| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$45,000.00 |
$59,000.00 |
$71,887.50 |
$85,800.00 |
$250,000.00 |
$277,075.00 |
$73,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 126,391 | CY |
$6.00 |
$5.60 |
$6.43 |
$6.28 |
$6.00 |
$5.93 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 194,172 | CY |
$8.20 |
$9.90 |
$9.23 |
$9.02 |
$8.50 |
$8.32 |
$10.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$95,000.00 |
$57,200.00 |
$79,912.28 |
$78,036.40 |
$50,000.00 |
$104,500.00 |
$68,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 8,230 | LF |
$2.00 |
$1.25 |
$1.27 |
$1.24 |
$1.50 |
$1.30 |
$1.75 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$230.00 |
$100.00 |
$159.75 |
$156.00 |
$400.00 |
$160.00 |
$155.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 266 | LF |
$8.00 |
$11.30 |
$11.60 |
$11.33 |
$8.00 |
$12.00 |
$11.50 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 938 | LF |
$2.00 |
$2.25 |
$2.44 |
$2.38 |
$1.25 |
$2.50 |
$2.35 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 104,111 | SY |
$1.00 |
$1.25 |
$1.29 |
$1.26 |
$1.30 |
$1.33 |
$1.25 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 21.6 | AC |
$350.00 |
$245.00 |
$260.93 |
$254.80 |
$450.00 |
$270.00 |
$255.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 21.6 | AC |
$300.00 |
$400.00 |
$423.87 |
$413.92 |
$460.00 |
$440.00 |
$415.00 |
| 12 | 241 2832 |
MOWING | 43.2 | AC |
$85.00 |
$75.00 |
$76.68 |
$74.88 |
$110.00 |
$79.00 |
$75.00 |
| 13 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 1 | EA |
$5,000.00 |
$4,500.00 |
$3,209.78 |
$2,600.00 |
$2,000.00 |
$2,900.00 |
$5,100.00 |
| 14 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 6,215 | CY |
$50.00 |
$62.40 |
$54.17 |
$52.90 |
$90.00 |
$89.00 |
$67.00 |
| 15 | 307(K) 4300 |
STABILIZED SUBGRADE | 52,666 | SY |
$8.50 |
$4.80 |
$4.79 |
$9.72 |
$7.00 |
$6.50 |
$6.00 |
| 16 | 325 5271 |
SEPARATOR FABRIC | 30,895 | SY |
$1.50 |
$1.15 |
$1.49 |
$1.45 |
$2.50 |
$1.80 |
$1.55 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,138 | TON |
$22.00 |
$33.60 |
$26.25 |
$25.63 |
$40.00 |
$26.00 |
$45.50 |
| 18 | 407(B) 0250 |
TACK COAT | 5,224 | GAL |
$3.00 |
$3.00 |
$3.41 |
$3.32 |
$4.00 |
$3.30 |
$3.25 |
| 19 | 408 5774 |
PRIME COAT | 23,221 | GAL |
$5.00 |
$4.00 |
$1.00 |
$4.06 |
$4.50 |
$3.80 |
$4.00 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 10,334 | TON |
$75.00 |
$68.10 |
$79.34 |
$77.48 |
$90.00 |
$81.00 |
$78.00 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,257 | TON |
$81.00 |
$71.05 |
$85.95 |
$83.93 |
$100.00 |
$88.00 |
$84.00 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 179 | CY |
$275.00 |
$534.90 |
$341.60 |
$291.20 |
$400.00 |
$330.00 |
$285.00 |
| 23 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 90 | TON |
$64.00 |
$84.00 |
$37.35 |
$45.76 |
$55.00 |
$55.00 |
$65.00 |
| 24 | 611(G) 5709 |
INLET CDI RCP DES. 6 | 1 | EA |
$3,000.00 |
$4,680.00 |
