| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$35,887.40 |
$9,000.00 |
$10,860.00 |
$9,359.19 |
$30,000.00 |
$46,805.00 |
$15,000.00 |
$50,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 29,724 | CY |
$4.54 |
$6.29 |
$7.00 |
$4.26 |
$8.00 |
$7.50 |
$9.25 |
$11.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$31,284.50 |
$24,000.00 |
$20,000.00 |
$28,000.00 |
$40,000.00 |
$63,310.00 |
$52,000.00 |
$35,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,519 | LF |
$1.63 |
$1.92 |
$1.50 |
$1.91 |
$2.50 |
$1.45 |
$1.45 |
$2.50 |
| 5 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 51 | EA |
$162.90 |
$266.25 |
$185.00 |
$265.88 |
$100.00 |
$77.00 |
$78.00 |
$220.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 63 | LF |
$6.63 |
$12.78 |
$9.90 |
$12.76 |
$15.00 |
$6.70 |
$6.75 |
$7.50 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 11,100 | SY |
$1.73 |
$1.92 |
$1.70 |
$1.91 |
$3.00 |
$2.00 |
$1.40 |
$1.50 |
| 8 | 232(A) 2813 |
SEEDING METHOD A | 4.6 | AC |
$559.90 |
$1,065.00 |
$1,044.00 |
$1,063.52 |
$1,000.00 |
$1,240.00 |
$1,245.00 |
$980.00 |
| 9 | 241 2832 |
MOWING | 6.9 | AC |
$51.02 |
$106.50 |
$114.00 |
$106.35 |
$100.00 |
$77.00 |
$130.00 |
$110.00 |
| 10 | 307(F) 4250 |
CEMENTITIOUS MODIFIED SUBGRADE | 49,794 | SY |
$4.20 |
$4.00 |
$4.25 |
$4.50 |
$3.30 |
$3.70 |
$5.20 |
$4.50 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,337 | TON |
$26.04 |
$20.56 |
$20.00 |
$24.78 |
$26.00 |
$35.00 |
$48.65 |
$28.00 |
| 12 | 407(B) 0250 |
TACK COAT | 431 | GAL |
$3.74 |
$2.40 |
$3.50 |
$1.60 |
$2.25 |
$4.00 |
$2.35 |
$2.50 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,921 | TON |
$90.00 |
$60.00 |
$55.00 |
$68.07 |
$64.25 |
$55.80 |
$66.35 |
$70.00 |
| 14 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 45,039 | SY |
$16.00 |
$11.25 |
$13.75 |
$15.00 |
$14.00 |
$15.60 |
$13.10 |
$14.00 |
| 15 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 11,260 | CY |
$93.59 |
$99.00 |
$84.00 |
$105.00 |
$100.00 |
$91.20 |
$105.00 |
$110.00 |
| 16 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 322 | CY |
$11.61 |
$8.93 |
$12.30 |
$13.27 |
$13.00 |
$20.60 |
$20.71 |
$12.00 |
| 17 | 509(A) 0319 |
CLASS AA CONCRETE | 236 | CY |
$410.00 |
$465.98 |
$441.00 |
$450.00 |
$450.00 |
$437.75 |
$439.98 |
$400.00 |
| 18 | 511(A) 0332 |
REINFORCING STEEL | 28,054 | LB |
$0.9000 |
$0.4400 |
$1.00 |
$0.8500 |
$1.00 |
$1.05 |
$1.04 |
$0.7500 |
| 19 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 60 | TON |
$28.88 |
$48.00 |
$49.00 |
$58.06 |
$50.00 |
$61.80 |
$62.12 |
$39.00 |
| 20 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 12,444 | LF |
$5.70 |
$6.00 |
$4.80 |
$4.47 |
$3.00 |
$3.00 |
$5.15 |
$3.50 |
| 21 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 3,520 | SY |
$43.38 |
$28.76 |
$30.00 |
$32.32 |
$35.00 |
$31.90 |
$38.95 |
$31.00 |
| 22 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 1,711 | SY |
$39.80 |
$37.08 |
$45.00 |
$51.15 |
$50.00 |
$45.50 |
$58.00 |
$46.00 |
