| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$83,440.00 |
$42,000.00 |
$28,500.00 |
$120,330.78 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 74,042 | CY |
$6.20 |
$7.35 |
$5.95 |
$6.25 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 11,595 | CY |
$8.00 |
$9.45 |
$6.82 |
$8.45 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,860.00 |
$21,000.00 |
$5,250.00 |
$92,730.90 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 40,431 | LF |
$1.35 |
$0.9500 |
$0.9800 |
$0.9000 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 973 | LF |
$8.00 |
$6.30 |
$5.98 |
$6.00 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 5,160 | LF |
$1.10 |
$1.06 |
$1.00 |
$1.01 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 144,356 | SY |
$1.40 |
$0.8900 |
$0.8500 |
$1.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 29.8 | AC |
$386.00 |
$57.75 |
$100.00 |
$55.00 |
| 10 | 241 2832 |
MOWING | 59.6 | AC |
$75.00 |
$57.75 |
$45.00 |
$55.00 |
| 11 | 307(K) 4300 |
STABILIZED SUBGRADE | 40,866 | SY |
$5.90 |
$4.20 |
$4.44 |
$8.50 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 241 | TON |
$30.00 |
$64.91 |
$24.04 |
$33.29 |
| 13 | 407(B) 0250 |
TACK COAT | 6,825 | GAL |
$4.80 |
$2.10 |
$4.80 |
$2.00 |
| 14 | 408 5774 |
PRIME COAT | 15,125 | GAL |
$3.05 |
$2.96 |
$3.05 |
$2.00 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 10,929 | TON |
$75.00 |
$55.21 |
$57.04 |
$74.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,077 | TON |
$80.75 |
$53.76 |
$59.46 |
$76.50 |
| 17 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 154 | CY |
$5.00 |
$21.00 |
$5.00 |
$50.00 |
| 18 | 509(A) 0319 |
CLASS AA CONCRETE | 587 | CY |
$449.00 |
$484.86 |
$548.16 |
$420.00 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 711 | CY |
$284.00 |
$316.42 |
$312.50 |
$290.00 |
| 20 | 511(A) 0332 |
REINFORCING STEEL | 86,864 | LB |
$0.7900 |
$0.9500 |
$0.8500 |
$1.01 |
| 21 | 611(G) 5704 |
INLET CDI RCP DES. 1 | 1 | EA |
$4,000.00 |
$3,360.00 |
$415.00 |
$2,250.00 |
| 22 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 30 | LF |
$78.00 |
$92.40 |
$55.05 |
$75.50 |
| 23 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 156 | LF |
$82.60 |
$107.21 |
$83.55 |
$102.50 |
| 24 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 178 | LF |
$102.70 |
$119.60 |
$88.26 |
$86.00 |
| 25 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 292 | LF |
$191.20 |
$158.34 |
$132.45 |
$135.00 |
| 26 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 88 | LF |
$23.00 |
$30.19 |
$31.30 |
$41.00 |
| 27 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 74 | LF |
$29.80 |
$38.85 |
$36.75 |
$50.00 |
| 28 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 170 | LF |
$24.70 |
$34.76 |
$33.68 |
$43.00 |
| 29 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 46 | LF |
$50.00 |
$39.11 |
$41.25 |
$50.00 |
| 30 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 74 | LF |
$59.75 |
$47.36 |
$55.52 |
$60.00 |
| 31 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 128 | LF |
$47.00 |
$65.10 |
$84.10 |
$78.00 |
| 32 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 1,372 | LF |
$16.00 |
$10.50 |
$15.27 |
$10.25 |
| 33 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 458 | LF |
$20.00 |
$10.50 |
$14.27 |
$11.21 |
| 34 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,000.00 |
$1,125.60 |
$1,294.00 |
$1,500.00 |
| 35 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 5 | EA |
$1,120.00 |
$1,060.50 |
$1,560.00 |
$1,350.00 |
| 36 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 8 | EA |
$1,100.00 |
$997.50 |
$1,100.00 |
$1,250.00 |
| 37 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 10 | EA |
$1,307.00 |
$1,260.00 |
$1,307.00 |
$1,600.00 |
| 38 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$1,580.00 |
$1,365.00 |
$1,580.00 |
$1,765.00 |
| 39 | 613(M) 7193 |
TYPE CC4 CULVERT END TREATMENT | 6 | EA |
$1,900.00 |
$2,100.00 |
$1,900.00 |
$3,200.00 |
| 40 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$1,000.00 |
$840.00 |
$1,000.00 |
$1,500.00 |
| 41 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$21,000.00 |
$18,250.00 |
$70,000.00 |
| 42 | 619(B) 0291 |
REMOVAL OF HEADWALL | 12 | EA |
$1,950.00 |
$1,260.00 |
$1,950.00 |
$2,000.00 |
| 43 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 8,788 | SY |
$4.38 |
$8.26 |
$6.78 |
$8.22 |
| 44 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,118 | LF |
$3.90 |
$4.96 |
$3.90 |
$3.00 |
| 45 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,638 | LF |
$16.95 |
$16.96 |
$16.15 |
$15.85 |
| 46 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$2,210.00 |
$2,493.75 |
$2,375.00 |
$2,050.00 |
| 47 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$1,605.00 |
$2,310.00 |
$2,200.00 |
$1,400.00 |
| 48 | 624(A) 4281 |
FENCE-STYLE WWF | 370 | LF |
$5.20 |
