| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 686 | CY |
$10.00 |
$10.00 |
$10.00 |
$10.10 |
$7.37 |
$10.80 |
$35.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 13,426 | CY |
$8.50 |
$12.00 |
$20.00 |
$14.60 |
$11.27 |
$10.80 |
$15.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$22,500.00 |
$20,000.00 |
$13,500.00 |
$31,560.15 |
$21,600.00 |
$25,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,550 | LF |
$1.80 |
$1.40 |
$1.22 |
$1.22 |
$1.30 |
$1.32 |
$1.22 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 154 | LF |
$8.00 |
$7.00 |
$6.15 |
$6.14 |
$6.54 |
$6.63 |
$6.14 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 26,179 | SY |
$2.10 |
$1.30 |
$1.05 |
$0.9600 |
$1.02 |
$1.04 |
$0.9600 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 5.4 | AC |
$350.00 |
$400.00 |
$150.00 |
$150.00 |
$159.62 |
$162.00 |
$150.00 |
| 8 | 241 2832 |
MOWING | 46 | AC |
$85.00 |
$95.00 |
$43.00 |
$42.00 |
$45.76 |
$46.44 |
$43.00 |
| 9 | 307(K) 4300 |
STABILIZED SUBGRADE | 4,297 | SY |
$6.00 |
$7.50 |
$13.00 |
$9.80 |
$15.57 |
$7.02 |
$12.98 |
| 10 | 407(B) 0250 |
TACK COAT | 34 | GAL |
$1.00 |
$6.85 |
$6.80 |
$6.80 |
$7.24 |
$7.34 |
$6.80 |
| 11 | 408 5774 |
PRIME COAT | 1,664 | GAL |
$5.00 |
$6.85 |
$6.80 |
$6.80 |
$7.24 |
$7.34 |
$6.80 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 584 | TON |
$100.00 |
$152.00 |
$143.25 |
$150.00 |
$156.86 |
$162.00 |
$143.25 |
| 13 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 1,608 | SY |
$22.00 |
$17.00 |
$27.00 |
$17.50 |
$16.38 |
$29.16 |
$41.00 |
| 14 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 2,412 | SY |
$28.00 |
$19.00 |
$32.50 |
$26.30 |
$20.50 |
$35.10 |
$47.00 |
| 15 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 1,014 | SY |
$50.00 |
$50.00 |
$60.00 |
$37.00 |
$40.04 |
$64.80 |
$175.00 |
| 16 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 979 | CY |
$145.00 |
$125.00 |
$135.00 |
$168.00 |
$134.65 |
$145.80 |
$100.00 |
| 17 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 15 | CY |
$25.00 |
$50.00 |
$20.00 |
$5.00 |
$156.53 |
$21.60 |
$5.00 |
| 18 | 509(A) 0319 |
CLASS AA CONCRETE | 104 | CY |
$500.00 |
$400.00 |
$340.00 |
$875.75 |
$666.05 |
$547.00 |
$875.75 |
| 19 | 511(A) 0332 |
REINFORCING STEEL | 14,783 | LB |
$1.00 |
$0.9000 |
$1.00 |
$0.9000 |
$1.53 |
$1.51 |
$0.9000 |
| 20 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 245 | TON |
$45.00 |
$35.00 |
$40.00 |
$56.70 |
$63.70 |
$59.40 |
$50.00 |
| 21 | 619(B) 0291 |
REMOVAL OF HEADWALL | 4 | EA |
$250.00 |
$1,350.00 |
$1,000.00 |
$1,500.00 |
$1,268.00 |
$1,080.00 |
$1,500.00 |
| 22 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 2,500 | SY |
$4.00 |
$6.00 |
$8.00 |
$6.00 |
$3.43 |
$8.64 |
$35.00 |
| 23 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 650 | SY |
$4.00 |
$4.00 |
$12.00 |
$5.00 |
$0.9700 |
$12.96 |
$10.00 |
| 24 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,209 | LF |
$3.00 |
$1.85 |
$2.25 |
$3.00 |
$3.41 |
$4.32 |
$3.00 |
| 25 | 619(C) 0924 |
SAWING PAVEMENT | 1,213 | LF |
$4.00 |
$3.50 |
$1.00 |
$4.00 |
$5.32 |
$4.32 |
$6.00 |
| 26 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 288 | LF |
$18.00 |
$18.00 |
$18.25 |
$18.25 |
$17.03 |
$22.14 |
$18.00 |
| 27 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,200.00 |
$2,275.00 |
$2,170.00 |
$2,170.00 |
$1,899.52 |
$2,376.00 |
$2,750.00 |
| 28 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,800.00 |
$2,600.00 |
$1,550.00 |
$1,550.00 |
$1,670.73 |
$1,674.00 |
$1,750.00 |
| 29 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 13 | EA |
$10.00 |
$13.00 |
$10.00 |
$10.00 |
$13.31 |
$16.20 |
$10.00 |
| 30 | 202(E) 0186 |
SELECT BORROW | 30 | CY |