| 23 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 88 | SF |
$45.00 |
$20.14 |
$26.00 |
$21.03 |
$21.00 |
$20.60 |
$20.45 |
$17.00 |
| 24 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 33 | EA |
$2,000.00 |
$2,016.32 |
$1,214.00 |
$1,832.25 |
$1,250.00 |
$2,575.00 |
$2,588.12 |
$1,800.00 |
| 25 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 1 | EA |
$2,200.00 |
$2,720.38 |
$2,050.00 |
$2,348.66 |
$2,100.00 |
$3,090.00 |
$3,105.75 |
$2,600.00 |
| 26 | 611(B) 2680 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 13 | VF |
$150.00 |
$198.95 |
$138.00 |
$188.86 |
$145.00 |
$154.50 |
$155.29 |
$71.00 |
| 27 | 611(B) 2681 |
ADD'L.DEPTH IN MANHOLE (5' DIAMETER) | 3 | VF |
$180.00 |
$141.24 |
$219.00 |
$254.15 |
$225.00 |
$206.00 |
$207.05 |
$120.00 |
| 28 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 47 | EA |
$1,500.00 |
$3,037.71 |
$2,304.00 |
$1,899.64 |
$2,400.00 |
$2,575.00 |
$2,588.13 |
$2,700.00 |
| 29 | 611(G) 5113 |
INLET CI DES. 2 (B) | 1 | EA |
$2,000.00 |
$2,656.72 |
$2,183.00 |
$2,871.08 |
$3,300.00 |
$5,150.00 |
$5,176.25 |
$3,600.00 |
| 30 | 611(G) 5394 |
INLET CDI RCB DES. 8 | 2 | EA |
$2,225.00 |
$3,565.71 |
$2,851.00 |
$3,101.71 |
$3,000.00 |
$5,150.00 |
$5,176.25 |
$2,500.00 |
| 31 | 611(G) 5395 |
INLET CDI RCB DES. 9 | 2 | EA |
$2,225.00 |
$2,556.95 |
$2,851.00 |
$3,784.40 |
$3,000.00 |
$5,150.00 |
$5,176.25 |
$2,500.00 |
| 32 | 611(G) 5972 |
INLET W/SMALL JCT. BOX, CI, DES.2(B) | 2 | EA |
$6,800.00 |
$6,886.19 |
$5,358.00 |
$5,160.29 |
$5,500.00 |
$7,210.00 |
$7,246.75 |
$5,800.00 |
| 33 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 2 | EA |
$1,762.91 |
$2,441.53 |
$1,425.00 |
$2,074.00 |
$1,500.00 |
$1,905.50 |
$1,915.22 |
$1,500.00 |
| 34 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 34 | VF |
$343.50 |
$517.06 |
$209.00 |
$244.54 |
$215.00 |
$206.00 |
$207.05 |
$180.00 |
| 35 | 611(H) 5972 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 2(B) | 6 | VF |
$350.00 |
$517.06 |
$437.00 |
$606.54 |
$450.00 |
$463.50 |
$465.86 |
$380.00 |
| 36 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 1,738 | LF |
$48.66 |
$51.81 |
$49.00 |
$47.22 |
$48.00 |
$61.80 |
$56.94 |
$100.00 |
| 37 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 1,160 | LF |
$57.50 |
$50.53 |
$53.00 |
$51.43 |
$52.00 |
$66.95 |
$62.12 |
$56.00 |
| 38 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 1,679 | LF |
$66.41 |
$59.74 |
$60.50 |
$62.78 |
$59.00 |
$82.40 |
$82.82 |
$80.00 |
| 39 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 1,126 | LF |
$80.00 |
$73.61 |
$82.00 |
$82.08 |
$81.00 |
$92.70 |
$93.17 |
$98.00 |
| 40 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 5 | EA |
$739.34 |
$999.93 |
$1,030.00 |
$797.09 |
$1,000.00 |
$1,545.00 |
$1,552.88 |
$530.00 |
| 41 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$17,349.10 |
$14,000.00 |
$15,220.00 |
$14,677.35 |
$20,000.00 |
$14,335.00 |
$8,799.62 |
$10,000.00 |
| 42 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 293 | LF |
$6.29 |
$6.80 |
$6.00 |
