| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$21,190.00 |
$95,000.00 |
$26,790.96 |
$30,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 8,440 | CY |
$8.00 |
$13.51 |
$25.00 |
$15.50 |
$15.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,600 | CY |
$10.00 |
$1.16 |
$2.00 |
$17.50 |
$15.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$7,951.82 |
$45,000.00 |
$9,500.00 |
$31,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,800 | LF |
$3.00 |
$1.68 |
$2.70 |
$1.00 |
$3.00 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 10 | EA |
$300.00 |
$276.59 |
$320.00 |
$104.00 |
$400.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 8 | LF |
$8.00 |
$110.64 |
$32.00 |
$7.50 |
$50.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 6,373 | SY |
$3.00 |
$2.63 |
$3.00 |
$3.50 |
$3.25 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 1 | AC |
$650.00 |
$669.35 |
$1,067.00 |
$1,700.00 |
$1,300.00 |
| 10 | 241 2832 |
MOWING | 2 | AC |
$150.00 |
$163.75 |
$214.00 |
$296.00 |
$210.00 |
| 11 | 307(A) 4200 |
FLY ASH | 985 | TON |
$65.00 |
$88.56 |
$55.00 |
$79.00 |
$42.00 |
| 12 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 18,695 | SY |
$3.00 |
$2.72 |
$5.50 |
$6.50 |
$6.00 |
| 13 | 317 4270 |
CEMENT TREATED BASE | 17,484 | SY |
$8.00 |
$16.41 |
$12.90 |
$27.50 |
$19.00 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 68 | TON |
$30.00 |
$45.69 |
$85.00 |
$36.00 |
$75.00 |
| 15 | 407(B) 0250 |
TACK COAT | 205 | GAL |
$3.00 |
$2.02 |
$3.00 |
$5.30 |
$10.00 |
| 16 | 408 5774 |
PRIME COAT | 6,542 | GAL |
$7.00 |
$3.12 |
$3.00 |
$5.60 |
$3.00 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 527 | TON |
$80.00 |
$71.03 |
$72.95 |
$140.00 |
$98.00 |
| 18 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 666 | TON |
$95.00 |
$80.05 |
$86.70 |
$236.00 |
$130.00 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 34 | TON |
$90.00 |
$110.64 |
$157.00 |
$331.00 |
$150.00 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 5,298 | SY |
$4.00 |
$2.21 |
$4.50 |
$7.50 |
$6.00 |
| 21 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 16,589 | SY |
$20.00 |
$21.49 |
$13.40 |
$16.80 |
$28.00 |
| 22 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 3,686 | CY |
$125.00 |
$126.24 |
$116.65 |
$143.00 |
$142.00 |
| 23 | 509(B) 1328 |
CLASS A CONCRETE | 22 | CY |
$550.00 |
$504.37 |
$533.50 |
$337.00 |
$300.00 |
| 24 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 10 | CY |
$750.00 |
$602.07 |
$560.00 |
$500.00 |
$600.00 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 80 | CY |
$330.00 |
$329.57 |
$320.00 |
$325.00 |
$350.00 |
| 26 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 4,083 | LF |
$10.00 |
$5.72 |
$7.00 |
$15.00 |
$8.00 |
| 27 | 609(B) 1514 |
1'-8" COMB. CURB & GUTTER (8" BARRIER) | 1,000 | LF |
$25.00 |
$23.12 |
$28.20 |
$17.50 |
$26.00 |
| 28 | 610(A) 0605 |
6" CONCRETE SIDEWALK | 2,046 | SY |
$60.00 |
$60.69 |
$54.55 |
$50.00 |
$70.00 |
| 29 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 657 | SY |