$10,421.03 |
$10,176.40 |
$1,500.00 |
$4,900.00 |
$4,650.00 |
| 25 | 611(H) 5794 |
ADD'L DEPTH IN INLET CDI RCP DES. 6 | 3.5 | VF |
$300.00 |
$780.00 |
$223.65 |
$218.40 |
$120.00 |
$540.00 |
$780.00 |
| 26 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 78 | LF |
$140.00 |
$156.00 |
$213.53 |
$208.52 |
$200.00 |
$200.00 |
$185.00 |
| 27 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 120 | LF |
$30.00 |
$31.20 |
$31.00 |
$30.27 |
$50.00 |
$75.00 |
$37.00 |
| 28 | 613(B) 0696 |
60" CORR. GALV. STEEL PIPE | 246 | LF |
$300.00 |
$83.20 |
$114.53 |
$112.00 |
$200.00 |
$100.00 |
$100.00 |
| 29 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$15.00 |
$28.50 |
$21.13 |
$14.56 |
$20.00 |
$18.00 |
$26.00 |
| 30 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$15.00 |
$31.20 |
$41.22 |
$14.56 |
$20.00 |
$20.00 |
$26.00 |
| 31 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$2,500.00 |
$3,640.00 |
$3,248.25 |
$3,172.00 |
$3,000.00 |
$2,100.00 |
$3,650.00 |
| 32 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,800.00 |
$3,560.00 |
$1,102.31 |
$1,664.00 |
$2,500.00 |
$4,600.00 |
$930.00 |
| 33 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$20,800.00 |
$15,442.50 |
$15,080.00 |
$200,000.00 |
$9,900.00 |
$36,500.00 |
| 34 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 32,959 | SY |
$2.50 |
$2.45 |
$5.27 |
$3.50 |
$4.00 |
$3.50 |
$5.00 |
| 35 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,300 | LF |
$3.00 |
$4.65 |
$4.74 |
$3.12 |
$3.00 |
$4.80 |
$5.25 |
| 36 | 619(C) 0924 |
SAWING PAVEMENT | 2,397 | LF |
$2.00 |
$5.00 |
$3.39 |
$5.20 |
$5.00 |
$1.60 |
$5.25 |
| 37 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 500 | LF |
$20.00 |
$17.65 |
$18.11 |
$18.20 |
$20.00 |
$18.00 |
$17.70 |
| 38 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,800.00 |
$1,040.00 |
$1,065.00 |
$1,560.00 |
$950.00 |
$1,100.00 |
$1,050.00 |
| 39 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 6 | EA |
$2,600.00 |
$2,080.00 |
$2,130.00 |
$2,288.00 |
$2,500.00 |
$2,200.00 |
$2,200.00 |
| 40 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$2,000.00 |
$2,025.00 |
$2,076.75 |
$1,664.00 |
$1,800.00 |
$2,100.00 |
$3,450.00 |
| 41 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 291 | LF |
$6.00 |
$10.40 |
$3.20 |
$7.75 |
$5.00 |
$8.00 |
$8.00 |
| 42 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 2,654 | LF |
$7.00 |
$7.95 |
$2.13 |
$5.51 |
$5.00 |
$5.50 |
$8.25 |
| 43 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$12.00 |
$12.00 |
$13.10 |
$10.40 |
$20.00 |
$13.00 |
$13.00 |
| 44 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$4,400.00 |
$5,000.00 |
$10,117.50 |
$9,880.00 |
$10,000.00 |
$58,600.00 |
$25,000.00 |
| 45 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 12,259 | CY |
$6.00 |
$6.25 |
$9.59 |
$9.36 |
$6.00 |
$6.00 |
$8.00 |
| 46 | 202(D) 0184 |
UNCLASSIFIED BORROW | 198 | CY |
$8.20 |
$8.30 |
$9.59 |