$5.93 |
$9.50 |
$8.90 |
$4.95 |
$7.00 |
| 43 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 19,442 | SY |
$2.50 |
$0.5600 |
$6.00 |
$1.06 |
$2.20 |
$0.9500 |
$2.25 |
$2.50 |
| 44 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 370 | SY |
$5.50 |
$2.88 |
$6.00 |
$5.70 |
$10.00 |
$13.50 |
$6.75 |
$7.00 |
| 45 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 933 | SY |
$2.50 |
$1.89 |
$6.00 |
$5.96 |
$10.00 |
$6.40 |
$5.75 |
$16.00 |
| 46 | 619(C) 0924 |
SAWING PAVEMENT | 940 | LF |
$4.25 |
$2.88 |
$3.30 |
$4.80 |
$3.00 |
$3.60 |
$4.50 |
$4.00 |
| 47 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 6 | EA |
$69.63 |
$74.55 |
$73.50 |
$74.45 |
$75.00 |
$72.10 |
$102.23 |
$110.00 |
| 48 | 629(C) 4960 |
MAILBOX | 6 | EA |
$25.88 |
$26.63 |
$26.25 |
$26.59 |
$27.00 |
$25.75 |
$51.12 |
$55.00 |
| 49 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 6 | EA |
$11.38 |
$15.98 |
$16.00 |
$15.95 |
$16.00 |
$15.45 |
$25.56 |
$27.00 |
| 50 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$100.00 |
$69.23 |
$68.25 |
$69.13 |
$67.00 |
$66.95 |
$511.15 |
$550.00 |
| 51 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 95 | SF |
$16.86 |
$17.04 |
$17.00 |
$17.02 |
$16.00 |
$16.50 |
$16.36 |
$18.00 |
| 52 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 222 | LF |
$10.48 |
$7.46 |
$7.40 |
$7.44 |
$7.50 |
$7.20 |
$7.67 |
$8.00 |
| 53 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 16,366 | LF |
$0.5000 |
$0.4600 |
$0.5000 |
$0.4600 |
$0.5000 |
$0.4500 |
$0.6600 |
$0.7100 |
| 54 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 175 | LF |
$5.72 |
$2.94 |
$2.90 |
$2.94 |
$3.00 |
$2.85 |
$5.11 |
$5.50 |
| 55 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 9 | EA |
$118.13 |
$74.55 |
$73.50 |
$74.45 |
$73.00 |
$72.00 |
$102.23 |
$110.00 |
| 56 | 855(B) 8821 |
TRAFFIC STRIPE(PLASTIC)(WORDS) | 2 | EA |
$164.70 |
$181.05 |
$178.50 |
$180.80 |
$180.00 |
$175.00 |
$204.46 |
$220.00 |
| 57 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 109,000 | LF |
$0.0700 |
$0.0700 |
$0.0500 |
$0.0700 |
$0.1000 |
$0.0700 |
$0.0600 |
$0.0700 |
| 58 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 13,875 | SD |
$0.3500 |
$0.0200 |
$0.0500 |
$0.0200 |
$0.0300 |
$0.0200 |
$0.5600 |
$0.6000 |
| 59 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 18,000 | SD |
$0.5500 |
$0.8000 |
$0.7500 |
$0.8000 |
$0.8000 |
$0.7700 |
$0.7200 |
$0.7700 |
| 60 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 3,000 | SD |
$0.5000 |
$1.60 |
$1.60 |
$1.60 |
$2.00 |
$1.55 |
$1.02 |
$1.00 |
| 61 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 10,500 | SD |
$0.1000 |
$0.5300 |
$0.5000 |
$0.5300 |
$0.5000 |
$0.5200 |
$0.5600 |
$0.6000 |
| 62 | 880(F) 8878 |
DRUMS | 177,000 | SD |
$0.1500 |
$0.0200 |
$0.0500 |
$0.0200 |
$0.0300 |
$0.0200 |
$0.0300 |
$0.0300 |
| 63 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,000.00 |
$66,715.44 |
$58,200.00 |
$41,211.50 |
$45,000.00 |
$60,515.00 |
$45,000.00 |
$51,000.00 |
