| 1 | 104-6001 |
REMOVING CONC (PAV) | 1,396 | SY |
$35.00 |
$13.75 |
$37.35 |
$20.00 |
$35.00 |
$30.00 |
$40.00 |
|
| 2 | 104-6009 |
REMOVING CONC (RIPRAP) | 936 | SY |
$25.00 |
$8.50 |
$20.00 |
$10.00 |
$15.00 |
$17.00 |
$40.00 |
|
| 3 | 104-6064 |
REMOVING CONC (MISC) | 74 | CY |
$225.00 |
$80.00 |
$155.00 |
$100.00 |
$250.00 |
$220.00 |
$40.00 |
|
| 4 | 105-6008 |
REMOVING STAB BASE AND ASPH PAV (6") | 924 | SY |
$25.00 |
$5.00 |
$4.00 |
$10.00 |
$15.00 |
$15.00 |
$16.00 |
|
| 5 | 105-6041 |
REMOVING STAB BASE AND ASPH PAV(8") | 1,469 | SY |
$15.00 |
$6.50 |
$3.30 |
$10.00 |
$10.00 |
$9.60 |
$10.00 |
|
| 6 | 110-6001 |
EXCAVATION (ROADWAY) | 358 | CY |
$35.00 |
$17.50 |
$15.35 |
$30.00 |
$15.00 |
$33.50 |
$20.00 |
|
| 7 | 110-6002 |
EXCAVATION (CHANNEL) | 1,580 | CY |
$40.00 |
$13.00 |
$15.25 |
$10.00 |
$12.00 |
$24.00 |
$20.00 |
|
| 8 | 110-6003 |
EXCAVATION (SPECIAL) | 636 | CY |
$20.00 |
$18.25 |
$16.00 |
$10.00 |
$7.00 |
$40.00 |
$20.00 |
|
| 9 | 132-6002 |
EMBANKMENT (FINAL)(DENS CONT)(TY A) | 376 | CY |
$65.00 |
$24.75 |
$40.00 |
$30.00 |
$3.00 |
$15.60 |
$30.00 |
|
| 10 | 134-6004 |
BACKFILL (TY A OR B) | 6 | STA |
$800.00 |
$2,000.00 |
$1,500.00 |
$400.00 |
$1,200.00 |
$500.00 |
$1,200.00 |
|
| 11 | 150-6002 |
BLADING | 4 | HR |
$400.00 |
$135.00 |
$365.00 |
$200.00 |
$110.00 |
$200.00 |
$60.00 |
|
| 12 | 164-6034 |
DRILL SEEDING (PERM) (RURAL) (SANDY) | 1.72 | AC |
$5,000.00 |
$1,435.00 |
$1,840.00 |
$1,744.00 |
$550.00 |
$1,382.40 |
$2,000.00 |
|
| 13 | 164-6042 |
DRILL SEEDING (TEMP) (WARM) | 0.86 | AC |
$3,500.00 |
$1,435.00 |
$1,815.00 |
$1,720.94 |
$800.00 |
$1,382.40 |
$2,000.00 |
|
| 14 | 164-6044 |
DRILL SEEDING (TEMP) (COOL) | 0.86 | AC |
$3,500.00 |
$1,435.00 |
$1,815.00 |
$1,720.94 |
$400.00 |
$1,382.40 |
$2,000.00 |
|
| 15 | 168-6001 |
VEGETATIVE WATERING | 68 | MG |
$50.00 |
$50.00 |
$45.00 |
$40.00 |
$16.00 |
$75.00 |
$1.00 |
|
| 16 | 216-6001 |
PROOF ROLLING | 20 | HR |
$195.00 |
$145.00 |
$125.00 |
$200.00 |
$85.00 |
$105.00 |
$60.00 |
|
| 17 | 275-6001 |
CEMENT | 28 | TON |
$225.00 |
$200.00 |
$160.00 |
$150.00 |
$190.00 |
$285.00 |
$200.00 |
|
| 18 | 275-6053 |
CEMENT TREAT (SUBGRADE)(9") | 1,962 | SY |
$35.00 |
$6.00 |
$10.15 |
$10.00 |
$15.00 |
$15.00 |
$16.00 |
|
| 19 | 310-6009 |
PRIME COAT (MC-30) | 588 | GAL |
$60.00 |
$6.00 |
$7.75 |
$7.50 |
$16.00 |
$7.50 |
$10.00 |
|
| 20 | 340-6139 |
D-GR HMA(SQ) TY-D SAC-A PG76-28 | 432 | TON |
$225.00 |
$185.00 |
$160.00 |