$9.36 |
$15.00 |
$6.00 |
$10.25 |
| 47 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,800.00 |
$5,200.00 |
$26,625.00 |
$26,000.00 |
$5,000.00 |
$13,800.00 |
$16,000.00 |
| 48 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,020 | LF |
$2.00 |
$1.25 |
$1.29 |
$1.26 |
$1.50 |
$1.30 |
$1.75 |
| 49 | 232(B) 2814 |
SEEDING METHOD B | 2.52 | AC |
$350.00 |
$1,200.00 |
$1,278.00 |
$1,248.00 |
$1,500.00 |
$1,300.00 |
$1,250.00 |
| 50 | 233(E) 2822 |
EXCELSIOR MAT | 6,102 | SY |
$5.00 |
$0.9500 |
$1.00 |
$0.9800 |
$2.50 |
$1.00 |
$1.00 |
| 51 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 5,454 | LF |
$6.00 |
$7.95 |
$3.20 |
$9.36 |
$5.00 |
$8.00 |
$13.00 |
| 52 | 850(D) 8121 |
SPECIAL SIGNS | 18 | EA |
$100.00 |
$115.00 |
$118.22 |
$208.00 |
$400.00 |
$82.00 |
$520.00 |
| 53 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$20.00 |
$14.75 |
$16.29 |
$20.70 |
$10.00 |
$53.00 |
$65.00 |
| 54 | 501(G) 6309 |
CLSM BACKFILL | 206 | CY |
$200.00 |
$193.50 |
$173.39 |
$270.13 |
$150.00 |
$190.00 |
$210.00 |
| 55 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 2,394 | LF |
$230.00 |
$198.05 |
$280.50 |
$202.86 |
$210.00 |
$250.00 |
$250.00 |
| 56 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$250.00 |
$191.10 |
$188.83 |
$258.75 |
$135.00 |
$200.00 |
$165.00 |
| 57 | 504(B) 1305 |
SAW-CUT GROOVING | 2,940.4 | SY |
$5.00 |
$4.20 |
$3.83 |
$4.76 |
$3.00 |
$2.80 |
$3.75 |
| 58 | 504(C) 6250 |
SEALED EXPANSION JOINT | 129.6 | LF |
$350.00 |
$205.00 |
$229.84 |
$229.77 |
$200.00 |
$160.00 |
$245.00 |
| 59 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,323.4 | LF |
$95.00 |
$103.60 |
$101.49 |
$82.80 |
$90.00 |
$82.00 |
$65.00 |
| 60 | 506(A) 1322 |
STRUCTURAL STEEL | 2,700 | LB |
$3.00 |
$0.8500 |
$2.28 |
$2.17 |
$4.00 |
$2.10 |
$2.00 |
| 61 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 24 | EA |
$2,000.00 |
$1,235.00 |
$1,104.68 |
$1,398.28 |
$1,400.00 |
$1,000.00 |
$2,500.00 |
| 62 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 24 | EA |
$2,000.00 |
$1,140.00 |
$1,072.40 |
$1,398.28 |
$1,400.00 |
$960.00 |
$2,500.00 |
| 63 | 509(A) 1326 |
CLASS AA CONCRETE | 696 | CY |
$650.00 |
$761.35 |
$585.17 |
$583.74 |
$500.00 |
$670.00 |
$675.00 |
| 64 | 509(B) 1328 |
CLASS A CONCRETE | 328.6 | CY |
$650.00 |
$717.95 |
$696.53 |
$758.65 |
$500.00 |
$590.00 |
$750.00 |
| 65 | 509(D) 1331 |
CLASS C CONCRETE | 20 | CY |
$350.00 |
$549.75 |
$977.03 |
$507.15 |
$400.00 |
$400.00 |
$600.00 |
| 66 | 511(A) 1332 |
REINFORCING STEEL | 1,630 | LB |
$1.00 |
$1.20 |
$1.24 |
$1.22 |
$0.8000 |
$1.10 |
$2.00 |
| 67 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 203,870 | LB |
$1.10 |
$0.7500 |
$1.33 |
$1.22 |
$1.00 |
$0.7400 |
$1.20 |
| 68 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 20 | SY |
$400.00 |
$294.95 |
$123.94 |
$414.00 |
$65.00 |
$460.00 |
$650.00 |
| 69 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 20 | SY |
$700.00 |
