| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 6,270 | CY |
$9.00 |
$3.12 |
$3.00 |
$3.00 |
$8.50 |
$5.30 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$3,000,000.00 |
|
|
|
|
|
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 10,520 | LF |
$1.50 |
$1.03 |
$0.9900 |
$0.9900 |
$1.08 |
$0.9900 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 4,580 | LF |
$7.50 |
$5.88 |
$5.65 |
$5.65 |
$6.20 |
$5.65 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 356,611 | SY |
$1.00 |
$0.8700 |
$0.8400 |
$0.8400 |
$0.9000 |
$0.8400 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 73.68 | AC |
$350.00 |
$52.00 |
$50.00 |
$50.00 |
$55.00 |
$50.00 |
| 7 | 307(A) 4200 |
FLY ASH | 4,673 | TON |
$75.00 |
$83.89 |
$92.00 |
$92.00 |
$95.00 |
$92.00 |
| 8 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 92,554 | SY |
$2.45 |
$1.82 |
$1.75 |
$1.75 |
$2.00 |
$1.75 |
| 9 | 311(A) 0151 |
PROCESSING EXISTING BASE & SURFACE, METHOD A | 6,068 | LF |
$3.00 |
$5.38 |
$3.50 |
$15.00 |
$5.50 |
$4.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 7,450 | TON |
$28.00 |
$38.52 |
$30.00 |
$52.00 |
$40.00 |
$30.00 |
| 11 | 407(B) 0250 |
TACK COAT | 9,166 | GAL |
$3.50 |
$2.69 |
$2.40 |
$1.75 |
$2.56 |
$3.50 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 15,388 | TON |
$70.00 |
$54.59 |
$67.95 |
$72.00 |
$56.50 |
$75.00 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,388 | TON |
$75.00 |
$55.91 |
$75.00 |
$77.00 |
$57.75 |
$80.00 |
| 14 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 219 | CY |
$15.00 |
$20.80 |
$20.00 |
$20.00 |
$15.00 |
$18.00 |
| 15 | 509(A) 0319 |
CLASS AA CONCRETE | 654.61 | CY |
$400.00 |
$440.44 |
$423.50 |
$423.50 |
$420.00 |
$459.00 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 2,050.76 | CY |
$250.00 |
$305.14 |
$293.40 |
$293.40 |
$285.00 |
$388.00 |
| 17 | 511(A) 0332 |
REINFORCING STEEL | 102,381.6 | LB |
$0.9000 |
$0.9300 |
$0.8900 |
$0.8900 |
$0.7500 |
$0.8000 |
| 18 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 7,106 | TON |
$38.00 |
$54.08 |
$52.00 |
$52.00 |
$46.00 |
$52.00 |
| 19 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 2,155 | TON |
$30.00 |
$43.68 |
$42.00 |
$42.00 |
$37.00 |
$42.00 |
| 20 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 104 | LF |
$65.00 |
$52.00 |
$50.00 |
$50.00 |
$50.00 |
$50.00 |
| 21 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 208 | LF |
$72.00 |
$72.80 |
$70.00 |
$70.00 |
$65.00 |
$70.00 |
| 22 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 144 | LF |
$95.00 |
$83.20 |
$80.00 |
$80.00 |
$85.00 |
$80.00 |
| 23 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 256 | LF |
$105.00 |
$104.00 |
$100.00 |
$100.00 |
$115.00 |
$100.00 |
| 24 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 216 | LF |
$120.00 |
$119.60 |
$115.00 |
$115.00 |
$145.00 |
$115.00 |
| 25 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 240 | LF |
$140.00 |
$156.00 |
$150.00 |
$150.00 |
$145.00 |
$150.00 |
| 26 | 613(A) 0498 |