$140.00 |
$160.00 |
$245.00 |
$180.00 |
|
| 21 | 360-6006 |
CONC PVMT (CONT REINF - CRCP) (12") | 1,850 | SY |
$150.00 |
$123.75 |
$125.00 |
$150.00 |
$163.00 |
$165.00 |
$175.00 |
|
| 22 | 400-6005 |
CEM STABIL BKFL | 77 | CY |
$150.00 |
$313.00 |
$225.00 |
$200.00 |
$180.00 |
$280.00 |
$300.00 |
|
| 23 | 405-6003 |
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT) | 2 | EA |
$55,000.00 |
$33,000.00 |
$8,000.00 |
$17,500.00 |
$25,000.00 |
$31,946.40 |
$30,000.00 |
|
| 24 | 416-6002 |
DRILL SHAFT (24 IN) | 1,540 | LF |
$175.00 |
$136.00 |
$157.00 |
$185.00 |
$180.00 |
$130.91 |
$140.00 |
|
| 25 | 420-6014 |
CL C CONC (ABUT)(HPC) | 53.6 | CY |
$1,200.00 |
$1,200.00 |
$1,170.00 |
$1,500.00 |
$1,400.00 |
$1,625.00 |
$1,200.00 |
|
| 26 | 420-6030 |
CL C CONC (CAP)(HPC) | 43.8 | CY |
$1,500.00 |
$1,200.00 |
$1,630.00 |
$1,500.00 |
$1,900.00 |
$2,000.00 |
$1,200.00 |
|
| 27 | 420-6038 |
CL C CONC (COLUMN)(HPC) | 13.8 | CY |
$2,500.00 |
$1,200.00 |
$2,000.00 |
$1,500.00 |
$2,500.00 |
$2,700.00 |
$1,600.00 |
|
| 28 | 422-6008 |
REINF CONC SLAB (SLAB BEAM)(HPC) | 10,299 | SF |
$45.00 |
$17.00 |
$21.30 |
$16.00 |
$12.00 |
$18.00 |
$21.00 |
|
| 29 | 422-6016 |
APPROACH SLAB (HPC) | 190.8 | CY |
$500.00 |
$425.00 |
$495.00 |
$1,500.00 |
$600.00 |
$600.00 |
$750.00 |
|
| 30 | 425-6009 |
PRESTR CONC SLAB BEAM (4SB12) | 1,867.88 | LF |
$175.00 |
$163.00 |
$155.00 |
$175.00 |
$195.00 |
$218.42 |
$162.00 |
|
| 31 | 425-6010 |
PRESTR CONC SLAB BEAM (5SB12) | 533.68 | LF |
$200.00 |
$163.00 |
$164.00 |
$175.00 |
$195.00 |
$218.42 |
$162.00 |
|
| 32 | 432-6035 |
RIPRAP (STONE PROTECTION)(24 IN) | 356 | CY |
$160.00 |
$128.00 |
$60.00 |
$150.00 |
$140.00 |
$275.00 |
$200.00 |
|
| 33 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 23 | CY |
$600.00 |
$1,000.00 |
$635.00 |
$600.00 |
$800.00 |
$825.00 |
$500.00 |
|
| 34 | 450-6007 |
RAIL (TY T223)(HPC) | 596 | LF |
$150.00 |
$110.00 |
$91.20 |
$100.00 |
$160.00 |
$100.00 |
$130.00 |
|
| 35 | 454-6001 |
SEALED EXPANSION JOINT (4 IN) (SEJ - A) | 174 | LF |
$90.00 |
$100.00 |
$120.00 |
$100.00 |
$150.00 |
$110.00 |
$100.00 |
|
| 36 | 496-6010 |
REMOV STR (BRIDGE 100 - 499 FT LENGTH) | 2 | EA |
$20,000.00 |
$35,500.00 |
$51,750.00 |
$100,000.00 |
$80,000.00 |
$55,000.00 |
$200,000.00 |
|
| 37 | 500-6001 |
MOBILIZATION | 1 | LS |
$361,516.60 |
$290,000.00 |
$300,000.00 |
$300,000.00 |
$337,000.00 |
$394,699.90 |
$375,000.00 |
|
| 38 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 | MO |
