| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$12,000.00 |
$5,000.00 |
$31,000.00 |
$42,550.00 |
$62,000.00 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 595 | CY |
$15.00 |
$8.00 |
$16.00 |
$11.00 |
$18.40 |
$12.00 |
$20.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,150 | CY |
$9.00 |
$12.00 |
$10.00 |
$11.00 |
$11.50 |
$10.50 |
$20.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$17,000.00 |
$9,000.00 |
$8,625.00 |
$28,000.00 |
$15,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 692 | LF |
$3.00 |
$1.25 |
$1.34 |
$2.00 |
$1.63 |
$1.42 |
$1.50 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 3 | EA |
$250.00 |
$295.00 |
$220.00 |
$275.00 |
$230.00 |
$200.00 |
$400.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 112 | LF |
$8.00 |
$6.75 |
$7.00 |
$10.00 |
$9.20 |
$8.00 |
$1.50 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 7,850 | SY |
$2.50 |
$1.25 |
$1.18 |
$1.60 |
$1.61 |
$1.40 |
$1.50 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 1.7 | AC |
$650.00 |
$300.00 |
$288.00 |
$700.00 |
$920.00 |
$800.00 |
$400.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.7 | AC |
$630.00 |
$300.00 |
$288.00 |
$950.00 |
$1,035.00 |
$900.00 |
$400.00 |
| 11 | 241 2832 |
MOWING | 3.4 | AC |
$125.00 |
$89.00 |
$100.00 |
$130.00 |
$56.35 |
$49.00 |
$100.00 |
| 12 | 310(B) 0149 |
SUBGRADE, METHOD B | 1,186 | SY |
$3.50 |
$3.00 |
$3.25 |
$6.00 |
$4.14 |
$4.00 |
$6.00 |
| 13 | 407(B) 0250 |
TACK COAT | 229 | GAL |
$6.00 |
$2.60 |
$2.75 |
$2.75 |
$2.88 |
$2.50 |
$9.00 |
| 14 | 408 5774 |
PRIME COAT | 571 | GAL |
$8.00 |
$9.35 |
$10.25 |
$10.25 |
$10.70 |
$9.30 |
$9.00 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 552 | TON |
$115.00 |
$95.00 |
$100.00 |
$87.75 |
$104.65 |
$91.00 |
$150.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 176 | TON |
$150.00 |
$125.00 |
$132.00 |
$128.75 |
$138.00 |
$120.00 |
$150.00 |
| 17 | 611(G) 5705 |
INLET CDI RCP DES. 2 | 2 | EA |
$3,200.00 |
$2,100.00 |
$3,000.00 |
$3,600.00 |
$3,376.86 |
$5,950.00 |
$1,500.00 |
| 18 | 611(G) 5707 |
INLET CDI RCP DES. 4 | 1 | EA |
$3,500.00 |
$3,100.00 |
$3,500.00 |
$4,700.00 |
$4,211.30 |
$4,950.00 |
$2,000.00 |
| 19 | 611(H) 5790 |
ADD'L DEPTH IN INLET CDI RCP DES. 2 | 11 | VF |
$200.00 |
$170.00 |
$290.00 |
$325.00 |
$222.69 |
$800.00 |
$50.00 |
| 20 | 611(H) 5792 |
ADD'L DEPTH IN INLET CDI RCP DES. 4 | 2 | VF |
$390.00 |
$205.00 |
$370.00 |
$360.00 |
$323.01 |
$800.00 |
$60.00 |
| 21 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 198 | LF |
$60.00 |
$60.00 |
$50.00 |
$65.00 |
$65.36 |
$60.00 |
$60.00 |
| 22 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 194 | LF |
$78.00 |
$95.00 |
$100.00 |
$85.00 |
$93.04 |
$115.00 |
$90.00 |
| 23 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 15 | LF |
$25.00 |
$45.00 |
$30.00 |
$50.00 |
$40.99 |
$100.00 |
$25.00 |
| 24 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 5 | LF |
$40.00 |
$45.00 |
$30.00 |
$100.00 |
$40.99 |
$100.00 |
$25.00 |
| 25 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$4,650.00 |
$5,000.00 |
$4,500.00 |
$5,750.00 |
$28,000.00 |
$25,000.00 |
| 26 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 539 | SY |
$10.00 |
$7.50 |
$5.00 |
$11.00 |
$24.15 |
$20.00 |
$20.00 |
| 27 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 590 | LF |