$294.95 |
$262.13 |
$724.50 |
$85.00 |
$890.00 |
$800.00 |
| 70 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 248 | LF |
$40.00 |
$25.00 |
$24.76 |
$28.98 |
$25.00 |
$24.00 |
$35.00 |
| 71 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 820 | LF |
$50.00 |
$29.40 |
$29.21 |
$33.12 |
$40.00 |
$29.00 |
$43.00 |
| 72 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 248 | LF |
$20.00 |
$11.40 |
$30.96 |
$16.56 |
$30.00 |
$16.00 |
$15.00 |
| 73 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 820 | LF |
$20.00 |
$24.50 |
$26.47 |
$16.56 |
$30.00 |
$23.00 |
$16.00 |
| 74 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 75 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,642 | SY |
$5.00 |
$3.95 |
$4.05 |
$4.97 |
$4.00 |
$4.10 |
$4.00 |
| 76 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 464 | LF |
$1,100.00 |
$902.80 |
$761.77 |
$868.36 |
$750.00 |
$770.00 |
$1,325.00 |
| 77 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$5,000.00 |
$2,600.00 |
$3,727.50 |
$8,797.50 |
$3,000.00 |
$1,800.00 |
$2,000.00 |
| 78 | 523(A) 6550 |
SEALER CRACK PREPARATION | 81.6 | LF |
$5.00 |
$5.20 |
$5.33 |
$6.21 |
$7.00 |
$5.50 |
$5.25 |
| 79 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$150.00 |
$156.00 |
$159.75 |
$156.28 |
$170.00 |
$160.00 |
$155.00 |
| 80 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,700 | TON |
$50.00 |
$36.00 |
$37.35 |
$41.40 |
$40.00 |
$38.00 |
$40.00 |
| 81 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 620 | TON |
$40.00 |
$51.70 |
$28.64 |
$35.19 |
$30.00 |
$46.00 |
$37.00 |
| 82 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$68.50 |
$21.13 |
$31.05 |
$20.00 |
$78.00 |
$20.00 |
| 83 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 90 | LF |
$30.00 |
$26.60 |
$17.66 |
$31.05 |
$20.00 |
$36.00 |
$20.00 |
| 84 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$80,000.00 |
$136,300.00 |
$156,400.00 |
$51,750.00 |
$150,000.00 |
$200,000.00 |
$208,000.00 |
| 85 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$20.00 |
$12.10 |
$16.29 |
$20.70 |
$10.00 |
$44.00 |
$65.00 |
| 86 | 501(G) 6309 |
CLSM BACKFILL | 240.5 | CY |
$200.00 |
$187.65 |
$173.38 |
$270.13 |
$150.00 |
$180.00 |
$210.00 |
| 87 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,875 | LF |
$230.00 |
$203.65 |
$280.50 |
$267.03 |
$210.00 |
$260.00 |
$250.00 |
| 88 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 519 | LF |
$300.00 |
$248.55 |
$300.00 |
$302.22 |
$260.00 |
$310.00 |
$340.00 |
| 89 | 504(A) 1304 |
APPROACH SLAB | 309.4 | SY |
$250.00 |
$182.50 |
$188.83 |
$258.75 |
$135.00 |
$200.00 |
$165.00 |
| 90 | 504(B) 1305 |
SAW-CUT GROOVING | 2,972.4 | SY |
$5.00 |
$4.20 |
$3.83 |
$4.76 |
$3.00 |
$2.80 |
$3.75 |
| 91 | 504(C) 6250 |
SEALED EXPANSION JOINT | 137 | LF |
$350.00 |
$201.85 |
$229.82 |
$229.77 |
$200.00 |
$160.00 |
$245.00 |
| 92 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,337.2 | LF |
