| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$25,147.96 |
$55,310.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 21,633 | CY |
$4.00 |
$3.18 |
$3.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 68,116 | CY |
$5.00 |
$5.98 |
$5.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$24,599.19 |
$35,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,463 | LF |
$2.50 |
$1.36 |
$1.30 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 385 | LF |
$7.00 |
$8.90 |
$8.50 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 55,712 | SY |
$1.50 |
$1.45 |
$1.40 |
| 8 | 232(B) 2814 |
SEEDING METHOD B | 23.04 | AC |
$400.00 |
$890.40 |
$848.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 11.52 | AC |
$400.00 |
$890.40 |
$848.00 |
| 10 | 241 2832 |
MOWING | 23.04 | AC |
$100.00 |
$108.15 |
$103.00 |
| 11 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$3,000.00 |
$5,263.63 |
$2,500.00 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,388 | CY |
$35.00 |
$47.25 |
$82.89 |
| 13 | 307(K) 4300 |
STABILIZED SUBGRADE | 24,973 | SY |
$5.00 |
$6.83 |
$6.50 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 16,805 | SY |
$1.50 |
$2.10 |
$1.35 |
| 15 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 1,000 | SY |
$7.00 |
$3.25 |
$6.90 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,856 | TON |
$22.50 |
$34.84 |
$34.80 |
| 17 | 408 5774 |
PRIME COAT | 7,776 | GAL |
$4.50 |
$6.04 |
$5.95 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 6,287 | TON |
$62.00 |
$73.45 |
$72.20 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,517 | TON |
$70.00 |
$87.57 |
$86.45 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 500 | SY |
$4.00 |
$5.25 |
$21.20 |
| 21 | 509(D) 0325 |
CLASS C CONCRETE | 63 | CY |
$350.00 |
$349.07 |
$280.00 |
| 22 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 13 | TON |
$100.00 |
$87.74 |
$90.00 |
| 23 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 3 | TON |
$60.00 |
$77.42 |
$90.00 |
| 24 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 307 | SY |
$1.50 |
$6.21 |
$6.00 |
| 25 | 611(G) 5334 |
INLET GPI TYPE 2 (DES. 8) | 1 | EA |
$1,500.00 |
$3,439.80 |
$3,000.00 |
| 26 | 613(A) 0400 |
12" R.C.PIPE CLASS III | 61 | LF |
$40.00 |
$22.88 |
$50.00 |
| 27 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 58 | LF |
$50.00 |
$32.03 |
$58.00 |
| 28 | 613(B) 0688 |
12" CORR. GALV. STEEL PIPE | 94 | LF |
$25.00 |
$13.49 |
$28.00 |
| 29 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 49 | LF |
$30.00 |
$21.93 |
$34.00 |
| 30 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$800.00 |
$682.47 |
$750.00 |
| 31 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$4,410.00 |
$44,000.00 |
| 32 | 619(B) 4725 |
REMOVAL OF FENCE | 674 | LF |
$2.00 |
$1.05 |
$3.20 |
| 33 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 6,775 | SY |
$3.50 |
$3.31 |
$3.60 |
| 34 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 11,478 | SY |
$6.50 |
$4.52 |
$11.95 |
| 35 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,053 | LF |
$3.00 |
$1.58 |
$1.70 |
| 36 | 619(C) 0924 |
SAWING PAVEMENT | 1,280 | LF |
$2.50 |
$4.73 |
$1.60 |
| 37 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$800.00 |
$1,575.00 |
$800.00 |
| 38 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 687.5 | LF |
$20.00 |
$15.75 |
$15.80 |
| 39 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,000.00 |
$1,947.75 |
$2,175.00 |
| 40 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,500.00 |
$1,365.00 |
$1,525.00 |
| 41 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 292 | LF |
$6.50 |
$8.40 |
$4.27 |
| 42 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 201.7 | CY |
$20.00 |
$17.99 |
$10.00 |
| 43 | 501(G) 6309 |
