Bid tab 120139

Let Jan 17, 2013 · Division 4 · Noble Sign up free

‹ Jan 2013 results

GRADE, DRAIN, AND SURFACE US -64: FROM BOUNDARY STREET IN PERRY , EXTEND EAST. PROJECT LENGTH = 4.658 MILES

Let date
Thursday, January 17, 2013
Contract
120139
J/P numbers
20311(09)
District
Division 4
County
Noble
Highway
Limits
GRADE, DRAIN, AND SURFACE US -64: FROM BOUNDARY STREET IN PERRY , EXTEND EAST. PROJECT LENGTH = 4.658 MILES
Project number
STPY-152B(174)

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$7,488,206
1 THE CUMMINS CONSTRUCTION CO., INC. Low bidder $6,572,139 -12.2%
2 KOSS CONSTRUCTION COMPANY & SUBSIDIARY $7,015,133 -6.3% +6.7%
3 HASKELL LEMON CONSTRUCTION CO. $8,130,019 +8.6% +23.7%
4 Evans & Associates Construction Co., Inc. $8,401,786 +12.2% +27.8%

Bid tab: unit prices 70 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 THE CUMMINS CON…#2 KOSS CONSTRUCTI…#3 HASKELL LEMON C…#4 Evans & Associa…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $25,000.00 $15,000.00 $15,000.00 $43,000.00 $20,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION47,413CY $4.50 $2.60 $2.50 $7.50 $6.25
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $7,500.00 $10,000.00 $7,500.00 $75,000.00 $25,000.00
4210 0121 OBLITERATING ABANDONED ROAD24,360LF $10.00 $5.15 $8.15 $15.50 $15.29
5221(C) 2801 TEMPORARY SILT FENCE48,765LF $2.50 $1.15 $1.11 $2.00 $2.00
6221(D) 2803 TEMPORARY SEDIMENT FILTER8EA $200.00 $150.00 $129.00 $500.00 $500.00
7221(F) 0100 TEMPORARY SILT DIKE3,488LF $6.94 $7.50 $7.28 $5.00 $10.00
8229 4318 DITCH LINER PROTECTION811LF $2.25 $1.25 $1.22 $1.10 $1.25
9230(A) 2806 SOLID SLAB SODDING44,978SY $2.50 $1.30 $1.22 $1.75 $1.70
10230(B) 2807 MULCH SODDING25,899SY $1.68 $1.30 $1.24 $1.65 $1.60
11230(F) 2812 WATERING1,800KGAL $294.41 $15.50 $15.00 $10.00 $10.00
12233(A) 2817 VEGETATIVE MULCHING38AC $311.88 $481.00 $467.00 $600.00 $800.00
13241 2832 MOWING503AC $75.00 $80.35 $78.00 $25.00 $80.00
14307(E) 4240 CEMENTITIOUS STABILIZED SUBGRADE121,752SY $6.00 $5.35 $5.60 $7.70 $5.64
15402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E400TON $26.00 $31.10 $30.00 $50.00 $39.00
16407(B) 0250 TACK COAT54,807GAL $3.25 $2.90 $1.00 $2.00 $2.25
17408 5774 PRIME COAT46,701GAL $4.75 $5.70 $2.35 $2.00 $3.50
18411(B) 5940 SUPERPAVE, TYPE S3(PG 70-28 OK)11,263TON $68.00 $66.00 $71.95 $73.63 $79.57
19411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)43,668TON $58.50 $57.50 $64.55 $71.00 $69.10
20411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)7,510TON $80.00 $78.00 $87.65 $86.50 $90.11
21411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)6,260TON $65.00 $65.50 $70.95 $80.00 $72.53
22501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED107CY $28.38 $10.85 $12.00 $11.00 $25.00
23509(A) 0319 CLASS AA CONCRETE244CY $475.00 $335.00 $340.00 $375.00 $525.00
24509(B) 0321 CLASS A CONCRETE74CY $475.00 $361.00 $360.00 $650.00 $700.00
25509(D) 0325 CLASS C CONCRETE152CY $180.00 $216.50 $215.00 $340.00 $400.00
26511(A) 1332 REINFORCING STEEL43,539LB $0.7800 $0.8800 $0.8500 $0.9000 $1.10
27601(B) 1353 TYPE I-A PLAIN RIPRAP98TON $32.50 $42.60 $48.00 $55.00 $55.00
28601(C) 1355 TYPE I-A FILTER BLANKET24TON $30.00 $38.20 $45.00 $50.00 $55.00
29613(A) 0492 24" R.C.PIPE CLASS III11LF $78.61 $57.00 $105.00 $100.00 $140.00
30613(B) 0689 18" CORR. GALV. STEEL PIPE617LF $22.00 $20.00 $22.00 $30.75 $40.00
31613(H) 0450 6" PERFORATED PIPE UNDERDRAIN ROUND500LF $11.00 $10.00 $11.00 $15.00 $20.00
