| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$300,000.00 |
$157,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 11,568 | CY |
$7.50 |
$12.50 |
$8.93 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,119 | LF |
$2.00 |
$1.25 |
$1.63 |
| 4 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 3 | EA |
$232.14 |
$270.00 |
$78.75 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 56 | LF |
$8.30 |
$7.35 |
$8.40 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 16,903 | SY |
$1.85 |
$1.30 |
$1.23 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 5,398 | CY |
$50.00 |
$65.00 |
$64.05 |
| 8 | 310(B) 0149 |
SUBGRADE, METHOD B | 17,398 | SY |
$3.00 |
$2.00 |
$2.10 |
| 9 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 16,916 | SY |
$2.50 |
$2.20 |
$1.21 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 4,093 | TON |
$30.00 |
$32.00 |
$32.55 |
| 11 | 407(B) 0250 |
TACK COAT | 7,118 | GAL |
$3.25 |
$3.05 |
$3.68 |
| 12 | 408 5774 |
PRIME COAT | 9,909 | GAL |
$6.25 |
$6.05 |
$7.35 |
| 13 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 2,546 | TON |
$82.00 |
$94.00 |
$102.90 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,259 | TON |
$71.00 |
$87.00 |
$80.85 |
| 15 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 2,648 | TON |
$95.00 |
$112.00 |
$110.25 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 256 | TON |
$85.00 |
$155.00 |
$100.80 |
| 17 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$275.00 |
$300.00 |
$367.50 |
| 18 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 2 | EA |
$3,000.00 |
$2,150.00 |
$4,725.00 |
| 19 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 440 | LF |
$50.00 |
$40.00 |
$18.90 |
| 20 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 976 | LF |
$54.00 |
$49.50 |
$31.50 |
| 21 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 300 | LF |
$14.50 |
$25.00 |
$18.90 |
| 22 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$13.50 |
$14.00 |
$10.50 |
| 23 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$750.00 |
$350.00 |
$1,575.00 |
| 24 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 13 | EA |
$500.00 |
$215.00 |
$682.50 |
| 25 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 725 | CY |
$45.00 |
$40.00 |
$57.75 |
| 26 | 613(V) 1180 |
TRENCH EXCAVATION | 782 | CY |
$12.00 |
$4.60 |
$47.25 |
| 27 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,000.00 |
$6,575.00 |
$112,350.00 |
| 28 | 619(B) 4725 |
REMOVAL OF FENCE | 2,140 | LF |
$1.50 |
$2.15 |
$2.10 |
| 29 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 122 | SY |
$10.00 |
$11.00 |
$12.60 |
| 30 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 9,932 | SY |
$3.75 |
$5.10 |
$9.45 |
| 31 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 861 | LF |
$5.00 |
$4.35 |
$2.26 |
| 32 | 619(C) 0924 |
SAWING PAVEMENT | 8,208 | LF |
$3.50 |
$3.00 |
$2.36 |
| 33 | 623 0100 |
(PL)GUARDRAIL CURBING | 2 | EA |
$500.00 |
$1,500.00 |
$635.15 |
| 34 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 2,357 | LF |
$20.00 |
$16.00 |
$16.28 |
| 35 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$1,000.00 |
$1,450.00 |
$682.50 |
| 36 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,100.00 |
$2,150.00 |
$1,958.25 |
| 37 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 3 | EA |
$1,500.00 |
$2,075.00 |
$1,417.50 |
| 38 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,142 | LF |
$4.50 |
$4.00 |
$3.99 |
| 39 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 55 | EA |
$12.00 |
$6.00 |
$10.50 |
| 40 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$33.00 |
$60.00 |
$16.50 |
| 41 | 501(G) 6309 |
CLSM BACKFILL | 208 | CY |
$165.00 |
$145.00 |
$147.27 |
| 42 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 10,365.3 | LF |
$263.00 |
$205.00 |
$238.95 |