CLSM BACKFILL | 213.9 | CY |
$125.00 |
$115.04 |
$130.00 |
| 44 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 956.1 | LF |
$200.00 |
$219.92 |
$205.00 |
| 45 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 478.7 | LF |
$275.00 |
$293.94 |
$280.00 |
| 46 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$175.00 |
$178.18 |
$160.00 |
| 47 | 504(B) 1305 |
SAW-CUT GROOVING | 1,879 | SY |
$5.00 |
$3.92 |
$4.00 |
| 48 | 504(C) 6250 |
SEALED EXPANSION JOINT | 83.2 | LF |
$275.00 |
$306.39 |
$350.00 |
| 49 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 845.8 | LF |
$75.00 |
$91.90 |
$60.00 |
| 50 | 506(A) 1322 |
STRUCTURAL STEEL | 2,565 | LB |
$3.50 |
$3.47 |
$2.50 |
| 51 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$2,500.00 |
$3,055.53 |
$4,000.00 |
| 52 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,500.00 |
$3,074.06 |
$4,000.00 |
| 53 | 509(A) 1326 |
CLASS AA CONCRETE | 452.4 | CY |
$400.00 |
$419.38 |
$450.00 |
| 54 | 509(B) 1328 |
CLASS A CONCRETE | 257.6 | CY |
$500.00 |
$400.64 |
$450.00 |
| 55 | 509(D) 1331 |
CLASS C CONCRETE | 9 | CY |
$500.00 |
$446.50 |
$300.00 |
| 56 | 511(A) 1332 |
REINFORCING STEEL | 1,110 | LB |
$0.9000 |
$1.70 |
$0.9000 |
| 57 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 139,695 | LB |
$1.00 |
$0.9300 |
$1.10 |
| 58 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 192 | LF |
$30.00 |
$33.06 |
$28.00 |
| 59 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 611 | LF |
$35.00 |
$39.57 |
$35.00 |
| 60 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 192 | LF |
$15.00 |
$10.36 |
$10.00 |
| 61 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 611 | LF |
$20.00 |
$10.36 |
$10.00 |
| 62 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,769 | SY |
$4.00 |
$3.49 |
$4.00 |
| 63 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 238 | LF |
$750.00 |
$649.21 |
$800.00 |
| 64 | 523(A) 6550 |
SEALER CRACK PREPARATION | 42.2 | LF |
$5.00 |
$3.27 |
$10.00 |
| 65 | 523(B) 6560 |
SEALER RESIN | 0.4 | GAL |
$250.00 |
$163.50 |
$150.00 |
| 66 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,084 | TON |
$40.00 |
$43.67 |
$45.00 |
| 67 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 316 | TON |
$40.00 |
$32.95 |
$45.00 |
| 68 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 86 | LF |
$20.00 |
$47.18 |
$50.00 |
| 69 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$20.00 |
$13.28 |
$50.00 |
| 70 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$86,000.00 |
$64,310.00 |
$85,000.00 |
| 71 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 14 | EA |
$75.00 |
$108.00 |
$37.35 |
| 72 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$150.00 |
$270.00 |
$80.00 |
| 73 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 74.68 | SF |
$18.00 |
$15.12 |
$24.00 |
| 74 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 139.75 | LF |
$10.00 |
$8.64 |
$10.00 |
| 75 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$30.00 |
$10.80 |
$5.30 |
| 76 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 18,550 | LF |
$0.6500 |
$0.5100 |
$0.3500 |
| 77 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 12,496 | LF |
$0.3500 |
$0.2200 |
$0.1500 |
| 78 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 2,075 | LF |
$0.8000 |
$0.8100 |
$0.7000 |
| 79 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 4,702 | LF |
$0.2500 |
$0.2200 |
$0.3500 |
| 80 | 877(A) 8483 |
PORTABLE LONGITUDINAL BARRIER | 25 | LF |
$75.00 |
$75.60 |
$69.50 |
| 81 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 10,830 | SD |
$0.5000 |
$0.0500 |
$0.5000 |
| 82 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,970 | SD |
$1.00 |
$0.2200 |
$0.5000 |
| 83 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,735 | SD |
