| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$15,000.00 |
$15,000.00 |
$43,000.00 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 47,413 | CY |
$4.50 |
$2.60 |
$2.50 |
$7.50 |
$6.25 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,500.00 |
$10,000.00 |
$7,500.00 |
$75,000.00 |
$25,000.00 |
| 4 | 210 0121 |
OBLITERATING ABANDONED ROAD | 24,360 | LF |
$10.00 |
$5.15 |
$8.15 |
$15.50 |
$15.29 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 48,765 | LF |
$2.50 |
$1.15 |
$1.11 |
$2.00 |
$2.00 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 8 | EA |
$200.00 |
$150.00 |
$129.00 |
$500.00 |
$500.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 3,488 | LF |
$6.94 |
$7.50 |
$7.28 |
$5.00 |
$10.00 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 811 | LF |
$2.25 |
$1.25 |
$1.22 |
$1.10 |
$1.25 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 44,978 | SY |
$2.50 |
$1.30 |
$1.22 |
$1.75 |
$1.70 |
| 10 | 230(B) 2807 |
MULCH SODDING | 25,899 | SY |
$1.68 |
$1.30 |
$1.24 |
$1.65 |
$1.60 |
| 11 | 230(F) 2812 |
WATERING | 1,800 | KGAL |
$294.41 |
$15.50 |
$15.00 |
$10.00 |
$10.00 |
| 12 | 233(A) 2817 |
VEGETATIVE MULCHING | 38 | AC |
$311.88 |
$481.00 |
$467.00 |
$600.00 |
$800.00 |
| 13 | 241 2832 |
MOWING | 503 | AC |
$75.00 |
$80.35 |
$78.00 |
$25.00 |
$80.00 |
| 14 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 121,752 | SY |
$6.00 |
$5.35 |
$5.60 |
$7.70 |
$5.64 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 400 | TON |
$26.00 |
$31.10 |
$30.00 |
$50.00 |
$39.00 |
| 16 | 407(B) 0250 |
TACK COAT | 54,807 | GAL |
$3.25 |
$2.90 |
$1.00 |
$2.00 |
$2.25 |
| 17 | 408 5774 |
PRIME COAT | 46,701 | GAL |
$4.75 |
$5.70 |
$2.35 |
$2.00 |
$3.50 |
| 18 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 11,263 | TON |
$68.00 |
$66.00 |
$71.95 |
$73.63 |
$79.57 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 43,668 | TON |
$58.50 |
$57.50 |
$64.55 |
$71.00 |
$69.10 |
| 20 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 7,510 | TON |
$80.00 |
$78.00 |
$87.65 |
$86.50 |
$90.11 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,260 | TON |
$65.00 |
$65.50 |
$70.95 |
$80.00 |
$72.53 |
| 22 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 107 | CY |
$28.38 |
$10.85 |
$12.00 |
$11.00 |
$25.00 |
| 23 | 509(A) 0319 |
CLASS AA CONCRETE | 244 | CY |
$475.00 |
$335.00 |
$340.00 |
$375.00 |
$525.00 |
| 24 | 509(B) 0321 |
CLASS A CONCRETE | 74 | CY |
$475.00 |
$361.00 |
$360.00 |
$650.00 |
$700.00 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 152 | CY |
$180.00 |
$216.50 |
$215.00 |
$340.00 |
$400.00 |
| 26 | 511(A) 1332 |
REINFORCING STEEL | 43,539 | LB |
$0.7800 |
$0.8800 |
$0.8500 |
$0.9000 |
$1.10 |
| 27 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 98 | TON |
$32.50 |
$42.60 |
$48.00 |
$55.00 |
$55.00 |
| 28 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 24 | TON |
$30.00 |
$38.20 |
$45.00 |
$50.00 |
$55.00 |
| 29 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 11 | LF |
$78.61 |
$57.00 |
$105.00 |
$100.00 |
$140.00 |
| 30 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 617 | LF |
$22.00 |
$20.00 |
$22.00 |
$30.75 |
$40.00 |
| 31 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$11.00 |
$10.00 |
$11.00 |
$15.00 |
$20.00 |
| 32 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$10.00 |
$9.00 |
$10.00 |
$10.00 |
$20.00 |
| 33 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 16 | EA |
$650.00 |
$950.00 |
$1,000.00 |
$2,000.00 |
$1,400.00 |
| 34 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 1 | EA |
$1,110.91 |
$5,700.00 |
$1,100.00 |
$2,100.00 |
$1,700.00 |
| 35 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$5,000.00 |
$12,000.00 |
$45,000.00 |
$150,000.00 |
| 36 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,568 | SY |
$3.50 |
$2.85 |
