF |
$300.00 |
$390.00 |
$350.00 |
$335.00 |
$360.00 |
$462.66 |
| 30 | 427-6007 |
EPOXY WATERPROOF FINISH (TY X) | 2,863 | SF |
$45.00 |
$13.50 |
$15.00 |
$10.50 |
$15.00 |
$14.76 |
| 31 | 432-6002 |
RIPRAP (CONC)(5 IN) | 70 | CY |
$850.00 |
$895.00 |
$850.00 |
$650.00 |
$1,000.00 |
$650.00 |
| 32 | 432-6024 |
RIPRAP (STONE COMMON)(DRY)(12 IN) | 510 | CY |
$250.00 |
$220.00 |
$210.00 |
$140.00 |
$250.00 |
$93.10 |
| 33 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 3 | CY |
$1,000.00 |
$850.00 |
$850.00 |
$740.00 |
$700.00 |
$4,731.76 |
| 34 | 450-6007 |
RAIL (TY T223)(HPC) | 2,182 | LF |
$175.00 |
$180.00 |
$160.00 |
$215.00 |
$125.00 |
$294.53 |
| 35 | 454-6007 |
HEADER TYPE EXPANSION JOINT | 317 | LF |
$230.00 |
$135.00 |
$280.00 |
$185.00 |
$150.00 |
$251.61 |
| 36 | 459-6009 |
GABIONS (3' X 3')(GALV) | 142 | CY |
$270.00 |
$450.00 |
$380.00 |
$280.00 |
$500.00 |
$334.75 |
| 37 | 496-6010 |
REMOV STR (BRIDGE 100 - 499 FT LENGTH) | 1 | EA |
$200,000.00 |
$100,000.00 |
$75,000.00 |
$396,000.00 |
$450,000.00 |
$50,053.37 |
| 38 | 496-6011 |
REMOV STR (BRIDGE 500 - 999 FT LENGTH) | 1 | EA |
$350,000.00 |
$265,000.00 |
$400,000.00 |
$950,000.00 |
$1,300,000.00 |
$219,678.30 |
| 39 | 496-6042 |
REMOV STR (SMALL) | 8 | EA |
$1,000.00 |
$2,500.00 |
$2,000.00 |
$820.00 |
$1,000.00 |
$665.08 |
| 40 | 496-6043 |
REMOV STR (SMALL FENCE) | 3,490 | LF |
$5.00 |
$3.30 |
$5.00 |
$3.70 |
$2.00 |
$3.00 |
| 41 | 496-6044 |
REMOV STR (TIMBER PILING) | 9 | EA |
$500.00 |
$2,500.00 |
$1,000.00 |
$825.00 |
$900.00 |
$787.61 |
| 42 | 496-6067 |
REMOV STR (TOP OF WALL) | 90 | LF |
$55.00 |
$200.00 |
$100.00 |
$85.00 |
$50.00 |
$172.40 |
| 43 | 496-6072 |
REMOVING ROCK RIPRAP | 165 | LF |
$110.00 |
$75.00 |
$100.00 |
$45.00 |
$50.00 |
$28.43 |
| 44 | 500-6001 |
MOBILIZATION | 1 | LS |
$875,000.00 |
$1,130,000.00 |
$1,200,000.00 |
$1,200,000.00 |
$1,200,000.00 |
$1,312,859.58 |
| 45 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 15 | MO |
$35,000.00 |
$4,000.00 |
$3,500.00 |
$57,000.00 |
$40,000.00 |
$35,250.00 |
| 46 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 156 | SY |
$65.00 |
$75.00 |
$80.00 |
$85.00 |
$70.00 |
$65.62 |
| 47 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 156 | SY |
$13.00 |
$30.00 |
$10.00 |
$15.00 |
$30.00 |
$26.62 |
| 48 | 506-6040 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 3,800 | LF |
$6.00 |
$3.00 |
$5.00 |
$7.00 |
$3.00 |
$5.57 |
| 49 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 3,800 | LF |
$2.50 |
$1.00 |
$1.30 |
$3.35 |
$1.00 |
$1.22 |
| 50 | 508-6001 |
CONSTRUCTING DETOURS | 4,047 | SY |
$110.00 |
$145.00 |
$145.00 |
$150.00 |
$200.00 |
$85.00 |
| 51 | 510-6003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 8 | MO |
$8,000.00 |
$5,000.00 |
$5,000.00 |
$10,000.00 |
$3,100.00 |
$8,000.00 |
| 52 | 512-6017 |
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1) | 1,200 | LF |
$28.00 |
$25.00 |
$55.00 |
$27.00 |
$20.00 |
$41.87 |
| 53 | 512-6041 |
PORT CTB (STKPL)(F-SHAPE)(TY 1) | 1,200 | LF |
$25.00 |
$23.00 |
$35.00 |
$27.00 |
$20.00 |
$41.13 |
| 54 | 530-6005 |
DRIVEWAYS (ACP) | 49 | SY |
$50.00 |
$160.00 |
$75.00 |
$150.00 |
$150.00 |
$96.94 |
| 55 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 900 | LF |
$40.00 |
$34.00 |
$45.00 |
$34.85 |
$33.00 |
$37.00 |
| 56 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 8 | EA |
$3,000.00 |
$2,480.00 |
$2,000.00 |
$2,955.00 |
$2,800.00 |
$2,745.00 |