| 64 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,461.06 |
$1,953.27 |
$8,335.00 |
$4,097.88 |
$1,000.00 |
$10,700.00 |
$1,500.00 |
$2,500.00 |
| 65 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$200,000.00 |
$150,000.00 |
$250,000.00 |
$127,000.00 |
$100,000.00 |
$290,022.20 |
$225,000.00 |
$245,000.00 |
| 66 | 612(A) 0641 |
MANHOLES ADJUST TO GRADE | 2 | EA |
$533.48 |
$372.75 |
$945.00 |
$531.76 |
$1,000.00 |
$1,205.00 |
$357.81 |
$1,100.00 |
| 67 | 612(E) 0647 |
VALVE BOXES ADJUST TO GRADE | 5 | EA |
$200.00 |
$2,454.28 |
$368.00 |
$106.35 |
$750.00 |
$385.00 |
$153.35 |
$590.00 |
| 68 | 612(F) 0648 |
METER BOXES ADJUST TO GRADE | 1 | EA |
$2,000.00 |
$7,455.00 |
$11,790.00 |
$13,378.05 |
$750.00 |
$5,864.00 |
$7,156.17 |
$9,700.00 |
| 69 | 616 5010 |
(PL) IRRIGATION SYSTEM | 1 | LSUM |
$2,000.00 |
$1,200.00 |
$525.00 |
$531.76 |
$25,000.00 |
$1,030.00 |
$1,533.46 |
$3,000.00 |
| 70 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$9,000.00 |
$5,420.00 |
$9,359.19 |
$30,000.00 |
$11,324.32 |
$5,000.00 |
$25,000.00 |
| 71 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 13,569 | CY |
$5.34 |
$6.29 |
$7.00 |
$5.00 |
$8.00 |
$7.40 |
$8.65 |
$11.00 |
| 72 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$22,166.70 |
$44,000.00 |
$10,000.00 |
$12,660.28 |
$40,000.00 |
$29,995.00 |
$19,500.00 |
$15,000.00 |
| 73 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,151 | LF |
$1.98 |
$1.92 |
$1.50 |
$1.91 |
$2.50 |
$1.15 |
$1.45 |
$2.50 |
| 74 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 28 | EA |
$153.87 |
$266.25 |
$185.00 |
$265.88 |
$100.00 |
$77.25 |
$78.00 |
$220.00 |
| 75 | 230(A) 2806 |
SOLID SLAB SODDING | 800 | SY |
$2.45 |
$1.92 |
$1.70 |
$1.91 |
$3.00 |
$1.40 |
$1.40 |
$1.50 |
| 76 | 232(A) 2813 |
SEEDING METHOD A | 1.7 | AC |
$559.90 |
$1,065.00 |
$1,044.00 |
$1,063.52 |
$1,000.00 |
$1,236.00 |
$1,245.00 |
$980.00 |
| 77 | 241 2832 |
MOWING | 1.9 | AC |
$52.39 |
$106.50 |
$114.00 |
$106.35 |
$100.00 |
$77.25 |
$130.00 |
$110.00 |
| 78 | 307(F) 4250 |
CEMENTITIOUS MODIFIED SUBGRADE | 13,973 | SY |
$4.20 |
$4.00 |
$4.50 |
$4.50 |
$3.30 |
$5.30 |
$5.18 |
$4.50 |
| 79 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 553 | TON |
$26.04 |
$20.56 |
$20.00 |
$24.78 |
$26.00 |
$35.00 |
$53.75 |
$28.00 |
| 80 | 407(B) 0250 |
TACK COAT | 101 | GAL |
$3.74 |
$2.40 |
$3.50 |
$1.60 |
$2.25 |
$4.00 |
$2.35 |
$2.50 |
| 81 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 451 | TON |
$90.00 |
$60.00 |
$55.00 |
$68.07 |
$64.25 |
$60.40 |
$66.35 |
$70.00 |
| 82 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 13,062 | SY |
$16.00 |
$11.25 |
$13.75 |
$15.00 |
$14.00 |
$14.95 |
$13.10 |
$14.00 |
| 83 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 3,266 | CY |
$95.00 |
$99.00 |
$84.00 |
$105.00 |
$100.00 |
$91.10 |
$105.00 |
$110.00 |
| 84 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 4,244 | LF |
$5.70 |
$6.00 |
$4.90 |
$3.76 |
$3.00 |
$3.85 |
$5.15 |
$3.50 |
| 85 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 1,206 | SY |