$60.00 |
$58.82 |
$66.90 |
$52.00 |
$66.00 |
| 30 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 4 | EA |
$2,500.00 |
$1,537.40 |
$2,455.00 |
$2,600.00 |
$2,800.00 |
| 31 | 611(A) 2659 |
MANHOLE (6' DIAMETER) | 2 | EA |
$5,000.00 |
$3,274.95 |
$4,250.00 |
$4,350.00 |
$4,600.00 |
| 32 | 611(B) 2680 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 1 | VF |
$200.00 |
$220.92 |
$107.00 |
$104.00 |
$115.00 |
| 33 | 611(B) 2682 |
ADD'L.DEPTH IN MANHOLE (6' DIAMETER) | 6 | VF |
$300.00 |
$370.94 |
$271.00 |
$238.00 |
$300.00 |
| 34 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 11 | EA |
$3,800.00 |
$2,718.21 |
$3,633.00 |
$4,004.00 |
$3,800.00 |
| 35 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$2,500.00 |
$2,002.99 |
$2,615.00 |
$2,595.00 |
$2,800.00 |
| 36 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 15 | VF |
$280.00 |
$488.00 |
$240.00 |
$208.00 |
$250.00 |
| 37 | 611(L) 0487 |
JUNCTION BOXES | 225 | CF |
$75.00 |
$72.25 |
$60.00 |
$72.00 |
$64.00 |
| 38 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 463 | LF |
$54.00 |
$50.65 |
$51.75 |
$113.00 |
$55.00 |
| 39 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 563 | LF |
$80.00 |
$70.18 |
$69.40 |
$107.00 |
$72.00 |
| 40 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 116 | LF |
$90.00 |
$91.61 |
$90.70 |
$127.00 |
$96.00 |
| 41 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 125 | LF |
$180.00 |
$170.53 |
$145.50 |
$192.00 |
$150.00 |
| 42 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 228 | LF |
$123.00 |
$118.58 |
$115.00 |
$189.00 |
$120.00 |
| 43 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 660 | LF |
$35.00 |
$9.10 |
$22.40 |
$6.00 |
$25.00 |
| 44 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 130 | LF |
$35.00 |
$11.24 |
$30.00 |
$6.00 |
$25.00 |
| 45 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 1 | EA |
$1,300.00 |
$1,437.79 |
$1,615.00 |
$1,361.00 |
$1,800.00 |
| 46 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$700.00 |
$729.02 |
$854.00 |
$793.00 |
$1,000.00 |
| 47 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 3 | EA |
$850.00 |
$993.23 |
$1,147.00 |
$1,013.00 |
$1,200.00 |
| 48 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,150.00 |
$1,178.40 |
$1,410.00 |
$1,160.00 |
$1,700.00 |
| 49 | 613(L) 5736 |
42" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$2,000.00 |
$2,172.76 |
$2,560.00 |
$1,890.00 |
$2,650.00 |
| 50 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$15,763.35 |
$24,850.00 |
$10,500.00 |
$70,000.00 |
| 51 | 619(B) 4725 |
REMOVAL OF FENCE | 946 | LF |
$2.00 |
$2.18 |
$6.60 |
$3.30 |
$2.00 |
| 52 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 1,543 | LF |
$5.00 |
$3.89 |
$6.30 |
$1.50 |
$8.00 |
| 53 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 25 | SY |
$5.00 |
$16.70 |
$23.50 |
$7.50 |
$30.00 |
| 54 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,375 | SY |
$4.00 |
$2.77 |
$2.25 |
$8.50 |
$5.00 |