$15.00 |
$50.00 |
$130.00 |
$50.00 |
$60.96 |
$77.70 |
$198.84 |
| 31 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$25.00 |
$50.00 |
$25.00 |
$10.00 |
$24.41 |
$16.65 |
$24.06 |
| 32 | 501(G) 6309 |
CLSM BACKFILL | 164 | CY |
$150.00 |
$105.00 |
$130.00 |
$166.00 |
$169.31 |
$162.04 |
$194.65 |
| 33 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 278 | LF |
$225.00 |
$260.00 |
$350.00 |
$328.00 |
$253.13 |
$305.79 |
$471.52 |
| 34 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 718 | LF |
$240.00 |
$215.00 |
$325.00 |
$291.00 |
$233.60 |
$294.12 |
$375.79 |
| 35 | 504(A) 1304 |
APPROACH SLAB | 225 | SY |
$195.00 |
$145.00 |
$175.00 |
$191.00 |
$221.06 |
$172.23 |
$258.52 |
| 36 | 504(B) 1305 |
SAW-CUT GROOVING | 1,326.5 | SY |
$5.00 |
$3.75 |
$3.60 |
$7.20 |
$3.83 |
$4.00 |
$3.60 |
| 37 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 597 | LF |
$85.00 |
$60.00 |
$75.00 |
$178.00 |
$109.25 |
$93.33 |
$101.41 |
| 38 | 506(A) 1322 |
STRUCTURAL STEEL | 1,500 | LB |
$4.00 |
$2.00 |
$2.50 |
$0.9000 |
$5.37 |
$4.32 |
$2.86 |
| 39 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$800.00 |
$400.00 |
$800.00 |
$429.00 |
$755.12 |
$1,590.48 |
$845.63 |
| 40 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 24 | EA |
$2,000.00 |
$1,585.00 |
$2,000.00 |
$1,610.00 |
$1,627.77 |
$2,758.79 |
$2,615.37 |
| 41 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 24 | EA |
$400.00 |
$335.00 |
$325.00 |
$632.00 |
$525.94 |
$518.81 |
$550.94 |
| 42 | 509(A) 1326 |
CLASS AA CONCRETE | 368.9 | CY |
$600.00 |
$500.00 |
$525.00 |
$764.00 |
$749.06 |
$601.04 |
$1,085.58 |
| 43 | 509(B) 1328 |
CLASS A CONCRETE | 192.6 | CY |
$650.00 |
$625.00 |
$525.00 |
$804.00 |
$613.12 |
$793.07 |
$905.90 |
| 44 | 509(D) 1331 |
CLASS C CONCRETE | 8.6 | CY |
$500.00 |
$550.00 |
$1,200.00 |
$716.00 |
$951.69 |
$410.93 |
$693.31 |
| 45 | 510(C) 6138 |
SLOPE WALL (5") | 781 | SY |
$90.00 |
$90.00 |
$80.00 |
$84.80 |
$144.43 |
$91.37 |
$189.24 |
| 46 | 511(A) 1332 |
REINFORCING STEEL | 850 | LB |
$1.00 |
$1.10 |
$1.75 |
$1.40 |
$1.87 |
$1.31 |
$1.48 |
| 47 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 116,260 | LB |
$1.25 |
$1.10 |
$1.10 |
$1.40 |
$1.22 |
$1.07 |
$1.45 |
| 48 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 600 | LF |
$35.00 |
$28.00 |
$22.00 |
$34.80 |
$34.08 |
$43.01 |
$52.31 |
| 49 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 600 | LF |
$15.00 |
$8.00 |
$18.00 |
$26.70 |
$27.52 |
$11.10 |
$7.53 |
| 50 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 51 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,222 | SY |
$4.00 |
$3.65 |
$3.50 |
$5.70 |
$3.73 |
$3.33 |
$3.50 |
| 52 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 202 | LF |
$900.00 |
$700.00 |
$550.00 |
$660.00 |
$709.13 |
$660.14 |
$1,263.78 |
| 53 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 90 | LF |
$1,000.00 |
$925.00 |
$825.00 |
$935.00 |
$921.97 |
$870.55 |
$1,592.44 |
| 54 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$2,000.00 |
$2,925.00 |
$1,800.00 |
$1,800.00 |
$2,128.31 |
$3,940.50 |
$4,027.08 |
| 55 | 523(A) 6550 |
SEALER CRACK PREPARATION | 244.5 | LF |
$4.00 |
$4.10 |
$4.00 |
$7.20 |
$4.26 |
$3.33 |
$4.00 |
| 56 | 523(B) 6560 |
SEALER RESIN | 2.7 | GAL |
$100.00 |
$105.00 |
$100.00 |
$143.00 |
$106.41 |
$111.00 |
$100.00 |
| 57 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 196 | LF |
$20.00 |
$18.00 |
$55.00 |
$34.20 |
$35.48 |
$29.50 |
$35.65 |
| 58 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$20.00 |
$18.00 |
$55.00 |
$29.00 |
$52.90 |
$29.50 |
$39.80 |
| 59 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$75,000.00 |
$99,000.00 |
$75,000.00 |
$48,510.00 |
$245,000.00 |
