Bid tab 140275

Let Sep 18, 2014 · Division 5 · Blaine Sign up free

‹ Sep 2014 results

GRADE, DRAIN, AND SURFACE COUNTY ROAD (NS-250): FROM 2.5 MILES EAST OF THE US-270/SH-58 JUNCTION, EXTEND SOUTH. PROJECT LENGTH = 3.990 MILES

Let date
Thursday, September 18, 2014
Contract
140275
J/P numbers
28692(04)
District
Division 5
County
Blaine
Highway
Limits
GRADE, DRAIN, AND SURFACE COUNTY ROAD (NS-250): FROM 2.5 MILES EAST OF THE US-270/SH-58 JUNCTION, EXTEND SOUTH. PROJECT LENGTH = 3.990 MILES
Project number
CIRB-206D(002)RB

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$3,353,602
1 HASKELL LEMON CONSTRUCTION CO. Low bidder $3,258,392 -2.8%
2 CORNELL CONSTRUCTION COMPANY, INC. $3,780,442 +12.7% +16.0%
3 THE CUMMINS CONSTRUCTION CO., INC. $4,492,042 +33.9% +37.9%

Bid tab: unit prices 51 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 HASKELL LEMON C…#2 CORNELL CONSTRU…#3 THE CUMMINS CON…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $20,000.00 $30,000.00 $50,386.29 $55,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION53,000CY $6.00 $7.50 $6.00 $10.00
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $25,000.00 $21,600.00 $15,000.00 $67,000.00
4221(C) 2801 TEMPORARY SILT FENCE10,809LF $1.25 $1.30 $1.19 $1.25
5221(E) 2804 TEMPORARY SEDIMENT BASIN2EA $550.00 $1,000.00 $1,500.00 $325.00
6221(F) 0100 TEMPORARY SILT DIKE1,240LF $8.50 $8.00 $6.03 $6.75
7230(A) 2806 SOLID SLAB SODDING89,631SY $2.50 $1.30 $1.19 $1.35
8233(A) 2817 VEGETATIVE MULCHING26.85AC $650.00 $200.00 $212.00 $390.00
9234(A) 4409 FERTILIZING (18-46-0)1.9TON $1,250.00 $1,100.00 $886.81 $2,100.00
10241 2832 MOWING53.7AC $100.00 $100.00 $68.00 $105.00
11303(A) 2100 AGGREGATE BASE TYPE A9,060CY $50.00 $64.25 $70.55 $75.00
12311(D) 0154 PROCESSING EXISTING BASE & SURFACE, METHOD D21,069LF $3.50 $4.00 $1.84 $6.25
13402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E555TON $30.00 $71.00 $59.31 $45.00
14407(B) 0250 TACK COAT4,049GAL $3.80 $2.50 $2.44 $5.00
15408 5774 PRIME COAT19,285GAL $4.80 $3.50 $2.50 $5.00
16411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)8,899TON $80.00 $77.40 $101.00 $95.00
17411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)6,235TON $90.00 $93.65 $107.79 $102.00
18509(A) 0319 CLASS AA CONCRETE136CY $450.00 $500.00 $514.71 $635.00
19509(D) 0325 CLASS C CONCRETE577CY $260.00 $230.00 $221.67 $231.00
20511(A) 0332 REINFORCING STEEL18,358LB $1.15 $1.20 $1.06 $1.10
21601(A) 0297 TYPE I PLAIN RIPRAP500TON $35.00 $50.00 $56.07 $42.00
22611(G) 5395 INLET CDI RCB DES. 91EA $3,000.00 $9,500.00 $3,950.58 $4,115.00
23611(G) 5706 INLET CDI RCP DES. 31EA $3,000.00 $3,000.00 $2,890.90 $3,100.00
24611(G) 5709 INLET CDI RCP DES. 61EA $3,000.00 $7,100.00 $3,286.69 $3,500.00
25611(H) 5791 ADD'L DEPTH IN INLET CDI RCP DES. 35VF $250.00 $540.00 $352.33 $367.00
26611(H) 5794 ADD'L DEPTH IN INLET CDI RCP DES. 68VF $250.00 $865.00 $417.88 $435.00
27613(A) 0492 24" R.C.PIPE CLASS III102LF $65.00 $54.00 $136.78 $79.50
28613(A) 0493 30" R.C.PIPE CLASS III172LF $80.00 $73.50 $146.00 $92.00
29613(A) 0494 36" R.C.PIPE CLASS III68LF $120.00 $106.00 $186.34 $112.00
30613(A) 0496 48" R.C.PIPE CLASS III228LF $125.00 $167.00 $250.72 $199.00
31613(B) 0689 18" CORR. GALV. STEEL PIPE308LF $25.00 $20.00 $31.68 $33.00
32613(B) 0690 24" CORR. GALV. STEEL PIPE512LF $28.00 $28.00 $31.18 $36.00
33613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH779LF $26.00 $20.00 $26.42 $32.00
34613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND4EA $700.00 $750.00 $900.00 $1,000.00
35613(L) 5732 30" PREFAB. CULVERT END SECTION, ROUND3EA $900.00 $975.00 $1,000.00 $1,200.00
36613(L) 5734 36" PREFAB. CULVERT END SECTION, ROUND2EA $1,150.00 $1,200.00 $1,532.70 $1,835.00
37613(L) 5738 48" PREFAB. CULVERT END SECTION, ROUND3EA $1,700.00 $2,000.00 $2,100.00 $2,500.00
38613(M) 7186 TYPE A4 CULVERT END TREATMENT30EA $885.00 $925.00 $793.00 $825.00
39613(M) 7187 TYPE B4 CULVERT END TREATMENT14EA $1,020.00 $1,050.00 $809.40 $850.00
40619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $9,600.00 $8,000.00 $8,491.58 $14,900.00
41619(B) 4725 REMOVAL OF FENCE4,080LF $1.50 $1.00 $0.4800 $5.60
42619(B) 4728 REMOVAL OF ASPHALT PAVEMENT51,326SY $2.50 $0.6500 $3.45 $6.15
43619(C) 0924 SAWING PAVEMENT73LF $5.90 $10.00 $1.55 $11.25
44624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)5,667LF $4.40 $4.50 $3.65 $5.60
45850(A) 8110 SHEET ALUMINUM SIGNS8SF $24.00 $55.00 $37.50 $39.00
46851(C) 8324 2" SQUARE TUBE POST20LF $10.00 $11.00 $10.00 $31.00
47855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)68,045LF $0.3500 $0.4500 $0.3900 $0.4500
48880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $15,000.00 $15,675.00 $14,053.08 $10,000.00
49642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $25,000.00 $10,000.00 $22,140.31 $11,710.00
50220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $8,000.00 $1,000.00 $953.24 $16,750.00
51641 1399 MOBILIZATION1LSUM $135,000.00 $35,000.00 $176,770.43 $323,500.00