Bid tab 120013

Let Jan 19, 2012 · Division 7 · Comanche Sign up free

‹ Jan 2012 results

BRIDGE AND APPROACHES SH -17: OVER BEAVER CREEK AND A TRIBUTARY OF BEAVER CREEK 1.1 MILE EAST OF SH -65 IN STERLING. PROJECT LENGTH = 0.813 MILES

Let date
Thursday, January 19, 2012
Contract
120013
J/P numbers
20956(04)
District
Division 7
County
Comanche
Highway
Limits
BRIDGE AND APPROACHES SH -17: OVER BEAVER CREEK AND A TRIBUTARY OF BEAVER CREEK 1.1 MILE EAST OF SH -65 IN STERLING. PROJECT LENGTH = 0.813 MILES
Project number
BRFY-116C(098)

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$3,983,334
1 T & G CONSTRUCTION, INC. Low bidder $3,898,377 -2.1%
2 OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV) $3,961,962 -0.5% +1.6%
3 K & R BUILDERS, INC. $4,380,931 +10.0% +12.4%
4 EARTH BUILDERS, L.P. $4,757,989 +19.4% +22.1%

Bid tab: unit prices 120 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 T & G CONSTRUCT…#2 OBC, INC./PLAIN…#3 K & R BUILDERS,…#4 EARTH BUILDERS,…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $10,000.00 $10,000.00 $21,000.00 $93,000.00 $100,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION27,068CY $4.00 $3.75 $5.75 $5.25 $10.00
3202(D) 0184 UNCLASSIFIED BORROW16,321CY $6.00 $6.00 $6.85 $6.50 $10.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $20,000.00 $10,000.00 $12,600.00 $27,500.00 $10,000.00
5221(C) 2801 TEMPORARY SILT FENCE1,852LF $2.25 $1.25 $1.31 $1.76 $1.50
6221(D) 2803 TEMPORARY SEDIMENT FILTER2EA $300.00 $300.00 $315.00 $220.00 $300.00
7221(F) 0100 TEMPORARY SILT DIKE1,750LF $6.00 $6.25 $6.56 $7.70 $10.00
8221(G) 0150 TEMPORARY ROCK FILTER DAM TYPE 150.4CY $600.00 $700.00 $63.00 $66.00 $100.00
9230(A) 2806 SOLID SLAB SODDING40,705SY $1.50 $0.9900 $1.04 $1.40 $1.25
10232(B) 2814 SEEDING METHOD B8.5AC $300.00 $315.00 $330.75 $400.00 $800.00
11233(A) 2817 VEGETATIVE MULCHING8.5AC $300.00 $300.00 $315.00 $400.00 $700.00
12241 2832 MOWING17AC $70.00 $100.00 $73.50 $100.00 $80.00
13303(A) 2100 AGGREGATE BASE TYPE A4,767CY $40.00 $35.00 $43.15 $40.00 $45.00
14307(A) 4200 FLY ASH1,168.4TON $55.00 $70.00 $69.75 $75.90 $100.00
15307(E) 4240 CEMENTITIOUS STABILIZED SUBGRADE21,637SY $4.00 $3.00 $2.83 $3.33 $3.00
16325 5271 SEPARATOR FABRIC19,400SY $2.50 $1.50 $1.60 $2.00 $1.00
17402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E1,628TON $28.00 $20.00 $18.65 $22.54 $25.00
18407(B) 0250 TACK COAT2,396GAL $3.50 $3.00 $1.57 $3.30 $4.00
19408 5774 PRIME COAT12,184GAL $6.00 $6.00 $2.10 $6.60 $6.00
20411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)8,045.8TON $70.00 $68.00 $69.30 $74.80 $80.00
21411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)2,884.5TON $75.00 $73.00 $79.80 $80.30 $80.00
22413(A) 4861 RUMBLE STRIP-METHOD HMA-CON7,450LF $1.00 $1.10 $0.2300 $3.00 $0.5000
23509(A) 0319 CLASS AA CONCRETE27CY $400.00 $300.00 $640.38 $600.00 $500.00
