| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,101 | CY |
$9.20 |
$11.00 |
$11.50 |
$20.77 |
$25.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 10,134 | CY |
$7.50 |
$13.00 |
$14.65 |
$20.77 |
$17.50 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 40,952 | LF |
$1.80 |
$1.18 |
$1.22 |
$2.46 |
$1.18 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 707 | LF |
$6.50 |
$7.33 |
$7.15 |
$6.66 |
$6.88 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 232,977 | SY |
$1.50 |
$0.9500 |
$1.12 |
$1.19 |
$1.08 |
| 6 | 232(B) 2814 |
SEEDING METHOD B | 24 | AC |
$500.00 |
$519.72 |
$507.50 |
$539.06 |
$488.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 7,872 | CY |
$47.00 |
$23.00 |
$56.20 |
$41.91 |
$53.50 |
| 8 | 307(K) 4300 |
STABILIZED SUBGRADE | 58,807 | SY |
$7.00 |
$3.00 |
$7.45 |
$5.15 |
$8.00 |
| 9 | 325 5271 |
SEPARATOR FABRIC | 38,791 | SY |
$1.20 |
$0.9000 |
$1.50 |
$0.9900 |
$1.75 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 4,752 | TON |
$25.00 |
$15.00 |
$27.00 |
$19.92 |
$27.00 |
| 11 | 407(B) 0250 |
TACK COAT | 2,947 | GAL |
$3.00 |
$3.67 |
$3.60 |
$3.79 |
$3.45 |
| 12 | 408 5774 |
PRIME COAT | 31,863 | GAL |
$3.95 |
$1.25 |
$4.50 |
$4.75 |
$1.50 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,398 | TON |
$78.00 |
$65.00 |
$74.15 |
$78.32 |
$71.29 |
| 14 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 4,612 | TON |
$90.00 |
$90.95 |
$88.80 |
$93.82 |
$85.40 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,033 | TON |
$88.00 |
$87.11 |
$85.05 |
$89.85 |
$81.79 |
| 16 | 412 5267 |
COLD MILLING PAVEMENT | 152,399 | SY |
$1.15 |
$3.85 |
$1.20 |
$1.02 |
$1.40 |
| 17 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 83,145 | SY |
$10.00 |
$6.00 |
$7.00 |
$6.46 |
$16.00 |
| 18 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 119,018 | SY |
$13.00 |
$8.30 |
$11.00 |
$10.67 |
$19.50 |
| 19 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 48,682 | CY |
$98.00 |
$67.30 |
$81.10 |
$100.22 |
$75.00 |
| 20 | 504(E) 6190 |
42" F-SHAPED PARAPET | 209 | LF |
$120.00 |
$293.34 |
$167.25 |
$134.28 |
$220.00 |
| 21 | 509(A) 0319 |
CLASS AA CONCRETE | 11 | CY |
$550.00 |
$650.00 |
$520.00 |
$578.05 |
$500.00 |
| 22 | 511(B) 4269 |
EPOXY COATED REINFORCING STEEL | 5,100 | LB |
$1.40 |
$1.47 |
$1.20 |
$0.8300 |
$1.25 |
| 23 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 2,360 | LF |
$40.00 |
$35.68 |
$33.30 |
$35.63 |
$45.00 |
| 24 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 487 | LF |
$14.00 |
$8.94 |
$34.55 |
$9.61 |
$20.00 |
| 25 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 163 | LF |
$14.00 |
$5.02 |
$34.55 |
$5.24 |
$20.00 |
| 26 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$550.00 |
$698.76 |
$1,175.00 |
$317.62 |
$750.00 |
| 27 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 647 | CY |
$40.00 |
$70.53 |
$30.00 |
$44.81 |
$30.00 |
| 28 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 9,098 | SY |