$95.00 |
$105.45 |
$103.21 |
$82.80 |
$90.00 |
$83.00 |
$65.00 |
| 93 | 506(A) 1322 |
STRUCTURAL STEEL | 3,870 | LB |
$3.00 |
$0.8500 |
$2.28 |
$2.17 |
$4.00 |
$2.00 |
$2.00 |
| 94 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 24 | EA |
$2,000.00 |
$1,245.00 |
$1,104.68 |
$1,491.43 |
$1,400.00 |
$1,000.00 |
$2,500.00 |
| 95 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 24 | EA |
$2,000.00 |
$1,160.00 |
$1,072.40 |
$1,491.43 |
$1,400.00 |
$960.00 |
$2,500.00 |
| 96 | 509(A) 1326 |
CLASS AA CONCRETE | 720 | CY |
$650.00 |
$694.90 |
$573.03 |
$583.74 |
$500.00 |
$630.00 |
$675.00 |
| 97 | 509(B) 1328 |
CLASS A CONCRETE | 369.6 | CY |
$650.00 |
$674.55 |
$693.45 |
$758.65 |
$500.00 |
$570.00 |
$750.00 |
| 98 | 509(D) 1331 |
CLASS C CONCRETE | 20 | CY |
$350.00 |
$549.80 |
$977.03 |
$507.15 |
$400.00 |
$400.00 |
$600.00 |
| 99 | 511(A) 1332 |
REINFORCING STEEL | 1,380 | LB |
$1.00 |
$1.20 |
$1.24 |
$1.22 |
$0.8000 |
$1.10 |
$2.00 |
| 100 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 224,580 | LB |
$1.10 |
$0.7700 |
$1.33 |
$1.22 |
$1.00 |
$0.7400 |
$1.10 |
| 101 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 248 | LF |
$40.00 |
$25.00 |
$24.76 |
$28.98 |
$25.00 |
$23.00 |
$35.00 |
| 102 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,036 | LF |
$50.00 |
$29.05 |
$28.84 |
$33.12 |
$40.00 |
$29.00 |
$43.00 |
| 103 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 248 | LF |
$20.00 |
$19.60 |
$30.96 |
$16.56 |
$30.00 |
$16.00 |
$15.00 |
| 104 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,036 | LF |
$20.00 |
$20.35 |
$26.04 |
$16.56 |
$30.00 |
$21.00 |
$16.00 |
| 105 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 106 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,729 | SY |
$5.00 |
$3.95 |
$4.05 |
$4.97 |
$4.00 |
$4.10 |
$4.00 |
| 107 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 684 | LF |
$1,100.00 |
$934.95 |
$764.94 |
$868.37 |
$750.00 |
$720.00 |
$1,115.00 |
| 108 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$5,000.00 |
$2,600.00 |
$3,727.50 |
$8,797.50 |
$3,000.00 |
$1,800.00 |
$2,000.00 |
| 109 | 523(A) 6550 |
SEALER CRACK PREPARATION | 86.4 | LF |
$5.00 |
$5.20 |
$5.33 |
$6.21 |
$7.00 |
$5.50 |
$5.25 |
| 110 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$150.00 |
$156.00 |
$159.75 |
$156.28 |
$200.00 |
$160.00 |
$155.00 |
| 111 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 3,320 | TON |
$50.00 |
$35.15 |
$37.35 |
$41.40 |
$40.00 |
$36.00 |
$40.00 |
| 112 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 735 | TON |
$40.00 |
$38.70 |
$28.64 |
$35.19 |
$30.00 |
$42.00 |
$37.00 |
| 113 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 90 | LF |
$30.00 |
$66.85 |
$21.13 |
$31.05 |
$20.00 |
$73.00 |
$20.00 |
| 114 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 80 | LF |
$30.00 |
$29.30 |
$17.68 |
$31.05 |
$20.00 |
$41.00 |
$20.00 |
| 115 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$60,000.00 |