$5.00 |
$4.00 |
$3.50 |
$4.50 |
$2.82 |
$4.00 |
$3.00 |
| 28 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 192 | LF |
$22.00 |
$10.00 |
$7.50 |
$5.50 |
$28.75 |
$5.00 |
$15.00 |
| 29 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 153 | LF |
$10.00 |
$10.50 |
$11.00 |
$11.00 |
$11.50 |
$15.00 |
$12.00 |
| 30 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 166 | LF |
$10.00 |
$10.75 |
$11.25 |
$11.00 |
$11.79 |
$20.00 |
$14.00 |
| 31 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 6,720 | CY |
$15.00 |
$8.00 |
$6.00 |
$7.00 |
$13.80 |
$10.50 |
$20.00 |
| 32 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 490 | CY |
$20.00 |
$30.00 |
$15.00 |
$19.50 |
$17.25 |
$5.00 |
$20.00 |
| 33 | 509(A) 1326 |
CLASS AA CONCRETE | 1,141.6 | CY |
$450.00 |
$300.00 |
$420.00 |
$425.00 |
$473.97 |
$546.72 |
$580.00 |
| 34 | 511(A) 1332 |
REINFORCING STEEL | 167,840 | LB |
$0.9000 |
$0.8500 |
$0.9000 |
$1.00 |
$1.13 |
$0.9000 |
$1.20 |
| 35 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,550 | TON |
$50.00 |
$32.00 |
$36.00 |
$38.25 |
$41.66 |
$40.00 |
$48.00 |
| 36 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 320 | TON |
$45.00 |
$30.00 |
$30.00 |
$29.50 |
$34.17 |
$28.00 |
$35.00 |
| 37 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$17,500.00 |
$30,000.00 |
$27,500.00 |
$28,750.00 |
$84,000.00 |
$30,000.00 |
| 38 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 20,700 | SD |
$0.2500 |
$0.0600 |
$0.0700 |
$0.0500 |
$0.0600 |
$0.0500 |
$0.0700 |
| 39 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,600 | SD |
$0.5500 |
$0.1100 |
$0.1300 |
$0.1100 |
$0.1200 |
$0.1000 |
$0.1200 |
| 40 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,260 | SD |
$1.05 |
$0.1100 |
$0.1300 |
$0.1100 |
$0.1200 |
$0.1000 |
$0.1200 |
| 41 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 3,420 | SD |
$0.3500 |
$0.1100 |
$0.1300 |
$0.1100 |
$0.1200 |
$0.1000 |
$0.1200 |
| 42 | 880(C) 8848 |
WING BARRICADES | 360 | SD |
$0.9500 |
$0.1100 |
$0.1300 |
$0.1100 |
$0.1200 |
$0.1000 |
$0.1200 |
| 43 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,560 | SD |
$0.1700 |
$0.1100 |
$0.1300 |
$0.1100 |
$0.1200 |
$0.1000 |
$0.1200 |
| 44 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 28 | SD |
$11.25 |
$155.00 |
$155.00 |
$175.00 |
$172.50 |
$150.00 |
$200.00 |
| 45 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$500.00 |
$310.00 |
$350.00 |
$325.00 |
$345.00 |
$300.00 |
$350.00 |
| 46 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 27.5 | SF |
$16.95 |
$18.50 |
$20.00 |
$19.50 |
$20.70 |
$18.00 |
$20.00 |
| 47 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 55 | LF |
$8.40 |
$9.35 |
$10.00 |
$9.75 |
$10.35 |
$9.00 |
$12.00 |
| 48 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 4,800 | LF |
$0.4000 |
$1.30 |
$2.00 |
$1.40 |
$1.46 |
$1.27 |
$1.50 |
| 49 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$9,000.00 |
$4,000.00 |
$4,500.00 |
$9,500.00 |
$9,027.50 |
$6,500.00 |
$12,000.00 |
| 50 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$2,051.00 |
$2,000.00 |
$3,750.00 |
$2,875.00 |
$5,500.00 |
$3,500.00 |
| 51 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$83,000.00 |
$71,000.00 |
$60,000.00 |
$80,000.00 |
$90,214.97 |
$150,977.45 |
$60,000.00 |