Bid tab 170268

Let Aug 17, 2017 · Division 8 · Mayes Sign up free

‹ Aug 2017 results

BRIDGE AND APPROACHES SH -20: OVER SPAVINAW CREEK , 2.5 MILES SOUTHWEST OF THE SH -82 JUNCTION NEAR SPAVINAW . PROJECT LENGTH = 0.224 MILE

Let date
Thursday, August 17, 2017
Contract
170268
J/P numbers
28851(04)
District
Division 8
County
Mayes
Highway
Limits
BRIDGE AND APPROACHES SH -20: OVER SPAVINAW CREEK , 2.5 MILES SOUTHWEST OF THE SH -82 JUNCTION NEAR SPAVINAW . PROJECT LENGTH = 0.224 MILE
Project number
STP-249B(035)SS

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$2,177,373
1 BECCO CONTRACTORS, INC. Low bidder $2,145,000 -1.5%
3 Treas Construction Inc $2,201,760 +1.1% +2.6%
4 B & B BRIDGE COMPANY, LLC $2,276,684 +4.6% +6.1%
5 Crossland Construction Company, Inc. $2,571,986 +18.1% +19.9%
6 M.J. HUGHES CONSTRUCTION, INC. $2,594,933 +19.2% +21.0%
7 JENSEN CONSTRUCTION COMPANY $2,724,603 +25.1% +27.0%