$1.00 |
$1.35 |
$0.5000 |
| 84 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,920 | SD |
$0.2500 |
$0.1600 |
$0.4000 |
| 85 | 880(C) 8848 |
WING BARRICADES | 1,380 | SD |
$0.2500 |
$0.2700 |
$0.4000 |
| 86 | 880(C) 8850 |
PERMANENT BARRICADE UNIT | 2 | EA |
$500.00 |
$810.00 |
$850.00 |
| 87 | 880(D) 8854 |
VERTICAL PANELS | 20,520 | SD |
$0.1500 |
$0.0500 |
$0.0200 |
| 88 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 9,975 | SD |
$0.0500 |
$0.9200 |
$0.2500 |
| 89 | 880(F) 8878 |
DRUMS | 17,790 | SD |
$0.1000 |
$0.0500 |
$0.5000 |
| 90 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$75,000.00 |
$44,412.50 |
$34,750.00 |
| 91 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$13,500.00 |
$6,168.75 |
$10,700.00 |
| 92 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$15,500.00 |
$11,025.00 |
$8,000.00 |
| 93 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$297,903.11 |
$270,767.68 |
$181,000.00 |
| 94 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$3,000.00 |
$13,282.50 |
$18,500.00 |
| 95 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 18,816 | CY |
$4.00 |
$5.84 |
$5.75 |
| 96 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$6,263.25 |
$20,000.00 |
| 97 | 221(C) 2801 |
TEMPORARY SILT FENCE | 652 | LF |
$2.50 |
$1.36 |
$1.29 |
| 98 | 221(F) 0100 |
TEMPORARY SILT DIKE | 252 | LF |
$8.00 |
$8.90 |
$8.50 |
| 99 | 230(A) 2806 |
SOLID SLAB SODDING | 22,536 | SY |
$2.00 |
$1.45 |
$1.45 |
| 100 | 232(B) 2814 |
SEEDING METHOD B | 9.34 | AC |
$500.00 |
$890.40 |
$850.00 |
| 101 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.67 | AC |
$500.00 |
$890.40 |
$850.00 |
| 102 | 241 2832 |
MOWING | 9.34 | AC |
$100.00 |
$108.15 |
$105.00 |
| 103 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,148 | CY |
$40.00 |
$47.25 |
$83.00 |
| 104 | 307(K) 4300 |
STABILIZED SUBGRADE | 12,682 | SY |
$4.50 |
$6.83 |
$7.40 |
| 105 | 325 5271 |
SEPARATOR FABRIC | 5,908 | SY |
$1.00 |
$2.10 |
$1.60 |
| 106 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 615 | TON |
$25.00 |
$34.84 |
$42.00 |
| 107 | 408 5774 |
PRIME COAT | 3,580 | GAL |
$6.00 |
$6.14 |
$6.00 |
| 108 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,917 | TON |
$65.00 |
$73.13 |
$72.20 |
| 109 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,327 | TON |
$70.00 |
$90.30 |
$89.10 |
| 110 | 412 5267 |
COLD MILLING PAVEMENT | 300 | SY |
$4.00 |
$10.50 |
$35.50 |
| 111 | 509(D) 0325 |
CLASS C CONCRETE | 42 | CY |
$300.00 |
$349.07 |
$300.00 |
| 112 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 262 | LF |
$25.00 |
$21.92 |
$30.00 |
| 113 | 613(B) 5739 |
84" CORR. GALV. STEEL PIPE | 250 | LF |
$225.00 |
$188.05 |
$215.00 |
| 114 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$400.00 |
$292.20 |
$250.00 |
| 115 | 613(M) 7191 |
TYPE AA4 CULVERT END TREATMENT | 1 | EA |
$1,250.00 |
$1,430.28 |
$2,000.00 |
| 116 | 613(M) 7201 |
TYPE AA6 CULVERT END TREATMENT | 1 | EA |
$1,850.00 |
$1,755.52 |
$2,500.00 |
| 117 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$13,000.00 |
$1,732.50 |
$28,500.00 |
| 118 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 5,831 | SY |
$4.00 |
$3.49 |
$5.60 |
| 119 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 3,260 | SY |
$5.00 |
$4.52 |
$13.80 |
| 120 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 659 | LF |
$3.00 |
$1.58 |
$1.75 |
| 121 | 619(C) 0924 |
SAWING PAVEMENT | 468 | LF |
$5.00 |
$4.73 |
$2.15 |
| 122 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 500 | LF |
$20.00 |
$15.75 |
$15.80 |
| 123 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,000.00 |
$1,947.75 |
$2,200.00 |
| 124 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,500.00 |
$1,365.00 |
$1,525.00 |