$7.15 |
$1.91 |
$5.10 |
$2.31 |
$6.25 |
| 29 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 30,924 | SY |
$2.95 |
$1.75 |
$2.85 |
$2.86 |
$4.45 |
| 30 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 3,522 | LF |
$3.00 |
$1.98 |
$3.10 |
$3.30 |
$2.98 |
| 31 | 619(C) 0924 |
SAWING PAVEMENT | 5,825 | LF |
$2.50 |
$1.91 |
$3.64 |
$1.58 |
$3.50 |
| 32 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 6,037.5 | LF |
$17.30 |
$16.88 |
$17.37 |
$17.41 |
$16.70 |
| 33 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 18 | EA |
$2,500.00 |
$2,076.75 |
$2,360.00 |
$2,142.25 |
$2,269.00 |
| 34 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 18 | EA |
$1,650.00 |
$1,592.18 |
$2,295.00 |
$1,642.39 |
$2,207.00 |
| 35 | 624(A) 4281 |
FENCE-STYLE WWF | 53,210 | LF |
$6.00 |
$5.00 |
$7.28 |
$7.63 |
$6.95 |
| 36 | 502(A) 6173 |
ENGINEERED FALSEWORK | 1 | LSUM |
$55,000.00 |
$80,407.50 |
$208,000.00 |
$225,472.26 |
$75,500.00 |
| 37 | 504(A) 1304 |
APPROACH SLAB | 168.6 | SY |
$180.00 |
$175.93 |
$239.20 |
$259.29 |
$250.00 |
| 38 | 504(B) 1305 |
SAW-CUT GROOVING | 541.3 | SY |
$4.50 |
$4.79 |
$3.95 |
$4.28 |
$4.50 |
| 39 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 81.4 | LF |
$32.00 |
$53.25 |
$26.00 |
$28.18 |
$50.00 |
| 40 | 505(E) 1000 |
HYDRODEMOLITION | 448.2 | SY |
$120.00 |
$234.30 |
$208.00 |
$225.48 |
$220.00 |
| 41 | 509(A) 1326 |
CLASS AA CONCRETE | 74.7 | CY |
$500.00 |
$1,171.50 |
$624.00 |
$676.42 |
$1,100.00 |
| 42 | 509(D) 1331 |
CLASS C CONCRETE | 63.2 | CY |
$262.00 |
$266.25 |
$260.00 |
$281.84 |
$300.00 |
| 43 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 26,450 | LB |
$1.15 |
$1.86 |
$2.08 |
$2.25 |
$1.75 |
| 44 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 160 | LF |
$40.00 |
$20.24 |
$19.76 |
$23.55 |
$19.00 |
| 45 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 16 | GAL |
$120.00 |
$90.53 |
$88.40 |
$105.36 |
$85.00 |
| 46 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 30 | SY |
$800.00 |
$479.25 |
$468.00 |
$557.82 |
$450.00 |
| 47 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 12 | SY |
$55.00 |
$40.47 |
$72.80 |
$112.73 |
$75.00 |
| 48 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$35,000.00 |
$10,650.00 |
$31,200.00 |
$33,820.84 |
$20,000.00 |
| 49 | 502(A) 6173 |
ENGINEERED FALSEWORK | 1 | LSUM |
$55,000.00 |
$80,407.50 |
$208,000.00 |
$225,472.26 |
$75,500.00 |
| 50 | 504(A) 1304 |
APPROACH SLAB | 168.6 | SY |
$180.00 |
$175.93 |
$239.20 |
$259.29 |
$250.00 |
| 51 | 504(B) 1305 |
SAW-CUT GROOVING | 541.3 | SY |
$4.50 |
$4.79 |
$3.95 |
$4.28 |
$4.50 |
| 52 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 81.4 | LF |
$32.00 |
$53.25 |
$26.00 |
$28.18 |
$50.00 |
| 53 | 505(E) 1000 |
HYDRODEMOLITION | 448.2 | SY |
$120.00 |
$234.30 |
$208.00 |
$225.48 |
$220.00 |
| 54 | 509(A) 1326 |
CLASS AA CONCRETE | 74.7 | CY |
$500.00 |
$1,171.50 |
$624.00 |
$676.42 |
$1,100.00 |
| 55 | 509(D) 1331 |
CLASS C CONCRETE | 63.2 | CY |