$83,200.00 |
$92,700.00 |
$82,800.00 |
$250,000.00 |
$200,000.00 |
$100,000.00 |
| 116 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 500 | EA |
$0.6000 |
$1.05 |
$1.07 |
$1.04 |
$1.20 |
$1.00 |
$1.04 |
| 117 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 3,450 | LF |
$0.2000 |
$2.05 |
$2.13 |
$0.4200 |
$0.5000 |
$2.00 |
$2.05 |
| 118 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,720 | SD |
$0.3000 |
$0.1000 |
$0.1100 |
$0.5200 |
$0.6000 |
$0.1000 |
$0.5200 |
| 119 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 8,400 | SD |
$0.7000 |
$0.1000 |
$0.1100 |
$0.5200 |
$0.6000 |
$0.1000 |
$0.5200 |
| 120 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 8,400 | SD |
$1.50 |
$3.10 |
$3.20 |
$1.56 |
$1.60 |
$3.10 |
$3.10 |
| 121 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 7,980 | SD |
$0.9000 |
$0.1000 |
$0.1100 |
$2.08 |
$2.20 |
$0.1000 |
$1.04 |
| 122 | 880(C) 8848 |
WING BARRICADES | 1,680 | SD |
$1.00 |
$4.15 |
$4.26 |
$0.5200 |
$0.6000 |
$4.10 |
$4.15 |
| 123 | 880(D) 8854 |
VERTICAL PANELS | 81,480 | SD |
$0.1000 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0500 |
$0.0200 |
$0.0600 |
| 124 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 23,520 | SD |
$0.2500 |
$0.2000 |
$0.2100 |
$1.01 |
$1.10 |
$0.2000 |
$0.5200 |
| 125 | 880(F) 8878 |
DRUMS | 10,500 | SD |
$0.2000 |
$1.00 |
$1.07 |
$0.2100 |
$0.3000 |
$1.00 |
$1.05 |
| 126 | 880(G) 8890 |
CHANNELIZER CONES | 29,400 | SD |
$0.2500 |
$0.0500 |
$0.0500 |
$0.4700 |
$0.6000 |
$0.0500 |
$0.1700 |
| 127 | 880(I) 8902 |
FLAGGER | 90 | SD |
$135.00 |
$315.15 |
$545.97 |
$140.40 |
$45.00 |
$270.00 |
$425.00 |
| 128 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 868 | SD |
$13.00 |
$18.70 |
$19.17 |
$10.40 |
$12.00 |
$18.00 |
$18.74 |
| 129 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 13,600 | LF |
$0.2000 |
$0.7500 |
$0.3700 |
$0.1900 |
$0.6000 |
$0.2000 |
$0.4000 |
| 130 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 21 | SF |
$15.00 |
$22.90 |
$23.43 |
$26.00 |
$30.00 |
$21.00 |
$26.00 |
| 131 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 31 | LF |
$11.00 |
$10.40 |
$10.65 |
$10.40 |
$15.00 |
$21.00 |
$11.00 |
| 132 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 22,210 | LF |
$0.5000 |
$0.6500 |
$0.6400 |
$0.3600 |
$0.5000 |
$1.10 |
$0.6200 |
| 133 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$180,000.00 |
$75,000.00 |
$47,712.00 |
$46,592.00 |
$50,000.00 |
$47,800.00 |
$47,000.00 |
| 134 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$3,500.00 |
$677.69 |
$5,050.00 |
$3,500.00 |
$21,300.00 |
$2,007.00 |
| 135 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$7,500.00 |
$28,677.00 |
$14,140.00 |
$40,000.00 |
$34,900.00 |
$26,000.00 |
| 136 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$478,000.00 |
$600,950.00 |
$475,000.00 |
$407,805.25 |
$500,000.00 |
$595,000.00 |
$600,000.00 |