Bid tab 160285

Let Aug 18, 2016 · Division 3 · Hughes Sign up free

‹ Aug 2016 results

BRIDGE AND APPROACHES SH -9: OVER UNNAMED CREEK, 1.2 MILES WEST OF US -75, NEAR WETUMKA. PROJECT LENGTH = 0.187 MILE

Let date
Thursday, August 18, 2016
Contract
160285
J/P numbers
28921(04)
District
Division 3
County
Hughes
Highway
Limits
BRIDGE AND APPROACHES SH -9: OVER UNNAMED CREEK, 1.2 MILES WEST OF US -75, NEAR WETUMKA. PROJECT LENGTH = 0.187 MILE
Project number
ACSTP-232C(050)SS

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,909,600
1 T. McDonald Construction, Inc. Low bidder $1,727,400 -9.5%
2 GLOVER & ASSOCIATES, INC. $1,732,473 -9.3% +0.3%
3 Treas Construction Inc $1,738,259 -9.0% +0.6%
4 B & B BRIDGE COMPANY, LLC $1,884,576 -1.3% +9.1%
5 KLAVER CONSTRUCTION COMPANY, INC. $2,187,988 +14.6% +26.7%
6 Cimarron Construction Company, LLC $2,257,824 +18.2% +30.7%
7 C3 Construction, Inc. $2,280,891 +19.4% +32.0%