$260,212.86 |
$300,000.00 |
| 60 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 220 | TON |
$34.00 |
$30.00 |
$45.00 |
$41.40 |
$41.52 |
$28.89 |
$45.00 |
| 61 | 509(A) 0319 |
CLASS AA CONCRETE | 15.94 | CY |
$464.00 |
$310.00 |
$255.00 |
$508.00 |
$319.25 |
$440.00 |
$400.00 |
| 62 | 509(D) 0325 |
CLASS C CONCRETE | 13.66 | CY |
$272.00 |
$360.00 |
$275.00 |
$260.00 |
$383.20 |
$385.00 |
$628.88 |
| 63 | 511(A) 0332 |
REINFORCING STEEL | 562 | LB |
$1.00 |
$0.7500 |
$1.50 |
$0.6500 |
$1.84 |
$2.20 |
$1.59 |
| 64 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 1,000 | LF |
$10.00 |
$7.10 |
$2.55 |
$8.50 |
$7.29 |
$9.35 |
$8.50 |
| 65 | 628 5180 |
INSTALLATION OF CABLE BARRIER SYSTEM | 1,000 | LF |
$13.70 |
$7.95 |
$8.00 |
$15.00 |
$8.14 |
$16.50 |
$15.00 |
| 66 | 628(C) 5110 |
END ANCHORS | 2 | EA |
$1,500.00 |
$4,665.00 |
$1,150.00 |
$7,500.00 |
$4,788.69 |
$8,250.00 |
$7,500.00 |
| 67 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 500 | LF |
$0.5000 |
$8.30 |
$4.00 |
$4.00 |
$8.52 |
$4.40 |
$4.00 |
| 68 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 50 | LF |
$8.00 |
$15.55 |
$25.00 |
$25.00 |
$15.97 |
$27.50 |
$25.00 |
| 69 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 50 | LF |
$0.1500 |
$10.40 |
$2.00 |
$2.00 |
$10.64 |
$2.20 |
$2.00 |
| 70 | 870(A) 8011 |
SAND FILLED IMPACT ATTENUATION MODULE | 38 | EA |
$400.00 |
$300.00 |
$322.00 |
$322.00 |
$308.61 |
$354.20 |
$322.00 |
| 71 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 360 | SD |
$12.00 |
$6.20 |
$10.00 |
$10.00 |
$6.39 |
$11.00 |
$10.00 |
| 72 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 600 | LF |
$22.00 |
$16.00 |
$25.00 |
$25.00 |
$28.20 |
$38.50 |
$25.00 |
| 73 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 600 | LF |
$4.00 |
$3.00 |
$3.50 |
$3.00 |
$3.19 |
$5.50 |
$3.50 |
| 74 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 1,080 | SD |
$4.00 |
$1.05 |
$0.5000 |
$0.5000 |
$1.06 |
$0.5500 |
$0.5000 |
| 75 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,880 | SD |
$0.2500 |
$0.4100 |
$0.5000 |
$0.5000 |
$0.4300 |
$0.5500 |
$0.5000 |
| 76 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,320 | SD |
$0.7500 |
$0.4100 |
$0.5000 |
$0.5000 |
$0.4300 |
$0.5500 |
$0.5000 |
| 77 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,400 | SD |
$1.50 |
$0.4100 |
$0.5000 |
$0.5000 |
$0.4300 |
$0.5500 |
$0.5000 |
| 78 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,680 | SD |
$0.5500 |
$0.2600 |
$0.2500 |
$0.2500 |
$0.2700 |
$0.2800 |
$0.2500 |
| 79 | 880(C) 8848 |
WING BARRICADES | 3,240 | SD |
$1.20 |
$0.0600 |
$0.2500 |
$0.2500 |
$0.0500 |
$0.2800 |
$0.2500 |
| 80 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,080 | SD |
$0.2500 |
$0.4100 |
$4.00 |
$4.00 |
$0.4300 |
$4.40 |
$4.00 |
| 81 | 880(F) 8878 |
DRUMS | 5,400 | SD |
$0.1700 |
$1.45 |
$0.2500 |
$0.2500 |
$1.49 |
$0.2800 |
$0.2500 |
| 82 | 880(G) 8890 |
CHANNELIZER CONES | 2,880 | SD |
$0.4000 |
$1.45 |
$0.2500 |
$0.2500 |
$1.49 |
$0.2800 |
$0.2500 |
| 83 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 300 | HOUR |
$65.00 |
$65.00 |
$63.00 |
$75.00 |
$79.81 |
$71.50 |
$62.91 |
| 84 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 360 | SD |
$15.00 |
$6.25 |
$10.00 |
$10.00 |
$6.39 |
$11.00 |
$10.00 |
| 85 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$9,000.00 |
$16,900.00 |
$6,860.00 |
$7,300.11 |
$10,800.00 |
$20,000.00 |
| 86 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,500.00 |
$1,808.00 |
$12,000.00 |
$7,500.00 |
$14,743.50 |
$2,750.00 |
$15,000.00 |
| 87 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$137,021.00 |
$219,000.00 |
$157,275.00 |
$250,000.00 |
$164,652.16 |
$350,000.00 |