| 43 | 504(A) 1304 |
APPROACH SLAB | 273.4 | SY |
$190.00 |
$158.00 |
$155.94 |
| 44 | 504(B) 1305 |
SAW-CUT GROOVING | 11,238.2 | SY |
$4.30 |
$2.90 |
$3.14 |
| 45 | 504(C) 6250 |
SEALED EXPANSION JOINT | 351 | LF |
$265.00 |
$235.00 |
$232.16 |
| 46 | 504(E) 6190 |
42" F-SHAPED PARAPET | 5,323.3 | LF |
$90.00 |
$59.00 |
$78.92 |
| 47 | 506(A) 1322 |
STRUCTURAL STEEL | 11,710 | LB |
$3.20 |
$2.00 |
$3.53 |
| 48 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 72 | EA |
$2,767.59 |
$1,900.00 |
$2,845.55 |
| 49 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 136 | EA |
$2,600.00 |
$1,900.00 |
$2,845.55 |
| 50 | 509(A) 1326 |
CLASS AA CONCRETE | 2,950.8 | CY |
$515.00 |
$450.00 |
$612.12 |
| 51 | 509(B) 1328 |
CLASS A CONCRETE | 1,258 | CY |
$550.00 |
$650.00 |
$553.66 |
| 52 | 511(A) 1332 |
REINFORCING STEEL | 10,180 | LB |
$1.10 |
$1.25 |
$1.06 |
| 53 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 927,690 | LB |
$1.10 |
$1.10 |
$1.16 |
| 54 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 216 | LF |
$35.00 |
$34.00 |
$38.11 |
| 55 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 704 | LF |
$35.00 |
$48.00 |
$44.97 |
| 56 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 216 | LF |
$15.00 |
$8.00 |
$13.20 |
| 57 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 704 | LF |
$15.50 |
$10.00 |
$13.20 |
| 58 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 59 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 13,350 | SY |
$3.90 |
$3.60 |
$3.30 |
| 60 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 1,978 | LF |
$750.00 |
$975.00 |
$609.39 |
| 61 | 516(A) 6097 |
DRILLED SHAFTS 66" DIAMETER | 773 | LF |
$780.00 |
$1,000.00 |
$684.63 |
| 62 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 10 | EA |
$1,800.00 |
$2,800.00 |
$4,138.48 |
| 63 | 523(A) 6550 |
SEALER CRACK PREPARATION | 656 | LF |
$5.00 |
$4.10 |
$4.40 |
| 64 | 523(B) 6560 |
SEALER RESIN | 9 | GAL |
$200.00 |
$105.00 |
$110.00 |
| 65 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,030 | TON |
$50.00 |
$37.00 |
$48.16 |
| 66 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 205 | TON |
$40.00 |
$32.00 |
$40.65 |
| 67 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 82 | LF |
$31.00 |
$14.00 |
$30.61 |
| 68 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$30.00 |
$14.00 |
$31.55 |
| 69 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$350,000.00 |
$600,000.00 |
$457,600.00 |
| 70 | 513(A) 6018 |
CLASS A BRIDGE DECK REPAIR | 200 | SY |
$200.00 |
$200.00 |
$357.00 |
| 71 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 200 | SY |
$400.00 |
$200.00 |
$539.70 |
| 72 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 200 | SY |
$400.00 |
$350.00 |
$664.65 |
| 73 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 32,500 | LF |
$0.1200 |
$0.1200 |
$0.1200 |
| 74 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 32,500 | LF |
$0.2000 |
$0.1900 |
$0.1900 |
| 75 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 760 | SD |
$7.69 |
$6.15 |
$6.45 |
| 76 | 871(C) 8709 |
(SP) RELOCATION OF IMPACT ATTENUATOR | 1 | EA |
$1,500.00 |
$2,575.00 |
$2,687.50 |
| 77 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 4,950 | LF |
$16.52 |
$15.00 |
$17.58 |
| 78 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 4,950 | LF |
$3.50 |
$4.10 |
$5.05 |
| 79 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 81,320 | SD |
$0.2000 |
$0.2100 |
$0.2200 |
| 80 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 1,520 | SD |
$3.45 |
$3.05 |
$3.23 |
| 81 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 12,160 | SD |
$0.1800 |
$0.0400 |
$0.0300 |
| 82 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 28,120 | SD |
$0.3200 |
$0.0400 |
$0.0300 |
| 83 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 35,720 | SD |
