| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$5,500.00 |
$4,611.57 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 235 | CY |
$10.00 |
$25.00 |
$19.25 |
$28.98 |
| 3 | 205(A) 4230 |
TYPE A-SALVAGED TOPSOIL | 639 | CY |
$5.00 |
$20.00 |
$18.00 |
$9.59 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,020 | LF |
$2.00 |
$2.00 |
$2.50 |
$3.29 |
| 5 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$200.00 |
$50.00 |
$70.25 |
$390.48 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 210 | LF |
$8.00 |
$10.00 |
$14.42 |
$22.26 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 202 | LF |
$2.00 |
$2.00 |
$2.15 |
$2.22 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 4,601 | SY |
$2.50 |
$1.60 |
$1.56 |
$1.61 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 0.95 | AC |
$450.00 |
$200.00 |
$210.60 |
$0.2200 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.95 | AC |
$400.00 |
$200.00 |
$195.00 |
$217.55 |
| 11 | 241 2832 |
MOWING | 1.9 | AC |
$75.00 |
$250.00 |
$250.00 |
$278.91 |
| 12 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$1,500.00 |
$2,500.00 |
$4,890.89 |
$2,044.98 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,052 | CY |
$45.00 |
$45.00 |
$36.40 |
$43.79 |
| 14 | 307(K) 4300 |
STABILIZED SUBGRADE | 5,011 | SY |
$7.00 |
$5.00 |
$5.25 |
$8.62 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 5,011 | SY |
$1.70 |
$1.50 |
$1.41 |
$2.65 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 262 | TON |
$26.00 |
$25.00 |
$34.40 |
$30.41 |
| 17 | 407(B) 0250 |
TACK COAT | 678 | GAL |
$3.00 |
$3.00 |
$3.00 |
$2.93 |
| 18 | 408 5774 |
PRIME COAT | 2,937 | GAL |
$5.00 |
$3.00 |
$4.75 |
$7.76 |
| 19 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 756 | TON |
$80.00 |
$60.00 |
$81.00 |
$85.18 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,266 | TON |
$75.00 |
$60.00 |
$70.00 |
$71.15 |
| 21 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 502 | TON |
$90.00 |
$80.00 |
$98.00 |
$100.53 |
| 22 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 30 | CY |
$15.00 |
$25.00 |
$25.00 |
$45.63 |
| 23 | 504(E) 6190 |
42" F-SHAPED PARAPET | 65 | LF |
$125.00 |
$180.00 |
$168.00 |
$175.13 |
| 24 | 509(B) 0321 |
CLASS A CONCRETE | 13.3 | CY |
$500.00 |
$400.00 |
$499.55 |
$526.57 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 30.78 | CY |
$280.00 |
$400.00 |
$603.08 |
$936.83 |
| 26 | 510(A) 6334 |
RETAINING WALL | 161.6 | SY |
$425.00 |
$750.00 |
$896.76 |
$988.09 |
| 27 | 511(A) 0332 |
REINFORCING STEEL | 2,140 | LB |
$1.00 |
$1.50 |
$0.9200 |
$0.9700 |
| 28 | 609(B) 1526 |
2'-8" COMB. CURB & GUTTER (8" BARRIER) | 184 | LF |
$25.00 |
$35.00 |
$37.99 |
$44.38 |
| 29 | 610(C) 0609 |
6" CONCRETE DIVIDING STRIP | 143 | SY |
$50.00 |
$55.00 |
$62.53 |
$68.60 |
| 30 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 1 | EA |
$2,000.00 |
$2,600.00 |
$2,609.89 |
$4,409.72 |
| 31 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 73 | LF |
$75.00 |
$100.00 |
$64.59 |
$108.20 |
| 32 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$850.00 |
$750.00 |
$579.27 |
$1,976.65 |
| 33 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$15,000.00 |
$9,665.27 |
$4,353.70 |
| 34 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,238 | SY |
$5.00 |
$6.00 |
$4.32 |
$4.49 |
| 35 | 619(B) 4821 |
REMOVAL OF CONCRETE SLOPE PROTECTION | 209 | SY |
$5.00 |
$8.00 |
$33.47 |
$15.71 |
| 36 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 40 | LF |
$10.00 |
$15.00 |
$16.39 |
$49.69 |
| 37 | 619(B) 6132 |
REMOVAL OF 6" CONCRETE DIVIDING STRIP | 88 | SY |
$5.00 |
$8.00 |
$27.56 |
$15.09 |
| 38 | 619(C) 0924 |
SAWING PAVEMENT | 1,497 | LF |
$2.50 |
$5.00 |
$2.94 |
$4.20 |
| 39 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 21.33 | SF |
$15.00 |
$17.00 |
$21.60 |
$23.86 |
| 40 | 851(C) 8324 |
2" SQUARE TUBE POST | 32 | LF |
$12.00 |
$14.00 |
$7.56 |
$8.35 |
| 41 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 1,537 | LF |
$1.25 |
$1.10 |
$0.7800 |
$0.8600 |
| 42 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 126 | LF |
$1.50 |
$1.40 |
$1.51 |
$1.67 |
| 43 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,640 | LF |
$1.50 |
$1.65 |
$2.70 |
$2.98 |
| 44 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 13 | LF |
$8.00 |
$5.50 |
$6.48 |
$7.16 |
| 45 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 6 | EA |
$300.00 |
$110.00 |
$108.00 |
$119.32 |
| 46 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 4 | EA |
$300.00 |
$110.00 |
$54.00 |
$59.66 |
| 47 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 2,610 | LF |
$0.7500 |
$1.10 |
$0.9700 |
$1.07 |
| 48 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,500 | LF |
$25.00 |
$2.00 |
$2.16 |
$2.39 |
| 49 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,837.5 | LF |
$5.00 |
$5.00 |
$19.33 |
$21.36 |
| 50 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 750 | SD |
$0.5000 |
$0.6000 |
$0.3700 |
$0.4100 |
| 51 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 540 | SD |
$1.25 |
$2.20 |
$1.08 |
$0.4100 |
| 52 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,290 | SD |
$2.00 |
$2.75 |
$0.5400 |
$1.19 |
| 53 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,290 | SD |
$0.5000 |
$0.4000 |
$0.5400 |
$0.6000 |
| 54 | 880(F) 8878 |
DRUMS | 1,630 | SD |
$0.3500 |
$0.6000 |
$0.8600 |
$0.9500 |
| 55 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 180 | HOUR |
$75.00 |
$60.00 |
$75.60 |
$100.41 |
| 56 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$5,000.00 |
$10,750.00 |
$16,901.88 |
| 57 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,500.00 |
$5,000.00 |
$7,500.00 |
$5,578.18 |
| 58 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$60,000.00 |
$55,000.00 |
$28,800.00 |
$43,369.31 |