| 125 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 842 | LF |
$5.00 |
$8.40 |
$5.50 |
| 126 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 1 | EA |
$1,000.00 |
$840.00 |
$535.00 |
| 127 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$20.00 |
$15.40 |
$20.00 |
| 128 | 501(G) 6309 |
CLSM BACKFILL | 304 | CY |
$150.00 |
$116.10 |
$130.00 |
| 129 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 499 | LF |
$250.00 |
$280.71 |
$280.00 |
| 130 | 504(A) 1304 |
APPROACH SLAB | 271.8 | SY |
$175.00 |
$179.75 |
$160.00 |
| 131 | 504(B) 1305 |
SAW-CUT GROOVING | 815.6 | SY |
$5.00 |
$3.96 |
$4.00 |
| 132 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 367 | LF |
$75.00 |
$92.75 |
$60.00 |
| 133 | 506(A) 1322 |
STRUCTURAL STEEL | 600 | LB |
$2.00 |
$3.50 |
$2.50 |
| 134 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$350.00 |
$688.48 |
$500.00 |
| 135 | 509(A) 1326 |
CLASS AA CONCRETE | 208.8 | CY |
$500.00 |
$450.73 |
$500.00 |
| 136 | 509(B) 1328 |
CLASS A CONCRETE | 69.2 | CY |
$500.00 |
$475.81 |
$500.00 |
| 137 | 509(D) 1331 |
CLASS C CONCRETE | 13.8 | CY |
$350.00 |
$348.60 |
$300.00 |
| 138 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 50,575 | LB |
$1.00 |
$0.9100 |
$1.10 |
| 139 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 564 | LF |
$30.00 |
$37.00 |
$28.00 |
| 140 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 564 | LF |
$20.00 |
$10.45 |
$10.00 |
| 141 | 514(K) 6260 |
(PL)PILOT HOLES | 444 | LF |
$80.00 |
$102.65 |
$160.00 |
| 142 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 641 | SY |
$4.00 |
$3.52 |
$4.00 |
| 143 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 964 | TON |
$50.00 |
$44.07 |
$45.00 |
| 144 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 146 | TON |
$30.00 |
$33.25 |
$45.00 |
| 145 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$20.00 |
$47.62 |
$50.00 |
| 146 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$20.00 |
$10.67 |
$50.00 |
| 147 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$32,000.00 |
$32,450.00 |
$40,000.00 |
| 148 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 6 | EA |
$100.00 |
$6.48 |
$80.00 |
| 149 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 18 | SF |
$18.00 |
$19.44 |
$24.00 |
| 150 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 26.5 | LF |
$10.00 |
$28.62 |
$10.00 |
| 151 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 1 | EA |
$30.00 |
$27.00 |
$20.00 |
| 152 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 14 | EA |
$30.00 |
$10.80 |
$5.30 |
| 153 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 6,186 | LF |
$0.8000 |
$0.7300 |
$0.6000 |
| 154 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 9,180 | LF |
$0.2500 |
$0.2200 |
$0.1500 |
| 155 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 3,090 | LF |
$0.8000 |
$0.8100 |
$0.7000 |
| 156 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,569 | LF |
$0.2500 |
$0.5400 |
$0.3500 |
| 157 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,840 | SD |
$0.5000 |
$0.0500 |
$0.0200 |
| 158 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,860 | SD |
$1.00 |
$0.2200 |
$0.2500 |
| 159 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,280 | SD |
$1.25 |
$1.35 |
$0.2500 |
| 160 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,860 | SD |
$0.5000 |
$0.1600 |
$1.50 |
| 161 | 880(C) 8848 |
WING BARRICADES | 1,200 | SD |
$0.5000 |
$0.2700 |
$0.7500 |
| 162 | 880(D) 8854 |
VERTICAL PANELS | 7,200 | SD |
$0.2500 |
$0.0500 |
$0.6500 |
| 163 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 5,820 | SD |
$0.0500 |
$0.9200 |
$0.4000 |
| 164 | 880(F) 8878 |
DRUMS | 4,740 | SD |
$0.2500 |
$0.0500 |
$0.1000 |
| 165 | 880(I) 8902 |
FLAGGER | 20 | SD |
$175.00 |
$162.00 |
$430.00 |