$4.73 |
$5.00 |
$5.00 |
| 49 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 1,225 | LF |
$4.95 |
$3.68 |
$3.30 |
$3.30 |
| 50 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 18,787 | LF |
$3.70 |
$4.02 |
$3.85 |
$3.85 |
| 51 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 33 | EA |
$12.00 |
$13.49 |
$12.85 |
$12.50 |
| 52 | 501(G) 6309 |
CLSM BACKFILL | 65 | CY |
$250.00 |
$229.95 |
$275.00 |
$275.00 |
| 53 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$30,000.00 |
$19,866.00 |
$25,000.00 |
$30,000.00 |
| 54 | 504 6179 |
BRIDGE TRAFFIC RAIL | 48 | LF |
$250.00 |
$310.80 |
$250.00 |
$250.00 |
| 55 | 504(A) 1304 |
APPROACH SLAB | 189.4 | SY |
$350.00 |
$267.75 |
$300.00 |
$300.00 |
| 56 | 504(B) 1305 |
SAW-CUT GROOVING | 209 | SY |
$5.00 |
$12.60 |
$16.75 |
$12.00 |
| 57 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 18 | EA |
$1,000.00 |
$606.90 |
$1,500.00 |
$1,500.00 |
| 58 | 509(D) 1331 |
CLASS C CONCRETE | 20 | CY |
$500.00 |
$706.65 |
$1,500.00 |
$1,500.00 |
| 59 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$850.00 |
$641.55 |
$650.00 |
$650.00 |
| 60 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 2 | EA |
$30,000.00 |
$29,809.50 |
$20,000.00 |
$20,000.00 |
| 61 | 540 4525 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 18 | EA |
$3,000.00 |
$5,523.00 |
$3,000.00 |
$3,000.00 |
| 62 | 501(G) 6309 |
CLSM BACKFILL | 65 | CY |
$250.00 |
$229.95 |
$275.00 |
$275.00 |
| 63 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$30,000.00 |
$19,866.00 |
$25,000.00 |
$30,501.02 |
| 64 | 504 6179 |
BRIDGE TRAFFIC RAIL | 48 | LF |
$250.00 |
$310.80 |
$250.00 |
$250.00 |
| 65 | 504(A) 1304 |
APPROACH SLAB | 189.4 | SY |
$350.00 |
$267.75 |
$300.00 |
$300.00 |
| 66 | 504(B) 1305 |
SAW-CUT GROOVING | 209 | SY |
$5.00 |
$12.60 |
$16.75 |
$12.00 |
| 67 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 18 | EA |
$1,000.00 |
$606.90 |
$1,500.00 |
$1,500.00 |
| 68 | 509(D) 1331 |
CLASS C CONCRETE | 20 | CY |
$500.00 |
$706.65 |
$1,500.00 |
$1,500.00 |
| 69 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$850.00 |
$641.55 |
$650.00 |
$650.00 |
| 70 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 2 | EA |
$30,000.00 |
$29,809.50 |
$20,000.00 |
$20,000.00 |
| 71 | 540 4535 |
(PL)REPAIR BRIDGE ITEM (TYPE C) | 18 | EA |
$3,000.00 |
$5,523.00 |
$3,000.00 |
$4,000.00 |
| 72 | 540 4545 |
(PL)REPAIR BRIDGE ITEM (TYPE D) | 1 | EA |
$1,000.00 |
$2,751.00 |
$15,000.00 |
$20,000.00 |
| 73 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 180 | SD |
$240.00 |
$94.50 |
$90.00 |
$125.00 |
| 74 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 2,000 | LF |
$0.3500 |
$0.5800 |
$0.5500 |
$0.2500 |
| 75 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 2,500 | EA |
$0.6000 |
$0.6100 |
$0.5800 |
$0.5000 |
| 76 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 144 | LF |
$0.2000 |
$7.35 |
$7.00 |
$2.00 |
| 77 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 360 | SD |
$18.00 |
$11.55 |
$11.00 |
$5.00 |
| 78 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 200 | SD |
$23.00 |
$5.25 |
$5.00 |
$5.00 |
| 79 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 475 | LF |
$25.00 |
$32.92 |
$31.35 |
$40.00 |
| 80 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,287.5 | LF |
$3.00 |
$5.25 |
$5.00 |
$2.00 |
| 81 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 200 | SD |
$9.00 |
$6.30 |
$6.00 |
$1.00 |
| 82 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,800 | SD |
$0.3500 |
$0.2100 |
$0.2000 |
$0.1500 |
| 83 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,800 | SD |
$0.6500 |
$3.47 |
$3.30 |
$5.00 |
| 84 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,200 | SD |
$1.20 |
$3.47 |
$3.30 |
$0.1500 |
| 85 | 880(C) 8848 |
WING BARRICADES | 800 | SD |
$0.8500 |
$0.6300 |
$0.6000 |
$0.1000 |
| 86 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,000 | SD |
$0.3500 |
$0.4700 |
$0.4500 |
$2.00 |
| 87 | 880(F) 8878 |
DRUMS | 4,800 | SD |
$0.2500 |
$0.4700 |
$0.4500 |
$0.1000 |
| 88 | 880(G) 8890 |
CHANNELIZER CONES | 46,400 | SD |
$0.3000 |
$0.4700 |
$0.4500 |
$0.1000 |
| 89 | 880(I) 8902 |
FLAGGER | 200 | SD |
$130.00 |
$136.50 |
$130.00 |
$200.00 |
| 90 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 428 | SD |
$12.00 |
$11.55 |
$11.00 |
$10.00 |
| 91 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 38,570 | LF |
$0.1500 |
$0.1500 |
$0.2400 |
$0.1200 |
| 92 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 79,940 | LF |
$0.5000 |
$0.4100 |
$0.3900 |
$0.3600 |
| 93 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$80,000.00 |
$28,350.00 |
$58,000.00 |
$90,000.00 |
| 94 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$8,682.99 |
$10,000.00 |
$14,446.00 |
| 95 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$251,404.40 |
$103,740.00 |
$345,164.89 |
$269,048.11 |