Bid tab: unit prices 52 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 T. McDonald Con…#2 GLOVER & ASSOCI…#3 Treas Construct…#4 B & B BRIDGE CO…#5 KLAVER CONSTRUC…#6 Cimarron Constr…#7 C3 Construction…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $15,000.00 $10,000.00 $29,000.00 $17,510.00 $16,000.00 $28,500.00 $19,000.00 $11,215.44
2202(A) 0183 UNCLASSIFIED EXCAVATION5,746.1CY $8.00 $6.00 $10.71 $5.67 $5.50 $6.50 $7.75 $8.58
3202(D) 0184 UNCLASSIFIED BORROW12,018.8CY $10.00 $8.00 $12.00 $6.70 $9.50 $10.00 $11.50 $10.42
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $10,000.00 $18,000.00 $28,000.00 $9,785.00 $12,505.00 $8,000.00 $10,000.00 $8,576.51
5221(C) 2801 TEMPORARY SILT FENCE1,650LF $2.00 $1.50 $1.41 $2.05 $1.99 $1.99 $1.25 $1.57
6221(F) 0100 TEMPORARY SILT DIKE80LF $10.00 $8.00 $8.27 $9.22 $8.95 $8.95 $9.00 $9.22
7221(G) 0153 TEMPORARY ROCK FILTER DAM TYPE 448CY $120.00 $100.00 $121.43 $98.00 $100.00 $150.00 $125.00 $135.38
8230(A) 2806 SOLID SLAB SODDING18,010SY $2.00 $1.85 $1.70 $1.64 $1.59 $1.59 $1.75 $2.10
9233(A) 2817 VEGETATIVE MULCHING3.72AC $660.00 $500.00 $585.85 $509.85 $495.00 $495.00 $500.00 $653.13
10241 2832 MOWING7.44AC $120.00 $100.00 $117.17 $101.97 $99.00 $99.00 $110.00 $130.63
11303(A) 2100 AGGREGATE BASE TYPE A2,151CY $55.00 $44.00 $61.00 $52.53 $51.31 $75.00 $70.00 $47.50
12310(B) 0149 SUBGRADE, METHOD B10,644SY $2.00 $2.00 $2.39 $0.5600 $1.00 $2.10 $2.50 $2.64
13326(A) 0100 GEOTEXTILE REINFORCEMENT5,855SY $4.00 $2.00 $5.05 $4.48 $5.55 $5.00 $6.00 $6.73
14402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E800TON $30.00 $42.00 $24.85 $27.29 $28.30 $40.00 $45.00 $36.94
15407(B) 0250 TACK COAT1,510GAL $4.00 $1.40 $2.00 $1.24 $1.20 $1.20 $1.45 $1.58
16408 5774 PRIME COAT5,343GAL $6.00 $2.75 $1.00 $2.51 $2.44 $2.44 $3.00 $3.22
17411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)2,619TON $80.00 $84.50 $62.00 $79.98 $77.65 $77.65 $93.00 $102.46
18411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)1,116TON $100.00 $96.00 $70.00 $92.20 $89.51 $89.51 $107.00 $118.11
19412 5267 COLD MILLING PAVEMENT1,672SY $10.00 $8.00 $7.48 $6.12 $5.10 $5.95 $7.00 $7.85
20619(B) 4728 REMOVAL OF ASPHALT PAVEMENT7,362SY $4.00 $7.00 $4.23 $3.86 $2.61 $12.00 $7.00 $3.96
21619(B) 4780 REMOVAL OF GUARDRAIL558LF $3.00 $3.00 $5.76 $1.03 $6.00 $10.00 $7.00 $2.97
22624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)2,864.7LF $6.00 $6.00 $3.85 $3.35 $3.65 $3.25 $4.40 $6.73
23202(A) 1301 UNCLASSIFIED EXCAVATION5,850CY $10.00 $6.00 $4.73 $7.21 $10.00 $9.50 $11.45 $8.58
24501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED365CY $25.00 $10.00 $35.51 $20.60 $10.00 $25.00 $25.00 $23.75
25509(A) 1326 CLASS AA CONCRETE1,179CY $490.00 $360.00 $389.39 $527.36 $600.00 $553.70 $745.00 $758.69
26511(A) 1332 REINFORCING STEEL180,600LB $1.00 $1.00 $1.04 $0.9500 $0.8000 $1.00 $0.8500 $0.7200
27525(C) 1000 (SP)NEST PREVENTION1LSUM $8,000.00 $8,000.00 $2,367.09 $772.50 $3,000.00 $10,000.00 $3,800.00 $1,319.46
28619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $25,000.00 $13,000.00 $6,509.49 $15,450.00 $15,000.00 $50,000.00 $18,000.00 $23,750.35
29805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS1EA $95.00 $30.00 $6,509.49 $51.50 $50.00 $50.00 $77.00 $65.97
30805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS2EA $180.00 $110.00 $118.35 $154.50 $150.00 $150.00 $140.00 $197.92
31850(A) 8110 SHEET ALUMINUM SIGNS5SF $20.00 $18.00 $17.75 $25.75 $25.00 $25.00 $100.00 $32.99
32851(C) 8330 2 1/2" SQUARE TUBE POST12.5LF $10.00 $15.00 $14.20 $10.30 $10.00 $10.00 $9.00 $13.19
33855(A) 8840 TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE)7,141LF $0.5000 $0.6000 $0.6500 $0.6200 $0.6000 $0.6000 $0.7200 $0.7900
34857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)2,894LF $0.3000 $0.2000 $0.1800 $0.3100 $0.3000 $0.3000 $0.6600 $0.4000
35857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)13,968LF $0.8000 $0.2000 $0.1800 $0.5200 $0.5000 $0.5000 $1.51 $0.6600
36857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)8,290LF $0.3500 $0.4000 $0.4100 $0.1000 $0.1000 $0.1000 $0.7400 $0.1300
37871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.600SD $4.50 $6.00 $5.92 $2.58 $2.50 $2.50 $4.78 $3.30
38877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,262.5LF $20.00 $23.65 $18.80 $19.93 $28.70 $21.50 $22.00 $28.37
39877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER662.5LF $5.00 $1.50 $4.47 $3.09 $10.00 $1.00 $2.09 $1.32
40880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF3,000SD $0.3000 $0.2500 $0.2400 $0.2600 $0.2500 $0.2500 $1.55 $0.3300
41880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF900SD $0.7000 $1.15 $1.18 $0.2600 $0.2500 $0.2500 $4.78 $0.3300
42880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF1,800SD $1.50 $2.25 $2.37 $3.09 $3.00 $3.00 $4.78 $3.96
43880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)900SD $1.00 $1.75 $1.78 $0.2600 $0.2500 $0.2500 $0.2400 $0.3300
44880(C) 8848 WING BARRICADES600SD $0.7000 $3.40 $3.55 $0.5200 $0.5000 $0.5000 $0.9000 $0.6600
45880(D) 8854 VERTICAL PANELS2,250SD $0.4000 $0.6000 $0.5900 $0.0500 $0.0500 $0.0500 $0.0200 $0.0700
46880(E) 8860 WARNING LIGHTS(TYPE A)2,100SD $0.5000 $0.3000 $0.3000 $2.06 $2.00 $2.00 $0.9600 $2.64
47880(F) 8878 DRUMS7,350SD $0.2000 $0.4000 $0.4100 $0.0500 $0.0500 $0.0500 $0.0400 $0.0700
48882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN328SD $14.00 $20.00 $21.30 $5.15 $5.00 $5.00 $26.30 $6.60
49642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $20,000.00 $18,000.00 $19,574.63 $11,433.00 $8,200.00 $25,000.00 $12,000.00 $14,646.05
50220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $4,000.00 $25,000.00 $1,500.00 $2,575.00 $10,000.00 $15,000.00 $8,500.00 $19,791.96
51640(A) 1398 FIELD OFFICE1EA $7,000.00 $10,000.00 $1,800.00 $2,500.00 $6,000.00 $10,000.00 $6,000.00 $7,916.78
52641 1399 MOBILIZATION1LSUM $104,000.00 $150,000.00 $125,000.00 $81,195.23 $107,100.00 $211,090.07 $41,000.00 $128,462.99