Bid tab: unit prices 85 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BECCO CONTRACTO…#3 Treas Construct…#4 B & B BRIDGE CO…#5 Crossland Const…#6 M.J. HUGHES CON…#7 JENSEN CONSTRUC…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $15,000.00 $55,000.00 $11,825.00 $17,575.00 $35,000.00 $45,000.00 $10,750.00
2202(A) 0183 UNCLASSIFIED EXCAVATION4,605CY $10.00 $10.00 $13.36 $10.35 $8.69 $9.76 $12.15
3202(D) 0184 UNCLASSIFIED BORROW9,787CY $12.00 $10.00 $9.64 $11.05 $20.17 $12.63 $8.77
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $12,000.00 $15,000.00 $10,450.00 $18,750.00 $22,241.00 $8,037.91 $9,500.00
5210 0121 OBLITERATING ABANDONED ROAD1,181LF $6.68 $10.00 $9.90 $3.25 $19.99 $8.04 $9.00
6221(C) 2801 TEMPORARY SILT FENCE4,300LF $2.50 $2.00 $2.18 $1.99 $2.15 $2.29 $1.99
7221(F) 0100 TEMPORARY SILT DIKE96LF $7.50 $7.00 $7.64 $6.95 $7.52 $7.98 $6.95
8221(G) 0152 TEMPORARY ROCK FILTER DAM TYPE 390CY $35.00 $150.00 $60.50 $100.00 $42.10 $44.92 $75.00
9230(A) 2806 SOLID SLAB SODDING10,729SY $2.00 $2.00 $2.14 $1.95 $2.11 $2.24 $1.95
10233(A) 2817 VEGETATIVE MULCHING3.55AC $399.72 $300.00 $324.50 $295.00 $319.32 $338.74 $295.00
11303(A) 2100 AGGREGATE BASE TYPE A1,356CY $60.00 $35.00 $40.16 $46.50 $45.93 $55.69 $36.46
12325 5271 SEPARATOR FABRIC6,453SY $1.20 $1.00 $1.45 $1.25 $0.9200 $2.01 $1.32
13402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E257TON $30.00 $25.00 $20.01 $26.50 $48.53 $28.71 $18.19
14407(B) 0250 TACK COAT872GAL $4.00 $2.50 $4.12 $3.50 $4.14 $2.58 $3.75
15408 5774 PRIME COAT3,997GAL $5.00 $1.00 $5.50 $5.00 $5.52 $3.44 $5.00
16411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)2,028TON $70.00 $65.00 $81.40 $73.50 $84.44 $86.41 $74.00
17411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)701TON $90.00 $70.00 $87.45 $94.50 $87.80 $108.80 $79.50
18509(D) 0325 CLASS C CONCRETE225CY $300.00 $240.00 $165.00 $375.00 $317.56 $350.00 $350.00
19601(A) 0297 TYPE I PLAIN RIPRAP32TON $50.00 $40.00 $79.07 $50.00 $59.89 $33.87 $40.00
20613(EE) 5610 (SP) 18" CORRUGATED POLYPROPYLENE PIPE210LF $35.00 $65.00 $46.67 $45.00 $78.55 $45.93 $42.43
21613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND6EA $529.49 $350.00 $522.50 $250.00 $519.00 $401.90 $475.00
22619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $10,000.00 $6,500.00 $7,535.00 $3,500.00 $124,506.00 $5,167.23 $6,850.00
23619(B) 4728 REMOVAL OF ASPHALT PAVEMENT3,542SY $3.00 $7.00 $4.40 $6.00 $3.04 $4.59 $3.00
24619(B) 4780 REMOVAL OF GUARDRAIL220LF $5.00 $5.00 $4.40 $3.00 $2.44 $15.31 $5.00
25619(C) 0924 SAWING PAVEMENT310LF $7.50 $5.00 $8.80 $5.00 $10.83 $4.59 $8.00
26623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE175LF $20.00 $19.00 $18.15 $16.50 $41.61 $18.95 $18.00
27623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,250.00 $2,382.65 $2,365.00 $2,150.00 $4,223.00 $2,468.79 $2,200.00
28623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $1,600.00 $1,800.00 $1,787.50 $1,625.00 $2,588.00 $1,865.94 $1,700.00
29624(B) 4466 GATES-STYLE WWF (4.5'HIGH X 16'LONG)2EA $200.00 $1,100.00 $1,100.00 $1,000.00 $1,570.00 $1,148.27 $550.00
30624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)995LF $6.02 $4.50 $4.51 $4.10 $5.85 $4.71 $8.05
31624(C) 7181 FENCE-STYLE SWF (6 BARBED WIRE)359LF $9.50 $5.00 $5.11 $4.65 $6.17 $5.34 $10.00
32501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON135CY $25.00 $25.00 $27.50 $25.00 $37.72 $14.01 $25.00
33501(C) 1308 SUBSTRUCTURE EXCAVATION ROCK115CY $100.00 $100.00 $82.50 $75.00 $237.68 $89.00 $35.00
34501(G) 6309 CLSM BACKFILL206CY $125.00 $120.00 $205.48 $150.00 $111.88 $107.89 $150.00
35503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)1,045LF $225.00 $215.00 $212.76 $200.00 $212.11 $250.00 $250.00
36504(A) 1304 APPROACH SLAB307.8SY $200.00 $160.00 $193.52 $225.00 $145.26 $250.00 $150.00
37504(B) 1305 SAW-CUT GROOVING1,328.3SY $5.00 $5.00 $5.72 $4.20 $3.74 $4.82 $6.00
38504(C) 6250 SEALED EXPANSION JOINT47.2LF $250.00 $215.00 $268.73 $250.00 $177.61 $224.00 $200.00
39504(D) 6245 CONCRETE RAIL (TR4)543.4LF $80.00 $55.00 $86.54 $100.00 $107.75 $100.00 $75.00
40506(A) 1322 STRUCTURAL STEEL1,570LB $2.00 $5.00 $2.29 $5.00 $0.8600 $2.08 $2.00
41507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY10EA $2,000.00 $2,000.00 $1,317.22 $1,600.00 $1,385.00 $1,528.75 $1,500.00
42507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY20EA $2,000.00 $2,000.00 $1,329.15 $1,600.00 $1,385.00 $1,509.22 $1,500.00