$0.5200 |
$0.0400 |
$0.0300 |
| 84 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 14,440 | SD |
$0.2100 |
$7.15 |
$7.53 |
| 85 | 880(C) 8848 |
WING BARRICADES | 3,040 | SD |
$0.4000 |
$0.0400 |
$0.0300 |
| 86 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 64,600 | SD |
$0.0900 |
$0.0600 |
$0.0500 |
| 87 | 880(F) 8878 |
DRUMS | 82,080 | SD |
$0.0800 |
$0.0500 |
$0.0400 |
| 88 | 880(K) 8908 |
SURVEILLANCE TRAFFIC CONTROL | 760 | SD |
$150.00 |
$270.00 |
$284.88 |
| 89 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 18,240 | HOUR |
$59.78 |
$40.00 |
$75.25 |
| 90 | 882 8370 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 9,880 | SD |
$15.00 |
$12.25 |
$12.90 |
| 91 | 882 8372 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | 7,600 | SD |
$9.20 |
$9.25 |
$9.68 |
| 92 | 882 8374 |
(SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | 760 | SD |
$21.00 |
$20.50 |
$21.50 |
| 93 | 882 8376 |
(SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | 760 | SD |
$12.00 |
$12.25 |
$12.90 |
| 94 | 882 8378 |
(PL)SMART WORK ZONE SYSTEM SETUP | 1 | EA |
$25,000.00 |
$375,000.00 |
$129,000.00 |
| 95 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,520 | SD |
$12.69 |
$10.25 |
$10.75 |
| 96 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 8,784 | LF |
$0.6500 |
$0.5500 |
$0.1300 |
| 97 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$174.32 |
$130.00 |
$134.38 |
| 98 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 30,920 | LF |
$0.7000 |
$0.3700 |
$0.3900 |
| 99 | 509(A) 0319 |
CLASS AA CONCRETE | 85 | CY |
$526.00 |
$150.00 |
$155.88 |
| 100 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 2,400 | LF |
$12.02 |
$7.25 |
$7.74 |
| 101 | 628 5180 |
INSTALLATION OF CABLE BARRIER SYSTEM | 2,400 | LF |
$13.00 |
$6.50 |
$6.72 |
| 102 | 628(C) 5110 |
END ANCHORS | 2 | EA |
$1,351.99 |
$5,650.00 |
$5,912.50 |
| 103 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$60,000.00 |
$89,201.00 |
$95,594.38 |
| 104 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$2,609.00 |
$8,062.50 |
| 105 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$400,000.00 |
|
|
| 106 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 5,348 | CY |
$7.50 |
$12.50 |
$8.93 |
| 107 | 221(C) 2801 |
TEMPORARY SILT FENCE | 316 | LF |
$2.00 |
$1.50 |
$1.63 |
| 108 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$243.36 |
$270.00 |
$78.75 |
| 109 | 221(F) 0100 |
TEMPORARY SILT DIKE | 42 | LF |
$8.30 |
$8.00 |
$8.40 |
| 110 | 230(A) 2806 |
SOLID SLAB SODDING | 4,014 | SY |
$1.85 |
$1.30 |
$1.23 |
| 111 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,029 | CY |
$50.00 |
$65.00 |
$64.05 |
| 112 | 310(B) 0149 |
SUBGRADE, METHOD B | 4,050 | SY |
$3.00 |
$2.00 |
$2.10 |
| 113 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 3,665 | SY |
$2.50 |
$2.20 |
$1.21 |
| 114 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,771 | TON |
$30.00 |
$32.00 |
$32.55 |
| 115 | 407(B) 0250 |
TACK COAT | 1,035 | GAL |
$3.25 |
$3.05 |
$3.68 |
| 116 | 408 5774 |
PRIME COAT | 2,006 | GAL |
$6.25 |
$6.05 |
$7.35 |
| 117 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 379 | TON |
$82.00 |
$94.00 |
$102.90 |
| 118 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 839 | TON |
$71.00 |
$87.00 |
$80.85 |
| 119 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 244 | TON |
$95.00 |
$112.00 |
$110.25 |
| 120 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 33 | TON |
$85.00 |
$155.00 |
$100.80 |
| 121 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$275.00 |
$300.00 |
$367.50 |
| 122 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 150 | LF |
$14.50 |
$25.00 |
$18.90 |
| 123 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 15 | LF |
$13.50 |
$50.00 |
$10.50 |
| 124 | 619(B) 4725 |