24509(C) 0322 CLASS A CONCRETE, SMALL STRUCTURES2CY $550.00 $400.00 $1,161.99 $900.00 $500.00
25509(D) 0325 CLASS C CONCRETE24CY $250.00 $260.00 $427.60 $600.00 $300.00
26511(A) 0332 REINFORCING STEEL3,918LB $1.20 $0.8500 $1.60 $1.17 $1.00
27610(B) 0604 6" CONCRETE DRIVEWAY300.2SY $50.00 $40.00 $66.15 $78.00 $40.00
28611(G) 5387 INLET CDI RCB DES. 12EA $3,000.00 $4,000.00 $2,253.85 $2,850.00 $7,500.00
29611(L) 0487 JUNCTION BOXES70CF $60.00 $55.00 $36.75 $100.00 $100.00
30613(B) 0670 21" CORR. GALV. STEEL PIPE90LF $30.00 $22.00 $21.00 $24.00 $50.00
31613(B) 0689 18" CORR. GALV. STEEL PIPE536LF $25.00 $21.00 $18.90 $21.00 $40.00
32613(B) 0692 36" CORR. GALV. STEEL PIPE34LF $40.00 $40.00 $31.50 $40.00 $60.00
33613(B) 4529 35" X 24" CORR. GALV. STEEL PIPE ARCH168LF $40.00 $38.00 $29.40 $46.00 $100.00
34613(H) 0500 8" PERFORATED PIPE UNDERDRAIN ROUND600LF $10.00 $15.00 $10.50 $24.00 $10.00
35613(I) 1097 8" NON-PERF.PIPE UNDERDRAIN RND.200LF $10.00 $15.00 $10.50 $24.00 $10.00
36613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND22EA $250.00 $200.00 $131.25 $215.00 $1,000.00
37613(M) 7202 TYPE BB6 CULVERT END TREATMENT2EA $1,500.00 $3,000.00 $1,728.83 $2,200.00 $1,000.00
38613(Q) 5946 OUTLET LATERAL HEADWALL2EA $750.00 $1,000.00 $638.13 $750.00 $2,500.00
39619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $15,000.00 $18,000.00 $3,150.00 $17,000.00 $1,000.00
40619(B) 4728 REMOVAL OF ASPHALT PAVEMENT16,466SY $3.00 $2.50 $2.10 $5.03 $2.50
41619(C) 0924 SAWING PAVEMENT2,100LF $5.00 $5.00 $5.25 $5.00 $2.00
42623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE1,264LF $12.00 $14.37 $16.27 $16.53 $21.00
43623(G) 8571 GUARDRAIL END TREATMENT (GET)8EA $2,200.00 $2,100.00 $2,147.25 $2,415.00 $2,100.00
44623(I) 8675 GUARDRAIL BRIDGE CONNECTION-TYPE A8EA $1,500.00 $1,475.00 $1,328.25 $1,696.00 $2,000.00
45624(A) 4281 FENCE-STYLE WWF563LF $4.00 $6.00 $4.06 $5.00 $9.00
46624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)873LF $4.00 $6.00 $3.80 $5.00 $6.00
47629(A) 4958 MAILBOX INSTALLATION-SINGLE2EA $85.00 $70.00 $73.50 $90.00 $100.00
48629(C) 4960 MAILBOX2EA $130.00 $25.00 $26.25 $40.00 $75.00
49629(D) 4961 REMOVAL OF MAILBOX INSTALLATION2EA $15.00 $10.00 $10.50 $15.00 $50.00
50501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON198CY $15.00 $10.00 $21.60 $8.25 $50.00
51501(G) 6309 CLSM BACKFILL252CY $120.00 $140.00 $129.60 $131.25 $300.00
52503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)749.3LF $180.00 $190.00 $187.45 $182.00 $275.00
53504(A) 1304 APPROACH SLAB377SY $150.00 $160.00 $143.90 $165.00 $60.00
54504(B) 1305 SAW-CUT GROOVING1,206.1SY $4.00 $4.00 $3.89 $4.00 $5.00
55504(C) 6250 SEALED EXPANSION JOINT48.8LF $250.00 $350.00 $317.46 $270.00 $200.00
56504(D) 6245 CONCRETE RAIL (TR4)544.8LF $65.00 $55.00 $75.06 $70.00 $100.00