60" R.C.PIPE CLASS III | 104 | LF |
$200.00 |
$260.00 |
$250.00 |
$250.00 |
$275.00 |
$250.00 |
| 27 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 96 | LF |
$118.00 |
$104.00 |
$100.00 |
$100.00 |
$130.00 |
$100.00 |
| 28 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 800 | LF |
$27.00 |
$26.00 |
$25.00 |
$25.00 |
$30.00 |
$25.00 |
| 29 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 316 | LF |
$39.00 |
$36.40 |
$35.00 |
$35.00 |
$35.00 |
$35.00 |
| 30 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 216 | LF |
$54.00 |
$52.00 |
$50.00 |
$50.00 |
$52.00 |
$50.00 |
| 31 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 144 | LF |
$70.00 |
$62.40 |
$60.00 |
$60.00 |
$75.00 |
$60.00 |
| 32 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 292 | LF |
$35.00 |
$41.60 |
$40.00 |
$40.00 |
$35.00 |
$40.00 |
| 33 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$420.00 |
$1,040.00 |
$1,000.00 |
$1,000.00 |
$800.00 |
$1,000.00 |
| 34 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$750.00 |
$1,092.00 |
$1,050.00 |
$1,050.00 |
$850.00 |
$1,050.00 |
| 35 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$850.00 |
$1,248.00 |
$1,200.00 |
$1,200.00 |
$1,035.00 |
$1,200.00 |
| 36 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 8 | EA |
$1,400.00 |
$1,560.00 |
$1,500.00 |
$1,500.00 |
$1,350.00 |
$1,500.00 |
| 37 | 613(L) 5736 |
42" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$1,600.00 |
$1,820.00 |
$1,750.00 |
$1,750.00 |
$1,350.00 |
$1,750.00 |
| 38 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$2,000.00 |
$2,600.00 |
$2,500.00 |
$2,500.00 |
$1,900.00 |
$2,500.00 |
| 39 | 613(L) 5742 |
60" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$2,500.00 |
$3,640.00 |
$3,500.00 |
$3,500.00 |
$2,525.00 |
$3,500.00 |
| 40 | 613(M) 7190 |
TYPE E4 CULVERT END TREATMENT | 1 | EA |
$2,500.00 |
$2,756.00 |
$2,650.00 |
$2,650.00 |
$3,500.00 |
$3,000.00 |
| 41 | 613(O) 4808 |
SPECIAL END SECTION OF 36" X 22" RCP ARCH | 4 | EA |
$2,000.00 |
$2,080.00 |
$2,000.00 |
$2,000.00 |
$1,200.00 |
$2,000.00 |
| 42 | 613(P) 0760 |
18" GALV. STEEL CULVERT END SECTION ROUND | 32 | EA |
$325.00 |
$208.00 |
$200.00 |
$200.00 |
$150.00 |
$200.00 |
| 43 | 613(P) 0761 |
24" GALV. STEEL CULVERT END SECTION ROUND | 12 | EA |
$450.00 |
$260.00 |
$250.00 |
$250.00 |
$210.00 |
$250.00 |
| 44 | 613(P) 0763 |
36" GALV. STEEL CULVERT END SECTION ROUND | 10 | EA |
$800.00 |
$520.00 |
$500.00 |
$500.00 |
$515.00 |
$500.00 |
| 45 | 613(P) 0765 |
48" GALV. STEEL CULVERT END SECTION ROUND | 4 | EA |
$1,500.00 |
$1,040.00 |
$1,000.00 |
$1,000.00 |
$1,000.00 |
$1,000.00 |
| 46 | 613(P) 4571 |
28" X 20" GALV. STEEL CULVERT END SECTION ARCH | 8 | EA |
$500.00 |
$260.00 |
$250.00 |
$250.00 |
$165.00 |
$250.00 |
| 47 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$900.00 |
$1,040.00 |
$1,000.00 |
$1,000.00 |
$1,000.00 |
$836.00 |
| 48 | 619(B) 4725 |
REMOVAL OF FENCE | 46,738 | LF |
$1.80 |
$0.9400 |
$0.9000 |
$0.9000 |
$1.00 |
$0.9000 |
