| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$40,000.00 |
$70,000.00 |
$46,710.00 |
$63,345.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 13,440.44 | CY |
$8.00 |
$9.00 |
$9.25 |
$7.80 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,500 | CY |
$14.00 |
$9.00 |
$12.45 |
$28.00 |
| 4 | 205(A) 4230 |
TYPE A-SALVAGED TOPSOIL | 7,070.26 | CY |
$7.00 |
$9.00 |
$10.40 |
$17.20 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,783.02 | LF |
$2.00 |
$1.45 |
$2.45 |
$1.30 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$500.00 |
$204.50 |
$258.45 |
$180.50 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 3,668 | LF |
$8.00 |
$2.50 |
$9.30 |
$6.40 |
| 8 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 132.98 | CY |
$75.00 |
$73.87 |
$88.25 |
$262.50 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 37,051.09 | SY |
$1.60 |
$1.33 |
$1.20 |
$1.15 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 10.52 | AC |
$280.00 |
$297.98 |
$202.40 |
$262.50 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 5,701.96 | CY |
$57.00 |
$53.10 |
$69.50 |
$70.40 |
| 12 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 7,351.38 | SY |
$4.50 |
$6.41 |
$7.30 |
$14.70 |
| 13 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 690.28 | SY |
$2.25 |
$2.73 |
$4.85 |
$20.90 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,882.37 | TON |
$32.00 |
$26.93 |
$39.50 |
$62.60 |
| 15 | 407(B) 0250 |
TACK COAT | 12,643.75 | GAL |
$3.00 |
$2.00 |
$3.25 |
$4.75 |
| 16 | 408 5774 |
PRIME COAT | 13,409.64 | GAL |
$4.00 |
$0.5000 |
$4.85 |
$6.75 |
| 17 | 409(A) 4242 |
FABRIC REINFORCEMENT | 12,155.56 | SY |
$2.00 |
$1.78 |
$4.30 |
$5.10 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,005.03 | TON |
$85.00 |
$73.00 |
$85.75 |
$105.00 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 11,157.99 | TON |
$85.00 |
$73.00 |
$71.25 |
$64.60 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 5,315.77 | SY |
$5.00 |
$3.50 |
$6.85 |
$10.00 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 72.37 | CY |
$20.00 |
$29.21 |
$26.00 |
$31.30 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 324.08 | CY |
$500.00 |
$639.61 |
$415.20 |
$570.00 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 217.8 | CY |
$300.00 |
$453.40 |
$259.50 |
$257.50 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 45,591.1 | LB |
$1.00 |
$1.05 |
$0.9000 |
$2.15 |
| 25 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 129.5 | TON |
$62.00 |
$50.19 |
$91.35 |
$56.10 |
| 26 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 43.14 | SY |
$95.00 |
$87.64 |
$67.50 |
$67.00 |
| 27 | 611(G) 5476 |
INLET CDI 30SK RCB DES. 4 | 1 | EA |
$4,500.00 |
$4,382.09 |
$4,567.00 |
$7,512.00 |
| 28 | 611(G) 5479 |
INLET CDI 30SK RCB DES. 7 | 1 | EA |
$3,100.00 |
$4,674.23 |
$5,190.00 |
$7,646.00 |
| 29 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 8 | LF |
$88.00 |
$108.38 |
$58.25 |
$233.50 |
| 30 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 64 | LF |
$120.00 |
$78.14 |
$97.75 |
$164.50 |
| 31 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 417 | LF |
$37.00 |
$39.91 |
$33.30 |
$75.50 |
| 32 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 805 | LF |
$39.00 |
$41.02 |
$33.75 |
$70.00 |
| 33 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 48 | LF |
$46.00 |
$62.05 |
$47.75 |
$85.10 |
| 34 | 613(B) 5168 |
24" X 18" CORR. GALV. STEEL PIPE ARCH | 76 | LF |
$44.00 |
$60.64 |
$36.20 |
$58.40 |
| 35 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 54 | EA |
$400.00 |
$152.46 |
$290.65 |
$1,306.00 |
| 36 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$600.00 |
$193.68 |
$326.95 |
$1,769.00 |
| 37 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$900.00 |
$227.42 |
$1,054.00 |
$2,458.00 |
| 38 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 26 | EA |
$600.00 |
$151.23 |
$302.05 |
$1,618.00 |
| 39 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$750.00 |
$1,752.84 |
$918.55 |
$2,375.00 |
| 40 | 613(P) 7030 |
24" X 18" GALV. STEEL CULVERT END SECTION ARCH | 4 | EA |
$500.00 |
$111.01 |
$310.35 |
$926.50 |
| 41 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 7.82 | CY |
$150.00 |
$141.88 |
$77.85 |
$52.80 |
| 42 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$22,000.00 |
$35,000.00 |
$23,875.00 |
$63,080.00 |
| 43 | 619(C) 0924 |
SAWING PAVEMENT | 1,000 | LF |
$4.50 |
$7.60 |
$4.15 |
$7.60 |
| 44 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 602.5 | LF |
$20.00 |
$18.64 |
$18.20 |
$15.50 |
| 45 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$2,300.00 |
$2,629.26 |
$2,336.00 |
$2,774.00 |
| 46 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 1,293.36 | LF |
$6.00 |
$3.80 |
$4.10 |
$4.05 |
| 47 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,636.32 | LF |
$6.50 |
$4.09 |
$4.75 |
$4.70 |
| 48 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 2 | EA |
$800.00 |
$584.28 |
$1,442.00 |
$1,133.00 |
| 49 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 25 | EA |
$100.00 |
$87.64 |
$77.85 |
$92.70 |
| 50 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 3 | EA |
$200.00 |
$175.28 |
$155.70 |
$195.50 |
| 51 | 629(C) 4960 |
MAILBOX | 31 | EA |
$35.00 |
$29.21 |
$25.95 |
$30.90 |
| 52 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 400 | CY |
$10.00 |
$9.35 |
$20.80 |
$17.00 |
| 53 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 55.7 | CY |
$20.00 |
$29.21 |
$20.80 |
$40.60 |
| 54 | 509(A) 1326 |
CLASS AA CONCRETE | 111.6 | CY |
$620.00 |
$649.08 |
$415.20 |
$625.50 |
| 55 | 511(A) 1332 |
REINFORCING STEEL | 17,320 | LB |
$1.00 |
$1.05 |
$0.8800 |
$1.60 |
| 56 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$9,348.47 |
$10,400.00 |
$3,355.00 |
| 57 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 49.76 | SF |
$25.00 |
$25.98 |
$20.80 |
$21.60 |
| 58 | 851(C) 8324 |
2" SQUARE TUBE POST | 79 | LF |
$12.00 |
$13.38 |
$10.40 |
$8.25 |
| 59 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 63,360 | LF |
$0.2000 |
$0.1000 |
$0.8800 |
$0.1000 |
| 60 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 120 | SD |
$12.00 |
$12.00 |
$10.40 |
$1.05 |
| 61 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$22,000.00 |
$5,258.51 |
$4,671.00 |
$16,455.00 |
| 62 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$42,000.00 |
$23,371.17 |
$42,306.00 |
$43,780.00 |
| 63 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$2,000.00 |
$9,345.00 |
$3,676.00 |
| 64 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$200,000.00 |
$115,000.00 |
$178,400.00 |
$177,220.00 |