57506(A) 1322 STRUCTURAL STEEL1,490LB $2.50 $2.50 $3.61 $2.75 $10.00
58507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY16EA $3,000.00 $2,800.00 $2,955.84 $3,000.00 $2,500.00
59507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY8EA $3,000.00 $2,850.00 $2,984.93 $3,000.00 $2,500.00
60509(A) 1326 CLASS AA CONCRETE224.4CY $450.00 $420.00 $431.88 $487.50 $500.00
61509(B) 1328 CLASS A CONCRETE202.8CY $400.00 $420.00 $439.19 $512.50 $500.00
62511(A) 1332 REINFORCING STEEL630LB $0.9000 $1.00 $1.72 $1.15 $1.00
63511(B) 6010 EPOXY COATED REINFORCING STEEL90,560LB $1.00 $1.10 $1.07 $1.05 $1.00
64514(A) 6010 PILES, FURNISHED (HP 10X42)166LF $30.00 $30.00 $27.67 $25.20 $30.00
65514(A) 6011 PILES, FURNISHED (HP 12X53)684LF $35.00 $34.00 $34.30 $30.80 $30.00
66514(B) 6292 PILES, DRIVEN (HP 10X42)166LF $15.00 $15.00 $10.80 $10.80 $30.00
67514(B) 6294 PILES, DRIVEN (HP 12X53)684LF $15.00 $15.00 $10.80 $13.20 $30.00
68515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)972.5SY $4.00 $4.00 $3.24 $4.00 $5.00
69516(A) 6096 DRILLED SHAFTS 60" DIAMETER168LF $600.00 $900.00 $863.00 $710.00 $400.00
70523(A) 6550 SEALER CRACK PREPARATION48LF $5.00 $3.00 $3.24 $5.00 $5.00
71523(B) 6560 SEALER RESIN0.6GAL $200.00 $150.00 $91.80 $200.00 $250.00
72601(B) 1353 TYPE I-A PLAIN RIPRAP1,964TON $30.00 $31.00 $31.15 $28.25 $45.00
73601(C) 1355 TYPE I-A FILTER BLANKET355TON $30.00 $31.00 $24.57 $22.25 $30.00
74613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND96LF $25.00 $50.00 $34.87 $25.00 $10.00
75613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.95LF $25.00 $50.00 $23.24 $25.00 $10.00
76619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $15,000.00 $20,000.00 $14,000.00 $17,250.00 $50,000.00
77501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON254CY $15.00 $10.00 $21.60 $8.25 $10.00
78501(G) 6309 CLSM BACKFILL316CY $120.00 $140.00 $129.58 $131.25 $100.00
79503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)506LF $180.00 $190.00 $179.29 $181.00 $275.00
80503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)338.7LF $190.00 $220.00 $201.98 $205.00 $300.00
81504(A) 1304 APPROACH SLAB447SY $150.00 $160.00 $145.11 $165.00 $50.00
82504(B) 1305 SAW-CUT GROOVING1,385.8SY $4.00 $4.00 $3.89 $4.00 $2.00
83504(C) 6250 SEALED EXPANSION JOINT58.3LF $250.00 $350.00 $329.10 $285.00 $200.00
84504(D) 6245 CONCRETE RAIL (TR4)625.6LF $65.00 $55.00 $75.06 $70.00 $100.00
85506(A) 1322 STRUCTURAL STEEL1,560LB $2.50 $2.50 $3.61 $2.75 $10.00
86507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY16EA $3,000.00 $2,900.00 $2,990.75 $3,000.00 $2,500.00
87507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY8EA $3,000.00 $2,900.00 $3,065.23 $3,000.00 $2,500.00
88509(A) 1326 CLASS AA CONCRETE256.9CY $450.00 $420.00 $421.08 $487.50 $500.00
89509(B) 1328 CLASS A CONCRETE270.9CY $400.00 $420.00 $417.59 $512.50 $500.00