| 49 | 619(B) 4778 |
REMOVAL OF EXISTING STRUCTURES | 2 | EA |
$1,000.00 |
$6,500.00 |
$6,250.00 |
$6,250.00 |
$3,000.00 |
$6,250.00 |
| 50 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 386.41 | LF |
$4.00 |
$20.80 |
$20.00 |
$4.00 |
$4.00 |
$4.00 |
| 51 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 382 | LF |
$4.00 |
$52.00 |
$50.00 |
$50.00 |
$4.00 |
$50.00 |
| 52 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 993 | LF |
$10.00 |
$20.96 |
$20.15 |
$20.15 |
$20.00 |
$20.15 |
| 53 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 2,276 | LF |
$15.00 |
$15.60 |
$15.00 |
$16.93 |
$18.25 |
$16.93 |
| 54 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,800.00 |
$2,571.92 |
$2,473.00 |
$1,400.00 |
$1,540.00 |
$1,400.00 |
| 55 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 14 | EA |
$2,200.00 |
$1,244.88 |
$1,197.00 |
$2,200.00 |
$2,420.00 |
$2,200.00 |
| 56 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 37,198 | LF |
$3.75 |
$5.98 |
$5.15 |
$5.75 |
$5.65 |
$5.15 |
| 57 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 3 | EA |
$100.00 |
$156.00 |
$250.00 |
$150.00 |
$100.00 |
$350.00 |
| 58 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 41.44 | SF |
$22.00 |
$26.00 |
$25.00 |
$20.00 |
$22.00 |
$20.00 |
| 59 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 96 | LF |
$20.00 |
$9.36 |
$9.00 |
$15.00 |
$17.00 |
$15.00 |
| 60 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 41,763.22 | LF |
$0.4500 |
$0.6200 |
$0.6000 |
$0.4800 |
$0.5000 |
$0.4800 |
| 61 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$25,000.00 |
$29,848.00 |
$28,700.00 |
$6,750.00 |
$7,500.00 |
$30,000.00 |
| 62 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,331 | CY |
$10.00 |
$3.12 |
$3.00 |
$3.00 |
$8.50 |
$16.00 |
| 63 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 128 | CY |
$15.00 |
$20.80 |
$20.00 |
$20.00 |
$15.00 |
$18.00 |
| 64 | 509(A) 1326 |
CLASS AA CONCRETE | 259.84 | CY |
$450.00 |
$454.21 |
$436.74 |
$436.74 |
$420.00 |
$403.00 |
| 65 | 511(A) 1332 |
REINFORCING STEEL | 46,322 | LB |
$1.00 |
$0.9300 |
$0.8900 |
$0.8900 |
$0.7500 |
$0.8000 |
| 66 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 871 | CY |
$10.00 |
$3.12 |
$3.00 |
$3.00 |
$8.50 |
$16.00 |
| 67 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 68 | CY |
$15.00 |
$20.80 |
$20.00 |
$20.00 |
$15.00 |
$18.00 |
| 68 | 509(A) 1326 |
CLASS AA CONCRETE | 155.3 | CY |
$450.00 |
$454.21 |
$436.74 |
$436.74 |
$420.00 |
$448.00 |
| 69 | 511(A) 1332 |
REINFORCING STEEL | 21,500 | LB |
$1.00 |
$0.9300 |
$0.8900 |
$0.8900 |
$0.7500 |
$0.8000 |
| 70 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$175,000.00 |
$34,254.48 |
$60,200.00 |
$67,500.00 |
$75,000.00 |
$93,000.00 |
| 71 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$10,000.00 |
$50,000.00 |
$10,000.00 |
$35,000.00 |
| 72 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$370,000.00 |
$313,319.57 |
$370,000.00 |
$363,000.00 |
$375,000.00 |
$550,000.00 |