| 55 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 621 | SY |
$5.00 |
$14.38 |
$27.00 |
$8.00 |
$15.00 |
| 56 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 408 | SY |
$4.00 |
$14.38 |
$11.00 |
$8.00 |
$15.00 |
| 57 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 469 | SY |
$9.50 |
$9.96 |
$19.00 |
$5.00 |
$15.00 |
| 58 | 619(C) 0924 |
SAWING PAVEMENT | 492 | LF |
$4.00 |
$3.86 |
$3.00 |
$3.50 |
$5.00 |
| 59 | 404(I) 4930 |
(SP) HIGH FRICT. SURF. TREATMENT (GLASS) | 2,055 | SY |
$43.00 |
$42.04 |
$41.00 |
$42.00 |
$39.00 |
| 60 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 24 | EA |
$300.00 |
$55.32 |
$54.00 |
$56.00 |
$57.50 |
| 61 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 142 | SF |
$18.00 |
$15.49 |
$15.00 |
$16.00 |
$16.00 |
| 62 | 851(C) 8324 |
2" SQUARE TUBE POST | 246 | LF |
$10.00 |
$11.06 |
$10.70 |
$11.00 |
$11.00 |
| 63 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,137 | LF |
$0.7500 |
$0.8900 |
$0.8500 |
$0.9000 |
$0.9000 |
| 64 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 504 | LF |
$5.50 |
$5.53 |
$5.35 |
$5.50 |
$6.00 |
| 65 | 855(B) 3300 |
TRAFFIC STRIPE (PLASTIC)(SYMBOLS, WORDS, ETC.) | 14 | EA |
$1,000.00 |
$138.30 |
$133.00 |
$140.00 |
$140.00 |
| 66 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 4,477 | LF |
$0.7500 |
$0.8900 |
$0.8500 |
$0.5500 |
$0.9000 |
| 67 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 2,577 | LF |
$1.00 |
$1.11 |
$1.10 |
$1.10 |
$1.20 |
| 68 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 601 | LF |
$2.00 |
$2.21 |
$2.15 |
$2.25 |
$2.30 |
| 69 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 178 | LF |
$4.00 |
$11.06 |
$10.70 |
$11.25 |
$11.50 |
| 70 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 45 | EA |
$250.00 |
$110.64 |
$107.00 |
$112.00 |
$110.00 |
| 71 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 9,580 | LF |
$0.1000 |
$0.2200 |
$0.2000 |
$0.2200 |
$0.2000 |
| 72 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 736 | EA |
$0.5000 |
$1.11 |
$1.10 |
$1.10 |
$3.00 |
| 73 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 9,580 | LF |
$0.1000 |
$0.2000 |
$0.2000 |
$0.2000 |
$0.2500 |
| 74 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 350 | SD |
$0.7500 |
$2.21 |
$2.15 |
$2.25 |
$2.25 |
| 75 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,485 | SD |
$1.50 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.1200 |
| 76 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,830 | SD |
$2.00 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.1200 |
| 77 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,680 | SD |
$0.5000 |
$2.21 |
$2.15 |
$2.25 |
$2.25 |
| 78 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,270 | SD |
$0.5000 |
$4.43 |
$4.30 |
$4.50 |
$4.50 |
| 79 | 880(F) 8878 |
DRUMS | 51,360 | SD |
$0.1200 |
$0.0600 |
$0.0500 |
$0.0600 |
$0.0600 |
| 80 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 30 | LF |
$4.00 |
$7.58 |
$10.70 |
$7.75 |
$7.50 |