90511(A) 1332 REINFORCING STEEL540LB $0.9000 $1.00 $1.72 $1.15 $1.00
91511(B) 6010 EPOXY COATED REINFORCING STEEL108,540LB $1.00 $1.10 $1.06 $1.05 $1.00
92514(A) 6010 PILES, FURNISHED (HP 10X42)138LF $30.00 $30.00 $28.57 $25.20 $30.00
93514(A) 6011 PILES, FURNISHED (HP 12X53)671LF $35.00 $34.00 $34.34 $30.80 $30.00
94514(B) 6292 PILES, DRIVEN (HP 10X42)138LF $15.00 $10.00 $10.80 $10.80 $30.00
95514(B) 6294 PILES, DRIVEN (HP 12X53)671LF $15.00 $10.00 $10.80 $13.20 $30.00
96515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,171SY $4.00 $4.00 $3.24 $4.00 $5.00
97516(A) 6096 DRILLED SHAFTS 60" DIAMETER136LF $600.00 $900.00 $879.66 $725.00 $400.00
98523(A) 6550 SEALER CRACK PREPARATION57LF $5.00 $3.00 $3.24 $5.00 $5.00
99523(B) 6560 SEALER RESIN0.7GAL $200.00 $150.00 $91.80 $200.00 $250.00
100601(B) 1353 TYPE I-A PLAIN RIPRAP1,998TON $30.00 $31.00 $31.15 $28.25 $45.00
101601(C) 1355 TYPE I-A FILTER BLANKET417TON $30.00 $31.00 $24.58 $22.25 $30.00
102613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND114LF $25.00 $50.00 $35.99 $25.00 $10.00
103613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.66LF $25.00 $50.00 $23.99 $25.00 $10.00
104619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $15,000.00 $20,000.00 $14,000.00 $18,250.00 $50,000.00
105805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS14EA $150.00 $90.00 $94.50 $110.00 $100.00
106855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)17,200LF $1.00 $0.3700 $0.3900 $0.4500 $0.7500
107857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)7,560LF $0.2000 $0.1600 $0.1700 $0.2200 $0.5000
108857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)6,400LF $0.7000 $0.8000 $0.8400 $1.00 $1.00
109857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)3,100LF $0.4000 $0.2500 $0.2600 $0.3000 $0.7500
110880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF2,940SD $0.6000 $0.5500 $0.5800 $0.6500 $1.00
111880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF3,360SD $0.7500 $0.5500 $0.5800 $0.6500 $0.2500
112880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF4,620SD $1.50 $0.5500 $0.5800 $0.6500 $1.00
113880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)2,310SD $0.5000 $0.0200 $0.0200 $0.0400 $1.00
114880(C) 8848 WING BARRICADES840SD $1.00 $1.00 $1.05 $1.20 $1.00
115880(E) 8860 WARNING LIGHTS(TYPE A)4,620SD $0.1500 $0.4500 $0.4800 $0.5500 $0.2500
116880(F) 8878 DRUMS15,120SD $0.3000 $0.0200 $0.0200 $0.0400 $0.2500
117642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $30,000.00 $30,000.00 $28,218.75 $42,000.00 $10,000.00
118220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $8,000.00 $2,625.00 $6,000.00 $10,000.00
119640(A) 1398 FIELD OFFICE1EA $5,000.00 $5,000.00 $7,192.50 $10,000.00 $10,000.00
120641 1399 MOBILIZATION1LSUM $215,000.00 $110,000.00 $165,000.00 $225,000.00 $250,000.00