| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$263,175.00 |
$60,000.00 |
$800,000.00 |
$252,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 8,853 | CY |
$8.00 |
$8.22 |
$11.75 |
$15.00 |
$8.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 16,351 | CY |
$10.00 |
$19.95 |
$14.00 |
$25.00 |
$16.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$20,185.00 |
$40,000.00 |
$40,000.00 |
$69,100.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,700 | LF |
$1.85 |
$1.41 |
$1.00 |
$1.80 |
$1.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 300 | LF |
$7.90 |
$11.98 |
$3.00 |
$12.00 |
$13.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 23,570 | SY |
$1.80 |
$1.75 |
$2.25 |
$2.00 |
$1.90 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 5.62 | AC |
$500.00 |
$495.00 |
$990.00 |
$600.00 |
$530.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,476 | CY |
$52.00 |
$47.66 |
$70.00 |
$65.00 |
$55.00 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 11,181 | SY |
$1.30 |
$1.10 |
$1.25 |
$2.00 |
$1.80 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 100 | TON |
$35.00 |
$30.31 |
$35.00 |
$50.00 |
$36.00 |
| 12 | 407(B) 0250 |
TACK COAT | 1,841 | GAL |
$2.80 |
$4.95 |
$4.80 |
$6.00 |
$5.50 |
| 13 | 408 5774 |
PRIME COAT | 4,219 | GAL |
$5.00 |
$3.85 |
$3.70 |
$5.00 |
$4.20 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,828 | TON |
$81.00 |
$77.00 |
$74.00 |
$85.00 |
$83.00 |
| 15 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,396.5 | TON |
$90.00 |
$97.60 |
$91.50 |
$100.00 |
$100.00 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 50 | CY |
$310.00 |
$402.05 |
$250.00 |
$400.00 |
$760.00 |
| 17 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 236 | LF |
$33.00 |
$38.56 |
$35.00 |
$55.00 |
$88.00 |
| 18 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 8 | EA |
$1,120.00 |
$1,409.37 |
$1,500.00 |
$900.00 |
$4,200.00 |
| 19 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$16,500.00 |
$488,500.00 |
$800,000.00 |
$18,900.00 |
| 20 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,535 | SY |
$3.80 |
$5.50 |
$5.50 |
$6.00 |
$6.00 |
| 21 | 619(C) 0924 |
SAWING PAVEMENT | 65 | LF |
$10.00 |
$11.00 |
$7.50 |
$8.00 |
$17.00 |
| 22 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 512.5 | LF |
$17.50 |
$16.34 |
$16.00 |
$20.00 |
$17.00 |
| 23 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 1 | EA |
$1,750.00 |
$1,534.50 |
$1,500.00 |
$1,700.00 |
$1,300.00 |
| 24 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,800.00 |
$1,457.50 |
$1,500.00 |
$1,700.00 |
$1,900.00 |
| 25 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$2,400.00 |
$2,255.00 |
$2,200.00 |
$2,500.00 |
$2,600.00 |
| 26 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 240 | CY |
$22.50 |
$33.00 |
$50.00 |
$15.00 |
$43.00 |
| 27 | 501(G) 6309 |
CLSM BACKFILL | 148 | CY |
$145.00 |
$178.04 |
$150.00 |
$300.00 |
$150.00 |
| 28 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 5,984 | LF |
$265.00 |
$266.99 |
$277.46 |
$280.00 |
$270.00 |
| 29 | 504(B) 1305 |
SAW-CUT GROOVING | 4,639.6 | SY |
$3.90 |
$3.30 |
$3.25 |
$5.00 |
$7.00 |
| 30 | 504(C) 6250 |
SEALED EXPANSION JOINT | 211 | LF |
$280.00 |
$294.80 |
$240.00 |
$200.00 |
$260.00 |
| 31 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 3,077.2 | LF |
$75.00 |
$68.30 |
$50.00 |
$100.00 |
$77.00 |
| 32 | 506(A) 1322 |
STRUCTURAL STEEL | 12,020 | LB |
$2.30 |
$2.08 |
$2.50 |
$3.00 |
$1.90 |
| 33 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 48 | EA |
$850.00 |
$1,136.63 |
$1,500.00 |
$1,200.00 |
$1,500.00 |
| 34 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 48 | EA |
$990.00 |
$1,136.63 |
$1,500.00 |
$1,200.00 |
$1,600.00 |
| 35 | 509(A) 1326 |
CLASS AA CONCRETE | 1,597.8 | CY |
$545.00 |
$535.15 |
$400.00 |
$1,100.00 |
$890.00 |
| 36 | 509(B) 1328 |
CLASS A CONCRETE | 657.1 | CY |
$575.00 |
$535.15 |
$800.00 |
$1,100.00 |
$980.00 |
| 37 | 511(A) 1332 |
REINFORCING STEEL | 444,601 | LB |
$0.9500 |
$0.9600 |
$1.00 |
$1.40 |
$0.9100 |
| 38 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 218 | LF |
$33.50 |
$33.12 |
$40.00 |
$30.00 |
$21.00 |
| 39 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 878 | LF |
$40.00 |
$39.19 |
$45.00 |
$35.00 |
$27.00 |
| 40 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 218 | LF |
$16.50 |
$11.00 |
$13.00 |
$40.00 |
$24.00 |
| 41 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 878 | LF |
$17.00 |
$11.00 |
$13.00 |
$40.00 |
$43.00 |
| 42 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 43 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 1,387 | LF |
$1,100.00 |
$927.70 |
$1,800.00 |
$1,200.00 |
$1,000.00 |
| 44 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,000.00 |
$17,080.00 |
$10,000.00 |
$2,500.00 |
$930.00 |
| 45 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,100 | TON |
$38.00 |
$44.70 |
$50.00 |
$50.00 |
$52.00 |
| 46 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 300 | TON |
$35.00 |
$34.77 |
$35.00 |
$40.00 |
$61.00 |
| 47 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 64 | LF |
$28.00 |
$29.23 |
$30.00 |
$25.00 |
$85.00 |
| 48 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$26.00 |
$29.23 |
$30.00 |
$25.00 |
$90.00 |
| 49 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 50 | LF |
$30.00 |
$71.50 |
$20.00 |
$100.00 |
$6.50 |
| 50 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 12.64 | SF |
$20.00 |
$16.50 |
$20.00 |
$18.00 |
$23.00 |
| 51 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 30 | LF |
$10.00 |
$16.50 |
$20.00 |
$18.00 |
$17.00 |
| 52 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 18,300 | LF |
$0.5000 |
$0.9400 |
$0.8500 |
$1.00 |
$1.00 |
| 53 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 40 | LF |
$8.00 |
$11.00 |
$10.00 |
$12.00 |
$14.00 |
| 54 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 100 | EA |
$0.5000 |
$1.10 |
$1.00 |
$1.20 |
$1.20 |
| 55 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$6,600.00 |
$6,500.00 |
$15,000.00 |
$17,400.00 |
| 56 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$29,480.00 |
$57,500.00 |
$75,000.00 |
$61,000.00 |
| 57 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$6,050.00 |
$500.00 |
$25,000.00 |
$8,900.00 |
| 58 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$320,000.00 |
$340,323.52 |
$400,000.00 |
$473,000.00 |
|