$43.38 |
$28.76 |
$30.00 |
$32.36 |
$35.00 |
$31.90 |
$38.95 |
$31.00 |
| 86 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 953 | SY |
$39.80 |
$37.08 |
$45.00 |
$51.18 |
$50.00 |
$45.50 |
$58.00 |
$46.00 |
| 87 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 16 | SF |
$30.09 |
$20.14 |
$26.00 |
$21.01 |
$21.00 |
$20.60 |
$20.50 |
$17.00 |
| 88 | 610(I) 4615 |
TACTILE WARNING DEVICE-RETROFIT | 26 | SF |
$50.00 |
$38.68 |
$27.00 |
$39.23 |
$30.00 |
$30.90 |
$30.65 |
$120.00 |
| 89 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 5 | EA |
$2,000.00 |
$2,016.32 |
$1,215.00 |
$1,873.53 |
$1,250.00 |
$2,575.00 |
$2,588.12 |
$1,800.00 |
| 90 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 6 | EA |
$2,200.00 |
$2,720.38 |
$2,050.00 |
$2,332.38 |
$2,100.00 |
$3,090.00 |
$3,105.75 |
$2,600.00 |
| 91 | 611(A) 2659 |
MANHOLE (6' DIAMETER) | 4 | EA |
$3,200.00 |
$4,034.58 |
$3,548.00 |
$2,770.08 |
$3,700.00 |
$3,605.00 |
$3,623.38 |
$3,500.00 |
| 92 | 611(B) 2680 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 5 | VF |
$150.00 |
$141.24 |
$138.00 |
$192.89 |
$145.00 |
$154.50 |
$155.29 |
$71.00 |
| 93 | 611(B) 2681 |
ADD'L.DEPTH IN MANHOLE (5' DIAMETER) | 11 | VF |
$180.00 |
$198.95 |
$220.00 |
$233.45 |
$225.00 |
$206.00 |
$207.05 |
$120.00 |
| 94 | 611(B) 2682 |
ADD'L.DEPTH IN MANHOLE (6' DIAMETER) | 10 | VF |
$400.00 |
$514.56 |
$373.00 |
$285.40 |
$385.00 |
$257.50 |
$258.81 |
$170.00 |
| 95 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 17 | EA |
$1,500.00 |
$3,037.71 |
$2,304.00 |
$1,912.70 |
$2,400.00 |
$3,090.00 |
$3,105.75 |
$2,700.00 |
| 96 | 611(G) 5113 |
INLET CI DES. 2 (B) | 9 | EA |
$2,000.00 |
$2,656.72 |
$3,183.00 |
$2,797.04 |
$3,300.00 |
$5,150.00 |
$5,176.25 |
$3,600.00 |
| 97 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 16 | VF |
$343.50 |
$517.06 |
$209.00 |
$244.53 |
$215.00 |
$206.00 |
$207.05 |
$180.00 |
| 98 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 668 | LF |
$48.66 |
$51.81 |
$49.00 |
$51.96 |
$48.00 |
$77.25 |
$77.64 |
$100.00 |
| 99 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 1,057 | LF |
$80.00 |
$73.61 |
$82.00 |
$76.45 |
$81.00 |
$123.60 |
$113.88 |
$98.00 |
| 100 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 506 | LF |
$93.77 |
$86.64 |
$97.00 |
$93.30 |
$98.00 |
$169.95 |
$165.64 |
$120.00 |
| 101 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 351 | LF |
$117.51 |
$99.45 |
$123.00 |
$112.92 |
$123.00 |
$190.55 |
$186.35 |
$140.00 |
| 102 | 613(A) 0497 |
54" R.C.PIPE CLASS III | 437 | LF |
$138.50 |
$114.54 |
$144.00 |
$131.09 |
$147.00 |
$206.00 |
$201.87 |
$200.00 |
| 103 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$12,932.10 |
$5,306.99 |
$10,165.00 |
$11,008.02 |
$20,000.00 |
$8,690.00 |
$6,729.13 |
$20,000.00 |
| 104 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 460 | LF |
$6.29 |
$6.80 |
$6.00 |
$5.93 |
$9.50 |
$4.65 |
$4.34 |
$7.00 |
| 105 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 9,121 | SY |
$2.50 |