32613(I) 1096 6" NON-PERF.PIPE UNDERDRAIN RND.100LF $10.00 $9.00 $10.00 $10.00 $20.00
33613(M) 7196 TYPE A6 CULVERT END TREATMENT16EA $650.00 $950.00 $1,000.00 $2,000.00 $1,400.00
34613(M) 7197 TYPE B6 CULVERT END TREATMENT1EA $1,110.91 $5,700.00 $1,100.00 $2,100.00 $1,700.00
35619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $2,500.00 $5,000.00 $12,000.00 $45,000.00 $150,000.00
36619(B) 4728 REMOVAL OF ASPHALT PAVEMENT1,568SY $3.50 $2.85 $4.52 $8.00 $5.00
37619(B) 4780 REMOVAL OF GUARDRAIL1,406LF $6.00 $1.80 $1.73 $5.75 $4.50
38619(B) 5113 REMOVAL OF RIPRAP222SY $15.00 $7.75 $6.00 $24.00 $15.00
39619(C) 0924 SAWING PAVEMENT1,131LF $8.36 $2.60 $4.25 $3.50 $4.00
40629(A) 4958 MAILBOX INSTALLATION-SINGLE13EA $5.00 $100.00 $70.00 $77.00 $75.00
41629(B) 4959 MAILBOX INSTALLATION-MULTIPLE1EA $40.00 $200.00 $170.00 $190.00 $350.00
42629(C) 4960 MAILBOX15EA $66.28 $50.00 $25.00 $30.00 $50.00
43629(D) 4961 REMOVAL OF MAILBOX INSTALLATION14EA $17.73 $25.00 $12.00 $15.00 $14.00
44857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)10,000LF $0.2000 $0.2000 $0.1800 $0.2000 $0.5000
45857(E) 8890 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2500EA $1.00 $0.5000 $0.4600 $0.5000 $1.40
46871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.180SD $10.65 $5.00 $5.00 $5.50 $60.00
47877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER800LF $22.57 $27.50 $36.00 $38.00 $40.00
48880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF2,925SD $0.7900 $0.6500 $0.6500 $0.7000 $0.3500
49880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF5,265SD $0.2400 $0.6500 $0.6500 $0.7000 $0.9500
50880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF2,535SD $1.22 $1.70 $1.65 $1.80 $2.00
51880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)5,070SD $0.3100 $0.0500 $0.0500 $0.0600 $1.50
52880(C) 8848 WING BARRICADES1,560SD $0.3800 $0.3000 $0.3000 $0.3300 $0.3000
53880(D) 8854 VERTICAL PANELS7,800SD $0.2500 $0.0500 $0.0500 $0.0600 $0.4000
54880(E) 8860 WARNING LIGHTS(TYPE A)7,605SD $0.0800 $0.2000 $0.2000 $0.2200 $0.7000
55880(F) 8878 DRUMS6,825SD $0.0800 $0.5000 $0.5000 $0.5500 $0.4500
56880(G) 8890 CHANNELIZER CONES5,460SD $0.1100 $0.1500 $0.1500 $0.1700 $0.4500
57805(A) 8722 (PL)REMOVAL OF EXISTING SIGNS1LSUM $1,000.00 $130.00 $125.00 $135.00 $2,500.00
58850(A) 8110 SHEET ALUMINUM SIGNS208.37SF $16.38 $17.50 $17.00 $20.00 $25.00
59851(C) 8324 2" SQUARE TUBE POST467.5LF $9.40 $8.25 $8.00 $9.00 $10.00
60856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)90,000LF $0.4800 $0.3200 $0.2600 $0.2800 $0.4200
61856(A) 8540 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE)640LF $1.01 $3.10 $3.00 $3.30 $1.50
62856(A) 8555 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE)184LF $4.97 $10.30 $10.00 $11.00 $6.50
63856(B) 8860 TRAFFIC STRIPE(MULTI-POLY.)(ARROWS)6EA $80.72 $155.00 $150.00 $165.00 $400.00
64880(C) 8850 PERMANENT BARRICADE UNIT4EA $713.58 $725.00 $700.00 $770.00 $1,000.00
65880(G) 8900 TUBE CHANNELIZERS9EA $11.13 $50.00 $35.00 $39.00 $65.00
66642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $30,000.00 $75,000.00 $61,300.00 $80,000.00 $80,000.00
67220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $1,500.00 $10,000.00 $3,500.00 $2,000.00 $15,000.00
68640(A) 1426 FIELD OFFICE1EA $7,500.00 $10,000.00 $11,000.00 $10,000.00 $25,000.00
69641 1552 MOBILIZATION1LSUM $206,372.25 $235,000.00 $331,700.00 $120,000.00 $365,000.00
70643 0087 (SP)CONTRACTORS QUALITY CONTROL1LSUM $25,000.00 $35,000.00 $85,000.00 $60,000.00 $150,000.00