$4.52 |
$8.00 |
$5.00 |
| 37 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,406 | LF |
$6.00 |
$1.80 |
$1.73 |
$5.75 |
$4.50 |
| 38 | 619(B) 5113 |
REMOVAL OF RIPRAP | 222 | SY |
$15.00 |
$7.75 |
$6.00 |
$24.00 |
$15.00 |
| 39 | 619(C) 0924 |
SAWING PAVEMENT | 1,131 | LF |
$8.36 |
$2.60 |
$4.25 |
$3.50 |
$4.00 |
| 40 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 13 | EA |
$5.00 |
$100.00 |
$70.00 |
$77.00 |
$75.00 |
| 41 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$40.00 |
$200.00 |
$170.00 |
$190.00 |
$350.00 |
| 42 | 629(C) 4960 |
MAILBOX | 15 | EA |
$66.28 |
$50.00 |
$25.00 |
$30.00 |
$50.00 |
| 43 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 14 | EA |
$17.73 |
$25.00 |
$12.00 |
$15.00 |
$14.00 |
| 44 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 10,000 | LF |
$0.2000 |
$0.2000 |
$0.1800 |
$0.2000 |
$0.5000 |
| 45 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 500 | EA |
$1.00 |
$0.5000 |
$0.4600 |
$0.5000 |
$1.40 |
| 46 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 180 | SD |
$10.65 |
$5.00 |
$5.00 |
$5.50 |
$60.00 |
| 47 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 800 | LF |
$22.57 |
$27.50 |
$36.00 |
$38.00 |
$40.00 |
| 48 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,925 | SD |
$0.7900 |
$0.6500 |
$0.6500 |
$0.7000 |
$0.3500 |
| 49 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 5,265 | SD |
$0.2400 |
$0.6500 |
$0.6500 |
$0.7000 |
$0.9500 |
| 50 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,535 | SD |
$1.22 |
$1.70 |
$1.65 |
$1.80 |
$2.00 |
| 51 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,070 | SD |
$0.3100 |
$0.0500 |
$0.0500 |
$0.0600 |
$1.50 |
| 52 | 880(C) 8848 |
WING BARRICADES | 1,560 | SD |
$0.3800 |
$0.3000 |
$0.3000 |
$0.3300 |
$0.3000 |
| 53 | 880(D) 8854 |
VERTICAL PANELS | 7,800 | SD |
$0.2500 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.4000 |
| 54 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,605 | SD |
$0.0800 |
$0.2000 |
$0.2000 |
$0.2200 |
$0.7000 |
| 55 | 880(F) 8878 |
DRUMS | 6,825 | SD |
$0.0800 |
$0.5000 |
$0.5000 |
$0.5500 |
$0.4500 |
| 56 | 880(G) 8890 |
CHANNELIZER CONES | 5,460 | SD |
$0.1100 |
$0.1500 |
$0.1500 |
$0.1700 |
$0.4500 |
| 57 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,000.00 |
$130.00 |
$125.00 |
$135.00 |
$2,500.00 |
| 58 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 208.37 | SF |
$16.38 |
$17.50 |
$17.00 |
$20.00 |
$25.00 |
| 59 | 851(C) 8324 |
2" SQUARE TUBE POST | 467.5 | LF |
$9.40 |
$8.25 |
$8.00 |
$9.00 |
$10.00 |
| 60 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 90,000 | LF |
$0.4800 |
$0.3200 |
$0.2600 |
$0.2800 |
$0.4200 |
| 61 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 640 | LF |
$1.01 |
$3.10 |
$3.00 |
$3.30 |
$1.50 |
| 62 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 184 | LF |
$4.97 |
$10.30 |
$10.00 |
$11.00 |
$6.50 |
| 63 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 6 | EA |
$80.72 |
$155.00 |
$150.00 |
$165.00 |
$400.00 |
| 64 | 880(C) 8850 |
PERMANENT BARRICADE UNIT | 4 | EA |
$713.58 |
$725.00 |
$700.00 |
$770.00 |
$1,000.00 |
| 65 | 880(G) 8900 |
TUBE CHANNELIZERS | 9 | EA |
$11.13 |
$50.00 |
$35.00 |
$39.00 |
$65.00 |
| 66 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$75,000.00 |
$61,300.00 |
$80,000.00 |
$80,000.00 |
| 67 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$1,500.00 |
$10,000.00 |
$3,500.00 |
$2,000.00 |
$15,000.00 |
| 68 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$7,500.00 |
$10,000.00 |
$11,000.00 |
$10,000.00 |
$25,000.00 |
| 69 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$206,372.25 |
$235,000.00 |
$331,700.00 |
$120,000.00 |
$365,000.00 |
| 70 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$25,000.00 |
$35,000.00 |
$85,000.00 |
$60,000.00 |
$150,000.00 |