$2,500.00 |
$4,500.00 |
$6,000.00 |
$5,580.00 |
$3,000.00 |
$2,507.73 |
$15,000.00 |
|
| 39 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 480 | LF |
$10.00 |
$7.00 |
$9.25 |
$6.00 |
$10.00 |
$7.56 |
$15.00 |
|
| 40 | 508-6001 |
CONSTRUCTING DETOURS | 3,289 | SY |
$447.16 |
$222.00 |
$233.00 |
$200.00 |
$240.00 |
$350.00 |
$294.00 |
|
| 41 | 533-6001 |
RUMBLE STRIPS (SHOULDER) | 507 | LF |
$15.00 |
$15.00 |
$14.75 |
$14.00 |
$14.00 |
$15.12 |
$20.00 |
|
| 42 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 250 | LF |
$75.00 |
$25.00 |
$24.80 |
$25.00 |
$22.00 |
$24.84 |
$30.00 |
|
| 43 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 8 | EA |
$2,200.00 |
$3,000.00 |
$2,215.00 |
$1,500.00 |
$1,500.00 |
$1,566.00 |
$2,200.00 |
|
| 44 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 2 | EA |
$2,000.00 |
$1,550.00 |
$1,160.00 |
$1,600.00 |
$1,000.00 |
$1,458.00 |
$1,600.00 |
|
| 45 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 250 | LF |
$15.00 |
$5.00 |
$4.20 |
$12.00 |
$10.00 |
$3.24 |
$10.00 |
|
| 46 | 542-6004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 2 | EA |
$500.00 |
$440.00 |
$316.25 |
$850.00 |
$500.00 |
$216.00 |
$500.00 |
|
| 47 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 8 | EA |
$2,500.00 |
$2,500.00 |
$2,900.00 |
$2,200.00 |
$2,000.00 |
$2,570.40 |
$2,400.00 |
|
| 48 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 2 | EA |
$500.00 |
$450.00 |
$316.25 |
$750.00 |
$600.00 |
$216.00 |
$500.00 |
|
| 49 | 666-6300 |
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) | 140 | LF |
$40.00 |
$4.00 |
$4.20 |
$4.00 |
$4.50 |
$4.32 |
$6.00 |
|
| 50 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 1,450 | LF |
$35.00 |
$4.00 |
$4.20 |
$4.00 |
$4.50 |
$4.32 |
$4.00 |
|
| 51 | 666-6312 |
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) | 120 | LF |
$40.00 |
$4.00 |
$4.20 |
$4.00 |
$4.50 |
$4.32 |
$6.00 |
|
| 52 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 740 | LF |
$35.00 |
$4.00 |
$4.20 |
$4.00 |
$4.50 |
$4.32 |
$6.00 |
|
| 53 | 672-6004 |
PLOWABLE REFL PAV MRKR TY II-C-R | 14 | EA |
$50.00 |
$80.00 |
$79.00 |
$75.00 |
$80.00 |
$81.00 |
$100.00 |
|
| 54 | 678-6001 |
PAV SURF PREP FOR MRK (4") | 3,040 | LF |
$2.50 |
$2.00 |
$2.10 |
$2.00 |
$2.20 |
$2.16 |
$2.00 |
|
| 55 | 4021-6001 |
TIP TESTING(DRILL SHAFT) | 6 | EA |
$15,000.00 |
$3,700.00 |
$1,900.00 |
$3,800.00 |
$3,100.00 |
$3,607.20 |
$4,000.00 |
|