| 81 | 802(B) 8344 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 140 | LF |
$7.00 |
$19.91 |
$26.70 |
$20.00 |
$20.00 |
| 82 | 802(B) 8346 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 245 | LF |
$21.00 |
$13.28 |
$10.70 |
$13.50 |
$13.50 |
| 83 | 802(B) 8348 |
4" PVC SCH.40 PLASTIC CONDUIT BORED | 365 | LF |
$10.00 |
$22.13 |
$31.00 |
$22.50 |
$22.00 |
| 84 | 802(B) 8350 |
4" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 60 | LF |
$11.00 |
$20.47 |
$12.80 |
$21.00 |
$20.00 |
| 85 | 802(C) 8552 |
2" HIGH DENSITY PE PIPE - BORED | 495 | LF |
$5.00 |
$17.70 |
$20.00 |
$18.00 |
$18.00 |
| 86 | 802(C) 8557 |
2" HIGH DENSITY PE PIPE - TRENCHED | 3,530 | LF |
$5.00 |
$5.64 |
$8.50 |
$5.75 |
$5.60 |
| 87 | 803(A) 8060 |
PULL BOX | 1 | EA |
$320.00 |
$757.86 |
$710.00 |
$773.00 |
$750.00 |
| 88 | 803(A) 8066 |
PULL BOX(SIZE II) | 4 | EA |
$410.00 |
$608.50 |
$603.00 |
$621.00 |
$610.00 |
| 89 | 803(B) 8085 |
GROUND BOX (GB36) | 6 | EA |
$350.00 |
$1,532.32 |
$1,275.00 |
$1,565.00 |
$1,500.00 |
| 90 | 803(B) 8105 |
GROUND BOX (R48) | 2 | EA |
$400.00 |
$4,657.82 |
$2,415.00 |
$4,751.00 |
$4,600.00 |
| 91 | 804(A) 2915 |
STRUCTURAL CONCRETE | 28.9 | CY |
$475.00 |
$531.06 |
$685.00 |
$542.00 |
$530.00 |
| 92 | 804(B) 2916 |
REINFORCING STEEL | 4,106.4 | LB |
$1.30 |
$1.55 |
$2.00 |
$1.60 |
$1.55 |
| 93 | 805(A) 8726 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$15,000.00 |
$4,563.78 |
$7,110.00 |
$4,656.00 |
$4,550.00 |
| 94 | 805(D) 8742 |
(PL)REMOVE & RESET TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$20,000.00 |
$1,886.36 |
$1,550.00 |
$1,900.00 |
$1,900.00 |
| 95 | 806(A) 8312 |
32'MH POLE 40'TS & 10'LMA(G.STL.) | 1 | EA |
$9,500.00 |
$13,503.25 |
$12,335.00 |
$14,000.00 |
$13,500.00 |
| 96 | 806(A) 8313 |
32'MH POLE 45'TS & 10'LMA(G.STL.) | 1 | EA |
$12,000.00 |
$19,239.78 |
$16,625.00 |
$20,000.00 |
$20,000.00 |
| 97 | 806(A) 8314 |
32'MH POLE 50'TS & 10'LMA(G.STL.) | 1 | EA |
$15,000.00 |
$20,329.55 |
$18,535.00 |
$21,000.00 |
$21,000.00 |
| 98 | 806(A) 8348 |
32'MH POLE,60'TS & 10'LMA(G.STL.) | 1 | EA |
$18,000.00 |
$21,546.56 |
$19,510.00 |
$22,000.00 |
$22,000.00 |
| 99 | 806(B) 8894 |
10' MTG.HT.TS PED.POLE(G.STL.) | 4 | EA |
$720.00 |
$1,198.20 |
$1,900.00 |
$306.00 |
$1,200.00 |
| 100 | 809(A) 8090 |
ROADWAY LUMINAIRE | 4 | EA |
$1,200.00 |
$1,847.64 |
$475.00 |
$1,885.00 |
$1,850.00 |
| 101 | 810(A) 3118 |
SERVICE POLE | 1 | EA |
$5,000.00 |
$7,310.89 |
$6,400.00 |
$7,500.00 |
$7,300.00 |
| 102 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 200 | LF |
$1.50 |
$3.04 |
$3.20 |
$3.10 |
$3.00 |
| 103 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 2,160 | LF |
$0.7000 |
$1.00 |
$1.10 |
$1.00 |
$1.00 |
| 104 | 818(A) 8710 |
(SP)FIBER OPTIC CABLE, 12 SMF | 175 | LF |
$1.80 |
$2.54 |
$2.70 |
$2.60 |
$2.50 |
| 105 | 818(A) 8733 |
(SP)FIBER OPTIC CABLE, 144 SMF | 4,330 | LF |
$3.50 |
$3.71 |
$3.65 |
$3.75 |
$3.75 |
| 106 | 818(B) 8743 |
(SP)FIBER OPTIC PATCH PANEL, 12 PORT | 1 | EA |
$1,200.00 |
$237.87 |
$245.00 |
$243.00 |
$240.00 |
