| 1 | 100-6002 |
PREPARING ROW | 2 | STA |
$5,000.00 |
$4,000.00 |
$5,000.00 |
$7,500.00 |
| 2 | 104-6036 |
REMOVING CONC (SIDEWALK OR RAMP) | 700 | SY |
$50.00 |
$40.00 |
$32.00 |
$145.00 |
| 3 | 105-6105 |
REMOVING STAB BASE AND ASPH PAV(15") | 250 | SY |
$35.00 |
$19.00 |
$60.50 |
$270.00 |
| 4 | 110-6004 |
EXCAVATION (ROADWAY AND CHANNEL) | 120 | CY |
$30.00 |
$30.00 |
$64.50 |
$145.00 |
| 5 | 112-6001 |
SUBGRADE WIDENING (ORD COMP) | 207 | STA |
$550.00 |
$900.00 |
$2,000.00 |
$2,500.00 |
| 6 | 132-6007 |
EMBANKMENT (FINAL)(ORD COMP)(TY D) | 1,100 | CY |
$45.00 |
$57.00 |
$64.00 |
$110.00 |
| 7 | 134-6004 |
BACKFILL (TY A OR B) | 211 | STA |
$300.00 |
$300.00 |
$175.00 |
$330.00 |
| 8 | 164-6034 |
DRILL SEEDING (PERM) (RURAL) (SANDY) | 16 | AC |
$2,000.00 |
$515.00 |
$550.00 |
$466.00 |
| 9 | 168-6001 |
VEGETATIVE WATERING | 400 | MG |
$60.00 |
$40.00 |
$47.50 |
$45.00 |
| 10 | 216-6001 |
PROOF ROLLING | 20 | HR |
$120.00 |
$180.00 |
$235.00 |
$278.25 |
| 11 | 314-6013 |
EMULS ASPH (EROSN CONT)(CSS-1H) | 9,700 | GAL |
$8.00 |
$6.00 |
$5.15 |
$9.00 |
| 12 | 354-6002 |
PLAN & TEXT ASPH CONC PAV(0" TO 2") | 2,500 | SY |
$7.00 |
$6.95 |
$11.00 |
$15.00 |
| 13 | 401-6001 |
FLOWABLE BACKFILL | 65 | CY |
$350.00 |
$425.00 |
$455.00 |
$250.00 |
| 14 | 403-6001 |
TEMPORARY SPL SHORING | 500 | SF |
$100.00 |
$80.00 |
$130.00 |
$65.00 |
| 15 | 420-6074 |
CL C CONC (MISC) | 98 | CY |
$6,000.00 |
$615.00 |
$750.00 |
$1,000.00 |
| 16 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 16 | CY |
$700.00 |
$895.00 |
$1,000.00 |
$700.00 |
| 17 | 450-6019 |
RAIL (TY T631LS) | 80 | LF |
$120.00 |
$117.00 |
$135.00 |
$105.00 |
| 18 | 460-6011 |
CMP AR (GAL STL DES 4) | 16 | LF |
$400.00 |
$400.00 |
$515.00 |
$250.00 |
| 19 | 462-6054 |
CONC BOX CULV (6 FT X 3 FT)(EXTEND) | 60 | LF |
$2,000.00 |
$1,385.00 |
$1,700.00 |
$900.00 |
| 20 | 462-6069 |
CONC BOX CULV (9 FT X 6 FT)(EXTEND) | 26 | LF |
$2,000.00 |
$2,655.00 |
$2,200.00 |
$1,500.00 |
| 21 | 464-6008 |
RC PIPE (CL III)(36 IN) | 56 | LF |
$800.00 |
$316.00 |
$355.00 |
$265.00 |
| 22 | 464-6009 |
RC PIPE (CL III)(42 IN) | 88 | LF |
$1,000.00 |
$425.00 |
$420.00 |
$300.00 |
| 23 | 466-6101 |
HEADWALL (CH - PW - 0) (DIA= 36 IN) | 2 | EA |
$10,000.00 |
$28,800.00 |
$24,000.00 |
$16,000.00 |
| 24 | 466-6102 |
HEADWALL (CH - PW - 0) (DIA= 42 IN) | 2 | EA |
$15,000.00 |
$33,850.00 |
$28,000.00 |
$22,000.00 |
| 25 | 466-6111 |
HEADWALL (CH - PW - A - 0) (DES= 4) | 2 | EA |
$20,000.00 |
$16,800.00 |
$30,500.00 |
$8,400.00 |
| 26 | 466-6151 |
WINGWALL (FW - 0) (HW=4 FT) | 2 | EA |
$10,000.00 |
$27,800.00 |
$37,000.00 |
$17,500.00 |
| 27 | 466-6196 |
WINGWALL (PW - 2) (HW=7 FT) | 2 | EA |
$25,000.00 |
$67,000.00 |
$42,000.00 |
$70,000.00 |
| 28 | 480-6001 |
CLEAN EXIST CULVERTS | 5 | EA |
$4,000.00 |
$5,600.00 |
$4,200.00 |
$3,255.00 |
| 29 | 496-6005 |
REMOV STR (WINGWALL) | 4 | EA |
$2,000.00 |
$3,500.00 |
$1,600.00 |
$1,000.00 |
| 30 | 496-6006 |
REMOV STR (HEADWALL) | 4 | EA |
$1,800.00 |
$1,750.00 |
$1,900.00 |
$1,000.00 |
| 31 | 496-6043 |
REMOV STR (SMALL FENCE) | 120 | LF |
$10.00 |
$15.00 |
