| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$9,000.00 |
$11,333.00 |
$8,000.00 |
$20,000.00 |
$39,520.00 |
$9,500.00 |
$21,400.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$80,000.00 |
$55,000.00 |
$68,000.00 |
$68,000.00 |
$68,000.00 |
$72,650.00 |
$77,500.00 |
$73,000.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$3,000.00 |
$7,286.67 |
$9,000.00 |
$6,000.00 |
$8,860.00 |
$10,000.00 |
$6,500.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,000 | LF |
$3.00 |
$1.35 |
$1.15 |
$2.00 |
$1.55 |
$1.80 |
$1.55 |
$3.25 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 150 | LF |
$8.00 |
$4.00 |
$5.50 |
$10.00 |
$9.00 |
$5.10 |
$9.00 |
$11.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 15,000 | SY |
$2.00 |
$1.60 |
$1.76 |
$2.40 |
$1.60 |
$2.30 |
$1.60 |
$2.15 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.47 | AC |
$450.00 |
$400.00 |
$250.00 |
$1,000.00 |
$350.00 |
$550.00 |
$350.00 |
$975.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,241 | TON |
$25.00 |
$26.50 |
$30.72 |
$29.60 |
$31.00 |
$28.20 |
$38.00 |
$29.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$250.00 |
$100.00 |
$250.00 |
$250.00 |
$281.00 |
$200.00 |
$400.00 |
$355.00 |
| 10 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 973 | TON |
$20.00 |
$34.00 |
$37.75 |
$39.00 |
$43.00 |
$40.70 |
$50.00 |
$41.50 |
| 11 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 70 | LF |
$58.00 |
$90.00 |
$61.00 |
$45.15 |
$56.00 |
$74.70 |
$62.00 |
$60.00 |
| 12 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 136 | LF |
$38.00 |
$30.00 |
$25.00 |
$25.00 |
$25.50 |
$53.50 |
$32.00 |
$28.50 |
| 13 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$800.00 |
$1,000.00 |
$900.00 |
$1,200.00 |
$1,388.00 |
$1,460.00 |
$900.00 |
$1,200.00 |
| 14 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,650.00 |
$1,100.00 |
$1,534.50 |
$1,800.00 |
$1,395.00 |
$1,030.00 |
$1,100.00 |
$1,500.00 |
| 15 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,000.00 |
$1,182.50 |
$1,650.00 |
$1,075.00 |
$1,335.00 |
$1,000.00 |
$1,150.00 |
| 16 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 84 | CY |
$14.00 |
$30.00 |
$8.25 |
$12.00 |
$11.00 |
$10.00 |
$12.00 |
$13.80 |
| 17 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 82 | CY |
$15.00 |
$24.50 |
$11.08 |
$15.00 |
$41.00 |
$29.37 |
$55.00 |
$16.10 |
| 18 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 336.7 | LF |
$200.00 |
$240.00 |
$180.00 |
$182.00 |
$221.00 |
$220.26 |
$255.00 |
$205.00 |
| 19 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 235 | LF |
$68.00 |
$100.00 |
$70.33 |
$70.00 |
$90.00 |
$70.00 |
$80.00 |
$58.25 |
| 20 | 506(A) 1322 |
STRUCTURAL STEEL | 346 | LB |
$2.00 |
$2.00 |
$2.37 |
$3.00 |
$15.00 |
$2.50 |
$5.00 |
$5.00 |
| 21 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$900.00 |
$750.00 |
$700.00 |
$470.00 |
$803.00 |
$845.00 |
$600.00 |
$1,525.00 |
| 22 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$1,100.00 |
$750.00 |
$750.00 |
$490.00 |
$863.00 |
$845.00 |
$650.00 |
$1,240.00 |
| 23 | 509(A) 1326 |
CLASS AA CONCRETE | 66.2 | CY |
$465.00 |
$400.00 |
$531.67 |
$475.00 |
$674.00 |
$660.00 |
$600.00 |
$625.00 |
| 24 | 509(B) 1328 |
CLASS A CONCRETE | 53.8 | CY |
$450.00 |
$400.00 |
$568.33 |
$450.00 |
$668.00 |
$595.00 |
$675.00 |
$645.00 |
| 25 | 511(A) 1332 |
REINFORCING STEEL | 23,170 | LB |
$1.00 |
$1.00 |
$0.8600 |
$1.00 |
$0.8000 |
$1.05 |
$1.00 |
$1.15 |
| 26 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 698 | LF |
$30.00 |
$20.00 |
$25.90 |
$30.00 |
$36.00 |
$30.00 |
$33.00 |
$37.50 |
| 27 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 502 | LF |
$15.00 |
$10.00 |
$11.10 |
$15.00 |
$11.00 |
$10.25 |
$10.00 |
$11.50 |
| 28 | 514(K) 6260 |
(PL)PILOT HOLES | 195 | LF |
$130.00 |
$90.00 |
$96.00 |
$115.00 |
$104.00 |
$94.41 |
$125.00 |
$126.50 |
| 29 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,130 | TON |
$35.00 |
$32.00 |
$35.64 |
$35.00 |
$41.00 |
$37.70 |
$48.00 |
$43.30 |
| 30 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 305 | TON |
$35.00 |
$27.50 |
$30.21 |
$32.00 |
$36.00 |
$35.40 |
$38.00 |
$36.90 |
| 31 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$8,000.00 |
$5,600.00 |
$5,000.00 |
$3,000.00 |
$10,445.00 |
$8,500.00 |
$5,175.00 |
| 32 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$8,000.00 |
$3,000.00 |
$2,250.00 |
$3,500.00 |
$3,000.00 |
$2,000.00 |
$1,750.00 |
$2,000.00 |
| 33 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$250.00 |
$50.00 |
$550.00 |
$500.00 |
$50.00 |
$300.00 |
$500.00 |
$535.00 |
| 34 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 12.5 | SF |
$16.00 |
$15.00 |
$22.00 |
$25.00 |
$15.00 |
$15.00 |
$20.00 |
$21.40 |
| 35 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 30 | LF |
$9.00 |
$12.00 |
$11.00 |
$24.00 |
$12.00 |
$3.00 |
$10.00 |
$10.70 |
| 36 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$6,600.00 |
$7,850.00 |
$10,500.00 |
$10,000.00 |
$6,850.00 |
$8,800.00 |
| 37 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$2,500.00 |
$2,700.00 |
$3,000.00 |
$2,500.00 |
$1,200.00 |
$3,500.00 |
$3,745.00 |
| 38 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$20,000.00 |
$25,667.00 |
$29,000.00 |
$50,600.00 |
$30,000.00 |
$25,000.00 |
$44,250.00 |