| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$13,233.03 |
$30,000.00 |
$27,873.11 |
$30,000.00 |
$55,373.74 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 73,526 | CY |
$7.37 |
$6.00 |
$3.77 |
$5.25 |
$6.76 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,503.23 |
$70,000.00 |
$40,099.20 |
$43,000.00 |
$42,348.12 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,162 | LF |
$1.92 |
$2.50 |
$1.33 |
$1.50 |
$1.33 |
| 5 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$114.31 |
$400.00 |
$312.00 |
$331.00 |
$312.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 154 | LF |
$8.80 |
$10.00 |
$8.14 |
$8.75 |
$8.14 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 6 | CY |
$123.73 |
$200.00 |
$89.00 |
$95.00 |
$89.00 |
| 8 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 10 | CY |
$100.00 |
$300.00 |
$93.00 |
$98.50 |
$93.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 116,177 | SY |
$0.9100 |
$1.60 |
$1.31 |
$1.40 |
$1.31 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 22 | AC |
$547.39 |
$800.00 |
$518.00 |
$550.00 |
$518.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 22 | AC |
$537.72 |
$900.00 |
$508.00 |
$550.00 |
$508.00 |
| 12 | 241 2832 |
MOWING | 44 | AC |
$71.81 |
$100.00 |
$86.00 |
$91.50 |
$86.00 |
| 13 | 307(A) 4200 |
FLY ASH | 1,672 | TON |
$66.09 |
$76.00 |
$45.00 |
$81.50 |
$80.50 |
| 14 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 33,173 | SY |
$2.52 |
$1.85 |
$1.80 |
$2.25 |
$1.48 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 169 | TON |
$29.67 |
$31.50 |
$35.00 |
$53.00 |
$31.11 |
| 16 | 407(B) 0250 |
TACK COAT | 7,654 | GAL |
$2.26 |
$2.50 |
$2.25 |
$5.85 |
$3.49 |
| 17 | 408 5774 |
PRIME COAT | 8,860 | GAL |
$4.03 |
$7.00 |
$3.25 |
$5.75 |
$4.79 |
| 18 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 3,600 | TON |
$77.71 |
$81.00 |
$97.00 |
$94.00 |
$113.20 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 14,750 | TON |
$70.00 |
$71.00 |
$86.00 |
$88.00 |
$104.66 |
| 20 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 2,400 | TON |
$86.00 |
$91.00 |
$102.00 |
$105.00 |
$119.20 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,100 | TON |
$80.00 |
$81.00 |
$94.00 |
$96.00 |
$109.69 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 33.22 | CY |
$426.38 |
$2,000.00 |
$575.00 |
$901.00 |
$600.00 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 300 | CY |
$244.10 |
$250.00 |
$250.00 |
$335.00 |
$275.00 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 5,093.02 | LB |
$1.19 |
$1.00 |
$0.9200 |
$1.60 |
$1.00 |
| 25 | 611(G) 5707 |
INLET CDI RCP DES. 4 | 1 | EA |
$2,000.00 |
$2,700.00 |
$3,327.49 |
$3,550.00 |
$3,600.00 |
| 26 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$2,587.46 |
$2,300.00 |
$2,868.08 |
$3,100.00 |
$2,000.00 |
| 27 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 439 | LF |
$54.94 |
$30.00 |
$48.99 |
$52.00 |
$59.34 |
| 28 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 305 | LF |
$63.06 |
$40.00 |
$56.99 |
$60.50 |
$72.62 |
| 29 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 150 | LF |
$79.21 |
$100.00 |
$92.46 |
$98.00 |
$140.17 |
| 30 | 613(A) 4503 |
14" X 23" R.C.PIPE ELLIPTICAL CLASS HE-III | 56 | LF |
$80.00 |
$75.00 |
$67.74 |
$72.00 |
$111.23 |
| 31 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 167 | LF |
$28.00 |
$20.00 |
$38.06 |
$41.00 |
$39.57 |
| 32 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 11 | EA |
$948.18 |
$1,000.00 |
$1,500.00 |
$850.00 |
$1,200.00 |
| 33 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,309.28 |
$1,200.00 |
$2,000.00 |
$1,060.00 |
$1,300.00 |
| 34 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 1 | EA |
$1,286.93 |
$1,300.00 |
$2,250.00 |
$1,600.00 |
$1,400.00 |
| 35 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 1 | EA |
$1,562.80 |
$1,400.00 |
$2,500.00 |
$1,600.00 |