$13.00 |
$12.00 |
| 32 | 500-6001 |
MOBILIZATION | 1 | LS |
$342,748.00 |
$469,000.00 |
$500,000.00 |
$570,000.00 |
| 33 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 | MO |
$7,500.00 |
$35,000.00 |
$25,000.00 |
$30,000.00 |
| 34 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 1,650 | LF |
$11.00 |
$13.50 |
$7.25 |
$7.00 |
| 35 | 529-6008 |
CONC CURB & GUTTER (TY II) | 335 | LF |
$50.00 |
$30.00 |
$77.00 |
$80.00 |
| 36 | 531-6001 |
CONC SIDEWALKS (4") | 700 | SY |
$110.00 |
$112.00 |
$110.00 |
$100.00 |
| 37 | 531-6013 |
CURB RAMPS (TY 10) | 4 | EA |
$2,500.00 |
$1,950.00 |
$3,200.00 |
$2,500.00 |
| 38 | 533-6003 |
RUMBLE STRIPS (SHOULDER) ASPHALT | 42,200 | LF |
$0.5000 |
$0.3000 |
$0.0600 |
$0.3600 |
| 39 | 533-6004 |
RUMBLE STRIPS (CENTERLINE) ASPHALT | 21,100 | LF |
$0.5000 |
$0.3000 |
$0.1100 |
$0.4500 |
| 40 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$3,500.00 |
$5,000.00 |
$5,800.00 |
$4,500.00 |
| 41 | 552-6001 |
WIRE FENCE (TY A) | 100 | LF |
$40.00 |
$50.00 |
$58.00 |
$45.00 |
| 42 | 560-6025 |
RELOCATE EXISTING MAILBOX | 1 | EA |
$500.00 |
$475.00 |
$480.00 |
$425.00 |
| 43 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 24 | EA |
$800.00 |
$1,000.00 |
$965.00 |
$900.00 |
| 44 | 644-6068 |
RELOCATE SM RD SN SUP&AM TY 10BWG | 41 | EA |
$700.00 |
$1,100.00 |
$965.00 |
$975.00 |
| 45 | 658-6060 |
REMOVE DELIN & OBJECT MARKER ASSMS | 52 | EA |
$30.00 |
$16.75 |
$25.50 |
$15.00 |
| 46 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 10 | EA |
$50.00 |
$44.55 |
$51.50 |
$40.00 |
| 47 | 658-6100 |
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) | 12 | EA |
$100.00 |
$140.00 |
$130.00 |
$125.00 |
| 48 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 100 | LF |
$10.00 |
$14.00 |
$15.50 |
$12.50 |
| 49 | 666-6225 |
PAVEMENT SEALER 6" | 40 | LF |
$2.00 |
$1.10 |
$1.30 |
$1.00 |
| 50 | 666-6309 |
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) | 35,958 | LF |
$1.00 |
$0.7500 |
$0.8200 |
$0.6600 |
| 51 | 666-6318 |
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) | 1,744 | LF |
$1.00 |
$0.8000 |
$1.00 |
$0.7200 |
| 52 | 666-6321 |
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) | 31,979 | LF |
$1.00 |
$0.7500 |
$0.8200 |
$0.6700 |
| 53 | 672-6009 |
REFL PAV MRKR TY II-A-A | 500 | EA |
$7.00 |
$6.70 |
$5.00 |
$6.00 |
| 54 | 677-6007 |
ELIM EXT PAV MRK & MRKS (24") | 100 | LF |
$5.00 |
$4.45 |
$3.85 |
$4.00 |
| 55 | 678-6002 |
PAV SURF PREP FOR MRK (6") | 40 | LF |
$2.00 |
$1.10 |
$1.30 |
$1.00 |
| 56 | 3076-6045 |
D-GR HMA TY-D SAC-A PG70-28 | 7,494 | TON |
$145.00 |
$195.00 |
$225.00 |
$236.20 |
| 57 | 3076-6066 |
TACK COAT | 8,501 | GAL |
$18.00 |
$7.75 |
$5.15 |
$4.60 |
| 58 | 3076-6091 |
D-GR HMA TY-B PG70-28 (EXEMPT) | 4,077 | TON |
$150.00 |
$190.00 |
$250.00 |
$236.20 |
| 59 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$21,000.00 |
$9,600.00 |
$15,000.00 |
$18,500.00 |
| 60 | 6185-6002 |
TMA (STATIONARY) | 215 | DAY |
$300.00 |
$560.00 |
$250.00 |
$515.00 |
| 61 | 6185-6005 |
TMA (MOBILE OPERATION) | 19 | DAY |
$300.00 |
$1,180.00 |
$1,100.00 |
$950.00 |