$262.00 |
$266.25 |
$260.00 |
$281.84 |
$300.00 |
| 56 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 26,450 | LB |
$1.15 |
$1.86 |
$2.08 |
$2.25 |
$1.75 |
| 57 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 160 | LF |
$40.00 |
$20.24 |
$19.76 |
$23.55 |
$19.00 |
| 58 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 16 | GAL |
$120.00 |
$90.53 |
$88.40 |
$105.36 |
$85.00 |
| 59 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 30 | SY |
$800.00 |
$479.25 |
$468.00 |
$557.82 |
$450.00 |
| 60 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 12 | SY |
$55.00 |
$40.47 |
$72.80 |
$112.73 |
$75.00 |
| 61 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$35,000.00 |
$10,650.00 |
$31,200.00 |
$33,820.84 |
$20,000.00 |
| 62 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 108,000 | LF |
$0.1700 |
$0.0500 |
$0.0800 |
$0.0500 |
$0.0800 |
| 63 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 19,200 | LF |
$0.6700 |
$0.2700 |
$0.7100 |
$0.2700 |
$0.6800 |
| 64 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 21,200 | EA |
$0.4700 |
$0.3200 |
$0.4600 |
$0.3300 |
$0.4400 |
| 65 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 27,000 | LF |
$0.3800 |
$0.2100 |
$0.1500 |
$0.2200 |
$0.1400 |
| 66 | 858(A) 8896 |
PAVEMENT MARKERS CLASS A TYPE 1-A | 1,920 | EA |
$1.30 |
$1.55 |
$2.08 |
$1.59 |
$2.00 |
| 67 | 858(A) 8899 |
PAVEMENT MARKERS CLASS A TYPE 1-B | 1,920 | EA |
$1.69 |
$1.62 |
$2.08 |
$1.65 |
$2.00 |
| 68 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 240 | SD |
$9.11 |
$5.38 |
$3.12 |
$5.49 |
$3.00 |
| 69 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 24,300 | LF |
$20.80 |
$34.00 |
$35.70 |
$19.01 |
$60.00 |
| 70 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 460 | SD |
$4.36 |
$1.08 |
$1.04 |
$1.10 |
$1.00 |
| 71 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,720 | SD |
$0.2300 |
$1.08 |
$1.25 |
$1.10 |
$1.20 |
| 72 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,140 | SD |
$0.5600 |
$2.15 |
$1.25 |
$2.20 |
$1.20 |
| 73 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 12,230 | SD |
$1.04 |
$3.23 |
$1.25 |
$3.30 |
$1.20 |
| 74 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 6,210 | SD |
$0.3500 |
$0.2700 |
$0.0500 |
$0.2700 |
$0.0500 |
| 75 | 880(C) 8848 |
WING BARRICADES | 920 | SD |
$0.9500 |
$0.5400 |
$0.0200 |
$0.5500 |
$0.0200 |
| 76 | 880(D) 8854 |
VERTICAL PANELS | 49,450 | SD |
$0.0900 |
$0.1100 |
$0.0200 |
$0.1100 |
$0.0200 |
| 77 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 17,750 | SD |
$0.1700 |
$0.0500 |
$0.4200 |
$0.0500 |
$0.4000 |
| 78 | 880(F) 8878 |
DRUMS | 29,900 | SD |
$0.1600 |
$0.2700 |
$0.0500 |
$0.2700 |
$0.0500 |
| 79 | 880(G) 8890 |
CHANNELIZER CONES | 9,920 | SD |
$0.1900 |
$0.5400 |
$0.2100 |
$0.5500 |
$0.2000 |
| 80 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 500 | HOUR |
$61.26 |
$55.00 |
$67.60 |
$60.43 |
$75.00 |
| 81 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 976 | SD |