$1,500.00 |
| 36 | 613(M) 7202 |
TYPE BB6 CULVERT END TREATMENT | 2 | EA |
$2,417.00 |
$1,800.00 |
$3,200.00 |
$3,000.00 |
$2,500.00 |
| 37 | 613(P) 0760 |
18" GALV. STEEL CULVERT END SECTION ROUND | 4 | EA |
$50.00 |
$180.00 |
$611.28 |
$2,600.00 |
$349.33 |
| 38 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,095.42 |
$8,000.00 |
$15,000.00 |
$2,900.00 |
$4,446.92 |
| 39 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$1,167.09 |
$1,000.00 |
$1,500.00 |
$530.00 |
$1,611.72 |
| 40 | 619(B) 4725 |
REMOVAL OF FENCE | 7,100 | LF |
$1.10 |
$2.00 |
$1.00 |
$1.60 |
$1.00 |
| 41 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 38,276 | SY |
$2.58 |
$2.00 |
$5.00 |
$1.50 |
$5.74 |
| 42 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 6,244 | LF |
$4.21 |
$4.50 |
$3.35 |
$4.30 |
$3.35 |
| 43 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 7,800 | LF |
$0.2300 |
$0.2500 |
$0.2200 |
$0.2500 |
$0.3000 |
| 44 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 2,500 | EA |
$0.5300 |
$0.5000 |
$0.4400 |
$0.5000 |
$0.5000 |
| 45 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,000 | LF |
$0.3000 |
$0.2500 |
$0.2400 |
$0.2500 |
$0.3000 |
| 46 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 16,500 | SD |
$0.0700 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
| 47 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 15,000 | SD |
$0.3500 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.1000 |
| 48 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 10,500 | SD |
$0.5300 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.1000 |
| 49 | 880(C) 8836 |
CONSTRUCTION BARRICADES(TYPE II) | 3,000 | SD |
$1.00 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.2500 |
| 50 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 6,500 | SD |
$0.2000 |
$2.00 |
$2.00 |
$2.15 |
$2.00 |
| 51 | 880(C) 8848 |
WING BARRICADES | 3,240 | SD |
$0.2900 |
$0.0300 |
$0.0200 |
$0.0200 |
$0.1000 |
| 52 | 880(D) 8854 |
VERTICAL PANELS | 13,500 | SD |
$0.1200 |
$0.3500 |
$0.3500 |
$0.4000 |
$0.3500 |
| 53 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 28,500 | SD |
$0.0700 |
$0.0200 |
$0.0200 |
$0.0500 |
$0.1000 |
| 54 | 880(F) 8878 |
DRUMS | 5,000 | SD |
$0.0300 |
$0.5500 |
$0.5500 |
$0.6000 |
$1.00 |
| 55 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 13,965 | LF |
$0.3300 |
$0.1500 |
$0.1400 |
$0.1500 |
$0.2500 |
| 56 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,112.57 |
$1,100.00 |
$1,100.00 |
$1,200.00 |
$750.00 |
| 57 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 442 | SF |
$15.62 |
$19.00 |
$19.00 |
$21.00 |
$18.00 |
| 58 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 29.4 | LF |
$19.32 |
$19.00 |
$19.00 |
$21.00 |
$18.00 |
| 59 | 851(B) 3220 |
4"@10.79 GALV.STEEL PIPE POST | 74 | LF |
$40.00 |
$24.00 |
$24.00 |
$26.00 |
$20.00 |
| 60 | 851(C) 8324 |
2" SQUARE TUBE POST | 184 | LF |
$8.52 |
$9.00 |
$9.00 |
$10.00 |
$9.00 |
| 61 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 350 | LF |
$1.37 |
$1.00 |
$1.00 |
$1.10 |
$0.3800 |
| 62 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 94 | LF |
$2.65 |
$4.00 |
$4.00 |
$4.25 |
$5.00 |
| 63 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 39,000 | LF |
$0.3800 |
$0.4100 |
$0.4100 |
$0.6000 |
$0.3800 |
| 64 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 1 | EA |
$542.77 |
$834.00 |
$675.00 |
$720.00 |
$500.00 |
| 65 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$35,000.00 |
$37,200.00 |
$35,000.00 |
$15,819.02 |
| 66 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,075.37 |
$4,500.00 |
$12,000.00 |
$16,500.00 |
$1,159.14 |
| 67 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$147,240.57 |
$160,000.00 |
$202,000.00 |
$191,000.00 |
$238,767.49 |
| 68 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$42,247.55 |
$45,000.00 |
$42,200.00 |
$56,000.00 |
$42,200.00 |