| 57 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 1,030 | LF |
$4.00 |
$2.25 |
$8.00 |
$3.20 |
$3.00 |
$3.10 |
| 58 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 4 | EA |
$350.00 |
$236.00 |
$350.00 |
$320.00 |
$300.00 |
$355.00 |
| 59 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 8 | EA |
$3,500.00 |
$3,570.00 |
$3,200.00 |
$3,460.00 |
$3,275.00 |
$3,380.00 |
| 60 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 4 | EA |
$310.00 |
$235.00 |
$500.00 |
$320.00 |
$300.00 |
$320.00 |
| 61 | 545-6005 |
CRASH CUSH ATTEN (REMOVE) | 2 | EA |
$1,600.00 |
$1,150.00 |
$2,000.00 |
$2,100.00 |
$2,000.00 |
$1,500.00 |
| 62 | 545-6019 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 2 | EA |
$10,000.00 |
$12,400.00 |
$12,000.00 |
$8,000.00 |
$7,500.00 |
$10,000.00 |
| 63 | 550-6006 |
GATE (REMOVE) | 1 | EA |
$550.00 |
$1,000.00 |
$300.00 |
$1,055.00 |
$1,000.00 |
$750.00 |
| 64 | 552-6003 |
WIRE FENCE (TY C) | 4,515 | LF |
$20.00 |
$20.00 |
$18.00 |
$21.10 |
$20.00 |
$33.70 |
| 65 | 552-6005 |
GATE (TY 1) | 6 | EA |
$2,500.00 |
$2,600.00 |
$2,000.00 |
$2,640.00 |
$2,500.00 |
$5,330.80 |
| 66 | 552-6011 |
CORNER OR PULL POST AM(REM/REP)(METAL) | 19 | EA |
$760.00 |
$1,500.00 |
$750.00 |
$1,320.00 |
$1,250.00 |
$8,908.38 |
| 67 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 8 | EA |
$1,150.00 |
$1,092.00 |
$1,000.00 |
$975.00 |
$925.00 |
$900.00 |
| 68 | 644-6076 |
REMOVE SM RD SN SUP&AM | 6 | EA |
$150.00 |
$100.00 |
$150.00 |
$105.00 |
$100.00 |
$125.00 |
| 69 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 26 | EA |
$20.00 |
$47.00 |
$35.00 |
$37.00 |
$35.00 |
$30.00 |
| 70 | 658-6060 |
REMOVE DELIN & OBJECT MARKER ASSMS | 14 | EA |
$40.00 |
$23.00 |
$5.00 |
$16.00 |
$15.00 |
$30.00 |
| 71 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 27 | EA |
$50.00 |
$47.00 |
$35.00 |
$48.00 |
$45.00 |
$40.00 |
| 72 | 662-6063 |
WK ZN PAV MRK REMOV (W)4"(SLD) | 10,465 | LF |
$1.60 |
$1.25 |
$1.50 |
$2.10 |
$1.22 |
$2.04 |
| 73 | 666-6170 |
REFL PAV MRK TY II (W) 4" (SLD) | 2,000 | LF |
$0.2000 |
$0.3000 |
$0.5000 |
$0.5500 |
$0.2900 |
$0.5100 |
| 74 | 666-6207 |
REFL PAV MRK TY II (Y) 4" (SLD) | 2,000 | LF |
$0.2000 |
$0.3000 |
$0.5000 |
$0.5500 |
$0.2900 |
$0.5100 |
| 75 | 666-6302 |
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) | 5,316 | LF |
$1.40 |
$2.00 |
$2.00 |
$2.10 |
$1.75 |
$2.04 |
| 76 | 666-6314 |
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) | 5,316 | LF |
$1.40 |
$2.00 |
$2.00 |
$2.10 |
$1.75 |
$2.04 |
| 77 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 650 | LF |
$1.50 |
$1.10 |
$1.30 |
$12.70 |
$1.00 |
$12.24 |
| 78 | 678-6001 |
PAV SURF PREP FOR MRK (4") | 4,000 | LF |
$0.2000 |
$0.2500 |
$0.4000 |
$2.10 |
$0.2200 |
$2.04 |
| 79 | 3077-6058 |
SP MIXES SP-D SAC-A PG70-28 | 939 | TON |
$215.00 |
$239.00 |
$290.00 |
$250.00 |
$225.00 |
$243.88 |
| 80 | 3077-6075 |
TACK COAT | 901 | GAL |
$6.00 |
$9.50 |
$20.00 |
$9.00 |
$15.00 |
$9.69 |
| 81 | 4171-6001 |
INSTALL BRIDGE IDENTIFICATION NUMBERS | 4 | EA |
$1,000.00 |
$700.00 |
$500.00 |
$450.00 |
$2,000.00 |
$247.97 |
| 82 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 4 | EA |
$20,000.00 |
$9,500.00 |
$20,000.00 |
$15,000.00 |
$20,000.00 |
$14,000.00 |
| 83 | 6185-6002 |
TMA (STATIONARY) | 2 | DAY |
$500.00 |
$590.00 |
$500.00 |
$350.00 |
$1,500.00 |
$7,000.00 |
| 84 | 6185-6003 |
TMA (MOBILE OPERATION) | 8 | HR |
$100.00 |
$235.00 |
$150.00 |
$95.00 |
$95.00 |
$1,500.00 |