$0.5600 |
$6.00 |
$1.06 |
$2.20 |
$1.00 |
$2.25 |
$2.50 |
| 106 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 164 | SY |
$5.50 |
$2.88 |
$6.00 |
$5.70 |
$10.00 |
$7.95 |
$6.75 |
$7.00 |
| 107 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 279 | SY |
$2.50 |
$1.89 |
$6.00 |
$5.96 |
$10.00 |
$5.30 |
$5.75 |
$16.00 |
| 108 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 320 | LF |
$8.93 |
$10.20 |
$12.60 |
$8.57 |
$10.00 |
$30.90 |
$31.06 |
$17.00 |
| 109 | 619(C) 0924 |
SAWING PAVEMENT | 400 | LF |
$4.55 |
$2.88 |
$3.30 |
$4.80 |
$3.00 |
$3.60 |
$4.50 |
$4.00 |
| 110 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 5 | EA |
$70.43 |
$74.55 |
$73.50 |
$74.45 |
$75.00 |
$72.10 |
$102.23 |
$110.00 |
| 111 | 629(C) 4960 |
MAILBOX | 5 | EA |
$25.88 |
$26.63 |
$26.00 |
$26.59 |
$27.00 |
$25.75 |
$51.12 |
$55.00 |
| 112 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 5 | EA |
$11.38 |
$15.98 |
$16.00 |
$15.95 |
$16.00 |
$15.45 |
$25.56 |
$27.00 |
| 113 | 805(D) 8744 |
(PL)REMOVE & RESET LIGHT POLE | 1 | EA |
$700.00 |
$4,260.00 |
$4,200.00 |
$4,254.09 |
$4,200.00 |
$5,130.00 |
$4,100.00 |
$1,600.00 |
| 114 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 23 | SF |
$16.46 |
$17.04 |
$17.00 |
$17.02 |
$16.00 |
$16.50 |
$16.36 |
$18.00 |
| 115 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 59 | LF |
$10.48 |
$7.46 |
$7.40 |
$7.44 |
$7.50 |
$7.20 |
$7.67 |
$8.00 |
| 116 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 6,695 | LF |
$0.5000 |
$0.4900 |
$0.5000 |
$0.4900 |
$0.5000 |
$0.4700 |
$0.6600 |
$0.7100 |
| 117 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 20 | LF |
$4.00 |
$3.51 |
$3.47 |
$3.51 |
$3.00 |
$3.40 |
$5.11 |
$5.50 |
| 118 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 21,000 | LF |
$0.2000 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.0600 |
$0.0700 |
| 119 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,875 | SD |
$0.3500 |
$0.0200 |
$0.0500 |
$0.0200 |
$0.0300 |
$0.0200 |
$0.5600 |
$0.6000 |
| 120 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 8,250 | SD |
$0.5500 |
$0.8000 |
$0.8000 |
$0.8000 |
$0.8000 |
$0.7700 |
$0.7200 |
$0.7700 |
| 121 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 750 | SD |
$0.5000 |
$1.60 |
$1.60 |
$1.60 |
$2.00 |
$1.55 |
$1.02 |
$1.00 |
| 122 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,500 | SD |
$0.1000 |
$0.5300 |
$0.5000 |
$0.5300 |
$0.5000 |
$0.5200 |
$0.5600 |
$0.6000 |
| 123 | 880(F) 8878 |
DRUMS | 50,250 | SD |
$0.1500 |
$0.0200 |
$0.0500 |
$0.0200 |
$0.0300 |
$0.0200 |
$0.0300 |
$0.0300 |
| 124 | 612(A) 0641 |
MANHOLES ADJUST TO GRADE | 2 | EA |
$533.48 |
$372.75 |
$945.00 |
$531.76 |
$1,000.00 |
$515.00 |
$511.16 |
$1,100.00 |
| 125 | 612(E) 0647 |
VALVE BOXES ADJUST TO GRADE | 2 | EA |
$200.00 |
$2,454.28 |
$368.00 |
$106.35 |
$750.00 |
$154.50 |
$153.35 |
$590.00 |
| 126 | 616 5010 |
(PL) IRRIGATION SYSTEM | 1 | LSUM |
$1,000.00 |
$1,200.00 |
$525.00 |
$531.76 |
$10,000.00 |
$1,030.00 |
$1,533.46 |
$3,000.00 |