| 107 | 818(C) 8735 |
(SP)FIBER OPTIC CABLE SPLICE | 456 | EA |
$60.00 |
$41.21 |
$42.70 |
$53.00 |
$41.00 |
| 108 | 818(D) 8740 |
(SP)FIBER OPTIC CABLE TERMINATION | 24 | EA |
$75.00 |
$34.85 |
$42.70 |
$36.00 |
$35.00 |
| 109 | 818(F) 8370 |
(SP) SHIELD ISOLATION PEDESTAL | 3 | EA |
$110.00 |
$89.62 |
$90.70 |
$91.00 |
$90.00 |
| 110 | 818(G) 5570 |
(SP)FIBER OPTIC ROUTE SIGN & INSTALLATION | 8 | EA |
$65.00 |
$52.00 |
$53.35 |
$53.00 |
$52.00 |
| 111 | 819 8780 |
(PL)FIBER OPTIC & COMMUNICATION EQUIPMENT | 1 | LSUM |
$25,000.00 |
$4,135.61 |
$6,800.00 |
$4,200.00 |
$4,000.00 |
| 112 | 825 8550 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 1 | EA |
$25,000.00 |
$33,323.87 |
$29,000.00 |
$33,000.00 |
$34,000.00 |
| 113 | 828 8132 |
(PL)DETECTION SYSTEM (VIDEO) | 1 | LSUM |
$25,000.00 |
$38,236.16 |
$34,000.00 |
$38,500.00 |
$38,000.00 |
| 114 | 830 8000 |
PEDESTRIAN PUSH BUTTON | 8 | EA |
$1,200.00 |
$1,316.58 |
$1,045.00 |
$1,350.00 |
$1,310.00 |
| 115 | 831 8231 |
1WAY 3SEC. ADJ. SIG. HD. S-6 | 7 | EA |
$500.00 |
$669.35 |
$536.00 |
$683.00 |
$670.00 |
| 116 | 831 8252 |
1WAY 3SEC. ADJ. SIG. HD. S-9 | 6 | EA |
$600.00 |
$685.95 |
$536.00 |
$700.00 |
$690.00 |
| 117 | 831 8286 |
1WAY 5SEC. ADJ. SIG. HD. S-19 | 2 | EA |
$1,000.00 |
$1,145.10 |
$1,066.00 |
$1,170.00 |
$1,200.00 |
| 118 | 831 8295 |
1WAY 2SEC. ADJ. PED. SIG. HD. S-20 | 8 | EA |
$500.00 |
$555.40 |
$496.00 |
$570.00 |
$555.00 |
| 119 | 833 3030 |
BACKPLATE | 15 | EA |
$90.00 |
$192.51 |
$176.00 |
$200.00 |
$200.00 |
| 120 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 4,095 | LF |
$1.10 |
$1.66 |
$2.15 |
$1.70 |
$1.65 |
| 121 | 834(A) 8208 |
7/C TRAFFIC SIGNAL ELECTRICAL CABLE | 420 | LF |
$1.80 |
$1.99 |
$3.20 |
$2.00 |
$2.00 |
| 122 | 834(A) 8213 |
21/C TRAFFIC SIGNAL ELECTRICAL CABLE | 960 | LF |
$3.70 |
$4.81 |
$5.35 |
$5.00 |
$5.00 |
| 123 | 834(B) 8220 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 48 | LF |
$0.9000 |
$2.05 |
$5.35 |
$2.00 |
$2.00 |
| 124 | 840(A) 8592 |
E.P.S. OPTICAL EMITTER | 3 | EA |
$950.00 |
$4,587.01 |
$4,498.00 |
$4,700.00 |
$4,550.00 |
| 125 | 840(B) 8593 |
E.P.S. OPTICAL DETECTOR | 1 | EA |
$600.00 |
$4,381.23 |
$4,498.00 |
$4,500.00 |
$4,400.00 |
| 126 | 840(C) 8594 |
E.P.S. OPTICAL DETECTOR CABLE | 125 | LF |
$1.10 |
$2.71 |
$5.35 |
$2.75 |
$2.75 |
| 127 | 840(D) 8595 |
E.P.S. 2 CHANNEL PHASE SELECTOR | 2 | EA |
$2,000.00 |
$2,566.78 |
$1,820.00 |
$2,600.00 |
$2,550.00 |
| 128 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 74 | SF |
$2,590.00 |
$39.83 |
$48.00 |
$41.00 |
$40.00 |
| 129 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$29,706.04 |
$45,000.00 |
$12,000.00 |
$30,000.00 |
| 130 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$6,088.66 |
$25,000.00 |
$505.00 |
$6,750.00 |
| 131 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$7,768.06 |
$12,000.00 |
$1,800.00 |
$12,000.00 |
| 132 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$155,000.00 |
$163,741.96 |
$139,027.00 |
$60,000.00 |
$190,000.00 |