43509 6152 SPECIAL CONCRETE FINISH110SY $40.00 $110.00 $116.60 $100.00 $73.82 $78.97 $80.00
44509(A) 1326 CLASS AA CONCRETE271.3CY $700.00 $710.00 $663.38 $510.00 $910.54 $1,000.00 $1,400.00
45509(B) 1328 CLASS A CONCRETE234.6CY $700.00 $710.00 $663.38 $510.00 $797.06 $1,000.00 $1,750.00
46509(D) 1331 CLASS C CONCRETE12CY $500.00 $550.00 $550.00 $600.00 $731.63 $435.03 $500.00
47511(B) 6010 EPOXY COATED REINFORCING STEEL120,570LB $1.00 $1.00 $1.11 $1.50 $0.7500 $1.00 $1.00
48514(A) 6010 PILES, FURNISHED (HP 10X42)50LF $50.00 $35.00 $29.25 $20.00 $27.18 $24.16 $25.00
49514(A) 6011 PILES, FURNISHED (HP 12X53)198LF $60.00 $45.00 $35.51 $25.00 $33.78 $30.54 $30.00
50514(B) 6292 PILES, DRIVEN (HP 10X42)50LF $20.00 $15.00 $27.50 $8.60 $105.35 $72.28 $15.00
51514(B) 6294 PILES, DRIVEN (HP 12X53)198LF $30.00 $20.00 $27.50 $11.00 $63.49 $51.62 $15.00
52514(K) 6260 (PL)PILOT HOLES182LF $140.00 $350.00 $385.93 $400.00 $364.06 $550.00 $20.00
53514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
54515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)908SY $4.00 $4.00 $5.11 $3.65 $4.29 $4.19 $4.00
55516(A) 6096 DRILLED SHAFTS 60" DIAMETER60LF $800.00 $2,400.00 $2,686.20 $2,500.00 $2,627.60 $2,500.00 $4,000.00
56516(C) 6200 CROSSHOLE SONIC LOGGING1EA $2,000.00 $6,500.00 $3,025.00 $10,000.00 $2,165.00 $2,009.48 $2,500.00
57523(A) 6550 SEALER CRACK PREPARATION44.8LF $5.00 $5.00 $5.50 $5.00 $5.44 $5.74 $5.00
58523(B) 6560 SEALER RESIN0.6GAL $125.00 $220.00 $220.00 $200.00 $406.01 $229.65 $200.00
59601(B) 1353 TYPE I-A PLAIN RIPRAP830TON $35.00 $40.00 $40.57 $35.00 $30.93 $36.03 $40.00
60601(C) 1355 TYPE I-A FILTER BLANKET155TON $28.00 $30.00 $33.24 $30.00 $27.51 $29.05 $30.00
61613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND94LF $30.00 $15.00 $33.00 $40.00 $15.39 $20.97 $15.00
62613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.32LF $30.00 $15.00 $33.00 $40.00 $50.79 $15.48 $15.00
63619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $50,000.00 $40,000.00 $60,775.00 $60,000.00 $37,000.00 $110,000.00 $100,000.00
64805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS9EA $55.00 $27.00 $27.50 $25.00 $27.00 $28.71 $25.00
65823 8478 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM360SD $100.00 $90.00 $93.50 $85.00 $92.00 $97.60 $85.00
66850(A) 8110 SHEET ALUMINUM SIGNS69SF $18.75 $22.00 $22.00 $20.00 $21.65 $22.97 $20.00
67851(C) 8330 2 1/2" SQUARE TUBE POST108LF $10.54 $11.00 $8.80 $8.00 $8.66 $9.19 $8.00
68853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)8EA $20.00 $16.00 $16.50 $15.00 $16.00 $17.22 $15.00
69854(A) 8800 TRAFFIC STRIPE(PAINT)(4" WIDE)8,238LF $0.2300 $0.3000 $0.2700 $0.2500 $0.2700 $0.2900 $0.2500
70856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)10,200LF $0.6700 $0.5000 $0.4900 $0.4500 $0.4900 $0.5200 $0.4500
71857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)3,600LF $0.4100 $0.2500 $0.2700 $0.2500 $0.2700 $0.2900 $0.2500
72877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER680LF $27.94 $25.00 $18.70 $35.00 $37.89 $45.00 $10.00
73880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF4,580SD $0.2700 $1.10 $1.10 $1.00 $1.10 $1.15 $1.00
74880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF460SD $1.22 $3.30 $3.30 $3.00 $3.20 $3.44 $3.00
75880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF4,180SD $1.14 $1.10 $1.10 $1.00 $1.10 $1.15 $1.00
76880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)360SD $0.6500 $1.10 $1.10 $1.00 $1.10 $1.15 $1.00
77880(C) 8848 WING BARRICADES920SD $0.5300 $1.10 $1.10 $1.00 $1.10 $1.15 $1.00
78880(E) 8860 WARNING LIGHTS(TYPE A)7,060SD $0.1700 $0.1000 $0.1100 $0.1000 $0.1000 $0.1100 $0.1000
79880(F) 8878 DRUMS5,450SD $0.2700 $0.2000 $0.1600 $0.1500 $0.2000 $0.1700 $0.1500
80880(I) 8902 FLAGGER40SD $238.21 $50.00 $220.00 $300.00 $487.20 $40.45 $350.00
81882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN460SD $13.66 $11.00 $11.00 $10.00 $10.80 $11.48 $10.00
82642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $10,000.00 $30,000.00 $17,710.00 $14,500.00 $29,783.00 $18,314.94 $40,000.00
83220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $5,500.00 $3,025.00 $6,000.00 $1,083.00 $1,833.20 $5,000.00
84640(A) 1398 FIELD OFFICE1EA $8,000.00 $5,000.00 $5,500.00 $7,500.00 $10,496.00 $10,940.31 $20,000.00
85641 1399 MOBILIZATION1LSUM $150,000.00 $130,000.00 $136,030.60 $202,600.00 $144,432.00 $125,000.00 $155,000.00