$11.26 |
$3.23 |
$5.20 |
$3.30 |
$5.00 |
| 82 | 413(C) 4868 |
RUMBLE STRIP-METHOD PCC-CON | 106,000 | LF |
$0.2300 |
$0.2300 |
$0.3300 |
$0.2400 |
$0.2100 |
| 83 | 804(A) 2915 |
STRUCTURAL CONCRETE | 13.02 | CY |
$438.17 |
$188.26 |
$416.00 |
$192.25 |
$400.00 |
| 84 | 804(B) 2916 |
REINFORCING STEEL | 3,240 | LB |
$1.16 |
$0.8100 |
$1.30 |
$0.8200 |
$1.25 |
| 85 | 805(A) 8720 |
(PL)REMOVAL OF GROUND MOUNTED SIGNS | 1 | LSUM |
$6,188.55 |
$1,075.76 |
$1,300.00 |
$1,098.59 |
$1,250.00 |
| 86 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | EA |
$52.52 |
$1,075.76 |
$208.00 |
$1,098.59 |
$200.00 |
| 87 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 323 | SF |
$16.95 |
$11.83 |
$18.72 |
$12.08 |
$18.00 |
| 88 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 877.3 | SF |
$22.06 |
$19.36 |
$20.80 |
$19.77 |
$20.00 |
| 89 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 156 | LF |
$21.33 |
$19.36 |
$15.60 |
$19.77 |
$15.00 |
| 90 | 851(A) 3209 |
6"@25 GALV.STEEL WIDE FLANGE BEAM POST | 100.8 | LF |
$28.64 |
$25.82 |
$29.12 |
$26.36 |
$28.00 |
| 91 | 851(A) 3210 |
8"@31 GALV.STEEL WIDE FLANGE BEAM POST | 199.2 | LF |
$34.67 |
$30.12 |
$37.44 |
$30.76 |
$36.00 |
| 92 | 851(B) 3219 |
3 1/2"@9.11 GALV.STEEL PIPE POST | 56 | LF |
$21.77 |
$21.51 |
$19.76 |
$21.97 |
$19.00 |
| 93 | 851(C) 8324 |
2" SQUARE TUBE POST | 926 | LF |
$8.40 |
$2.15 |
$9.10 |
$2.20 |
$8.75 |
| 94 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 178 | LF |
$8.81 |
$7.53 |
$9.10 |
$7.69 |
$8.75 |
| 95 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 100 | EA |
$15.51 |
$13.45 |
$12.48 |
$13.73 |
$12.00 |
| 96 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 134,800 | LF |
$0.4800 |
$0.5400 |
$0.4600 |
$0.5500 |
$0.4400 |
| 97 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 800 | LF |
$0.9400 |
$0.8100 |
$1.04 |
$0.8200 |
$1.00 |
| 98 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 2,000 | LF |
$1.84 |
$1.08 |
$4.58 |
$1.10 |
$4.40 |
| 99 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,613 | TON |
$18.00 |
$28.90 |
$25.85 |
$24.17 |
$27.00 |
| 100 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 1,400 | LF |
$5.44 |
$6.00 |
$6.97 |
$7.74 |
$6.70 |
| 101 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 1,800 | LF |
$8.16 |
$9.89 |
$9.88 |
$10.98 |
$9.50 |
| 102 | 628(C) 5110 |
END ANCHORS | 8 | EA |
$1,724.54 |
$3,800.00 |
$2,600.00 |
$2,890.24 |
$2,500.00 |
| 103 | 628(F) 5185 |
(PL)HIGH TENSION CABLE BARRIER - RE-TENSIONING | 12 | EA |
$3,100.00 |
$117.90 |
$104.00 |
$115.61 |
$100.00 |
| 104 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$95,000.00 |
$75,000.00 |
$121,404.00 |
$32,551.27 |
$79,530.00 |
| 105 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$565.38 |
$8,400.00 |
$2,746.47 |
$20,000.00 |
| 106 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$585,500.00 |
$475,000.00 |
$560,000.00 |
$500,000.00 |
$528,189.00 |