REMOVAL OF FENCE | 195 | LF |
$1.50 |
$2.15 |
$2.10 |
| 125 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 117 | SY |
$10.00 |
$11.00 |
$12.60 |
| 126 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,824 | SY |
$3.75 |
$5.10 |
$7.35 |
| 127 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 560 | LF |
$5.00 |
$4.35 |
$2.26 |
| 128 | 619(C) 0924 |
SAWING PAVEMENT | 3,263 | LF |
$3.50 |
$3.00 |
$2.36 |
| 129 | 623 0100 |
(PL)GUARDRAIL CURBING | 1 | EA |
$500.00 |
$1,500.00 |
$635.15 |
| 130 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 388 | LF |
$20.00 |
$19.00 |
$16.28 |
| 131 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 1 | EA |
$2,100.00 |
$2,670.00 |
$1,958.25 |
| 132 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$1,500.00 |
$2,500.00 |
$1,417.50 |
| 133 | 624(A) 4281 |
FENCE-STYLE WWF | 97 | LF |
$5.00 |
$10.31 |
$10.50 |
| 134 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 66 | LF |
$4.50 |
$9.25 |
$9.45 |
| 135 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 12 | EA |
$12.00 |
$6.00 |
$10.50 |
| 136 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$33.00 |
$40.00 |
$16.50 |
| 137 | 501(G) 6309 |
CLSM BACKFILL | 208 | CY |
$165.00 |
$145.00 |
$158.27 |
| 138 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 10,365.3 | LF |
$263.00 |
$200.00 |
$238.95 |
| 139 | 504(A) 1304 |
APPROACH SLAB | 273.4 | SY |
$190.00 |
$158.00 |
$155.94 |
| 140 | 504(B) 1305 |
SAW-CUT GROOVING | 11,238.2 | SY |
$4.30 |
$2.90 |
$3.14 |
| 141 | 504(C) 6250 |
SEALED EXPANSION JOINT | 351 | LF |
$265.00 |
$235.00 |
$232.16 |
| 142 | 504(E) 6190 |
42" F-SHAPED PARAPET | 5,323.3 | LF |
$90.00 |
$59.00 |
$78.92 |
| 143 | 506(A) 1322 |
STRUCTURAL STEEL | 11,710 | LB |
$3.20 |
$2.00 |
$3.53 |
| 144 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 72 | EA |
$2,767.59 |
$1,800.00 |
$2,845.55 |
| 145 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 136 | EA |
$2,600.00 |
$1,800.00 |
$2,845.55 |
| 146 | 509(A) 1326 |
CLASS AA CONCRETE | 2,950.8 | CY |
$515.00 |
$435.00 |
$612.12 |
| 147 | 509(B) 1328 |
CLASS A CONCRETE | 1,258 | CY |
$550.00 |
$625.00 |
$553.66 |
| 148 | 511(A) 1332 |
REINFORCING STEEL | 10,180 | LB |
$1.10 |
$1.25 |
$1.06 |
| 149 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 927,690 | LB |
$1.10 |
$1.10 |
$1.16 |
| 150 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 216 | LF |
$35.00 |
$34.00 |
$38.11 |
| 151 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 704 | LF |
$35.00 |
$48.00 |
$44.97 |
| 152 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 216 | LF |
$15.00 |
$8.00 |
$13.20 |
| 153 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 704 | LF |
$15.50 |
$10.00 |
$13.20 |
| 154 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 155 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 13,350 | SY |
$3.90 |
$3.60 |
$3.30 |
| 156 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 1,986 | LF |
$750.00 |
$900.00 |
$609.64 |
| 157 | 516(A) 6097 |
DRILLED SHAFTS 66" DIAMETER | 773 | LF |
$780.00 |
$950.00 |
$684.79 |
| 158 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 10 | EA |
$1,800.00 |
$2,800.00 |
$4,138.48 |
| 159 | 523(A) 6550 |
SEALER CRACK PREPARATION | 656 | LF |
$5.00 |
$4.10 |
$4.40 |
| 160 | 523(B) 6560 |
SEALER RESIN | 9 | GAL |
$200.00 |
$150.00 |
$110.00 |
| 161 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,030 | TON |
$50.00 |
$35.00 |
$48.16 |
| 162 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 205 | TON |
$40.00 |
$30.00 |
$40.65 |
| 163 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 82 | LF |
$31.00 |
$14.00 |
$30.61 |
| 164 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$30.00 |
$14.00 |
$31.55 |
| 165 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$350,000.00 |
$400,000.00 |
$457,600.00 |