| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$10,000.00 |
$29,000.00 |
$17,510.00 |
$16,000.00 |
$28,500.00 |
$19,000.00 |
$11,215.44 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 5,746.1 | CY |
$8.00 |
$6.00 |
$10.71 |
$5.67 |
$5.50 |
$6.50 |
$7.75 |
$8.58 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 12,018.8 | CY |
$10.00 |
$8.00 |
$12.00 |
$6.70 |
$9.50 |
$10.00 |
$11.50 |
$10.42 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$18,000.00 |
$28,000.00 |
$9,785.00 |
$12,505.00 |
$8,000.00 |
$10,000.00 |
$8,576.51 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,650 | LF |
$2.00 |
$1.50 |
$1.41 |
$2.05 |
$1.99 |
$1.99 |
$1.25 |
$1.57 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 80 | LF |
$10.00 |
$8.00 |
$8.27 |
$9.22 |
$8.95 |
$8.95 |
$9.00 |
$9.22 |
| 7 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 48 | CY |
$120.00 |
$100.00 |
$121.43 |
$98.00 |
$100.00 |
$150.00 |
$125.00 |
$135.38 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 18,010 | SY |
$2.00 |
$1.85 |
$1.70 |
$1.64 |
$1.59 |
$1.59 |
$1.75 |
$2.10 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.72 | AC |
$660.00 |
$500.00 |
$585.85 |
$509.85 |
$495.00 |
$495.00 |
$500.00 |
$653.13 |
| 10 | 241 2832 |
MOWING | 7.44 | AC |
$120.00 |
$100.00 |
$117.17 |
$101.97 |
$99.00 |
$99.00 |
$110.00 |
$130.63 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,151 | CY |
$55.00 |
$44.00 |
$61.00 |
$52.53 |
$51.31 |
$75.00 |
$70.00 |
$47.50 |
| 12 | 310(B) 0149 |
SUBGRADE, METHOD B | 10,644 | SY |
$2.00 |
$2.00 |
$2.39 |
$0.5600 |
$1.00 |
$2.10 |
$2.50 |
$2.64 |
| 13 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 5,855 | SY |
$4.00 |
$2.00 |
$5.05 |
$4.48 |
$5.55 |
$5.00 |
$6.00 |
$6.73 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 800 | TON |
$30.00 |
$42.00 |
$24.85 |
$27.29 |
$28.30 |
$40.00 |
$45.00 |
$36.94 |
| 15 | 407(B) 0250 |
TACK COAT | 1,510 | GAL |
$4.00 |
$1.40 |
$2.00 |
$1.24 |
$1.20 |
$1.20 |
$1.45 |
$1.58 |
| 16 | 408 5774 |
PRIME COAT | 5,343 | GAL |
$6.00 |
$2.75 |
$1.00 |
$2.51 |
$2.44 |
$2.44 |
$3.00 |
$3.22 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,619 | TON |
$80.00 |
$84.50 |
$62.00 |
$79.98 |
$77.65 |
$77.65 |
$93.00 |
$102.46 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,116 | TON |
$100.00 |
$96.00 |
$70.00 |
$92.20 |
$89.51 |
$89.51 |
$107.00 |
$118.11 |
| 19 | 412 5267 |
COLD MILLING PAVEMENT | 1,672 | SY |
$10.00 |
$8.00 |
$7.48 |
$6.12 |
$5.10 |
$5.95 |
$7.00 |
$7.85 |
| 20 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,362 | SY |
$4.00 |
$7.00 |
$4.23 |
$3.86 |
$2.61 |
$12.00 |
$7.00 |
$3.96 |
| 21 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 558 | LF |
$3.00 |
$3.00 |
$5.76 |
$1.03 |
$6.00 |
$10.00 |
$7.00 |
$2.97 |
| 22 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,864.7 | LF |
$6.00 |
$6.00 |
$3.85 |
$3.35 |
$3.65 |
$3.25 |
$4.40 |
$6.73 |
| 23 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 5,850 | CY |
$10.00 |
$6.00 |
$4.73 |
$7.21 |
$10.00 |
$9.50 |
$11.45 |
$8.58 |
| 24 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 365 | CY |
$25.00 |
$10.00 |
$35.51 |
$20.60 |
$10.00 |
$25.00 |
$25.00 |
$23.75 |
| 25 | 509(A) 1326 |
CLASS AA CONCRETE | 1,179 | CY |
$490.00 |
$360.00 |
$389.39 |
$527.36 |
$600.00 |
$553.70 |
$745.00 |
$758.69 |
| 26 | 511(A) 1332 |
REINFORCING STEEL | 180,600 | LB |
$1.00 |
$1.00 |
$1.04 |
$0.9500 |
$0.8000 |
$1.00 |
$0.8500 |
$0.7200 |
| 27 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$8,000.00 |
$8,000.00 |
$2,367.09 |
$772.50 |
$3,000.00 |
$10,000.00 |
$3,800.00 |
$1,319.46 |
| 28 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$13,000.00 |
$6,509.49 |
$15,450.00 |
$15,000.00 |
$50,000.00 |
$18,000.00 |
$23,750.35 |
| 29 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | EA |
$95.00 |
$30.00 |
$6,509.49 |
$51.50 |
$50.00 |
$50.00 |
$77.00 |
$65.97 |
| 30 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$180.00 |
$110.00 |
$118.35 |
$154.50 |
$150.00 |
$150.00 |
$140.00 |
$197.92 |
| 31 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 5 | SF |
$20.00 |
$18.00 |
$17.75 |
$25.75 |
$25.00 |
$25.00 |
$100.00 |
$32.99 |
| 32 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 12.5 | LF |
$10.00 |
$15.00 |
$14.20 |
$10.30 |
$10.00 |
$10.00 |
$9.00 |
$13.19 |
| 33 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 7,141 | LF |
$0.5000 |
$0.6000 |
$0.6500 |
$0.6200 |
$0.6000 |
$0.6000 |
$0.7200 |
$0.7900 |
| 34 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 2,894 | LF |
$0.3000 |
$0.2000 |
$0.1800 |
$0.3100 |
$0.3000 |
$0.3000 |
$0.6600 |
$0.4000 |
| 35 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 13,968 | LF |
$0.8000 |
$0.2000 |
$0.1800 |
$0.5200 |
$0.5000 |
$0.5000 |
$1.51 |
$0.6600 |
| 36 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 8,290 | LF |
$0.3500 |
$0.4000 |
$0.4100 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.7400 |
$0.1300 |
| 37 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 600 | SD |
$4.50 |
$6.00 |
$5.92 |
$2.58 |
$2.50 |
$2.50 |
$4.78 |
$3.30 |
| 38 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,262.5 | LF |
$20.00 |
$23.65 |
$18.80 |
$19.93 |
$28.70 |
$21.50 |
$22.00 |
$28.37 |
| 39 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 662.5 | LF |
$5.00 |
$1.50 |
$4.47 |
$3.09 |
$10.00 |
$1.00 |
$2.09 |
$1.32 |
| 40 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,000 | SD |
$0.3000 |
$0.2500 |
$0.2400 |
$0.2600 |
$0.2500 |
$0.2500 |
$1.55 |
$0.3300 |
| 41 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 900 | SD |
$0.7000 |
$1.15 |
$1.18 |
$0.2600 |
$0.2500 |
$0.2500 |
$4.78 |
$0.3300 |
| 42 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,800 | SD |
$1.50 |
$2.25 |
$2.37 |
$3.09 |
$3.00 |
$3.00 |
$4.78 |
$3.96 |
| 43 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 900 | SD |
$1.00 |
$1.75 |
$1.78 |
$0.2600 |
$0.2500 |
$0.2500 |
$0.2400 |
$0.3300 |
| 44 | 880(C) 8848 |
WING BARRICADES | 600 | SD |
$0.7000 |
$3.40 |
$3.55 |
$0.5200 |
$0.5000 |
$0.5000 |
$0.9000 |
$0.6600 |
| 45 | 880(D) 8854 |
VERTICAL PANELS | 2,250 | SD |
$0.4000 |
$0.6000 |
$0.5900 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0200 |
$0.0700 |
| 46 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,100 | SD |
$0.5000 |
$0.3000 |
$0.3000 |
$2.06 |
$2.00 |
$2.00 |
$0.9600 |
$2.64 |
| 47 | 880(F) 8878 |
DRUMS | 7,350 | SD |
$0.2000 |
$0.4000 |
$0.4100 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0400 |
$0.0700 |
| 48 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 328 | SD |
$14.00 |
$20.00 |
$21.30 |
$5.15 |
$5.00 |
$5.00 |
$26.30 |
$6.60 |
| 49 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$18,000.00 |
$19,574.63 |
$11,433.00 |
$8,200.00 |
$25,000.00 |
$12,000.00 |
$14,646.05 |
| 50 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$25,000.00 |
$1,500.00 |
$2,575.00 |
$10,000.00 |
$15,000.00 |
$8,500.00 |
$19,791.96 |
| 51 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$7,000.00 |
$10,000.00 |
$1,800.00 |
$2,500.00 |
$6,000.00 |
$10,000.00 |
$6,000.00 |
$7,916.78 |
| 52 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$104,000.00 |
$150,000.00 |
$125,000.00 |
$81,195.23 |
$107,100.00 |
$211,090.07 |
$41,000.00 |
$128,462.99 |