| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$15,000.00 |
$8,000.00 |
$15,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 29,289 | CY |
$5.00 |
$4.30 |
$4.30 |
$3.75 |
$3.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 26,297 | CY |
$7.00 |
$5.70 |
$5.70 |
$6.00 |
$6.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$10,000.00 |
$25,000.00 |
$30,000.00 |
$20,000.00 |
| 5 | 221(B) 2801 |
TEMPORARY BALE BARRIER | 875 | LF |
$8.00 |
$4.00 |
$4.00 |
$4.00 |
$9.50 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 7,028 | LF |
$2.00 |
$1.80 |
$1.80 |
$1.80 |
$1.12 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 875 | LF |
$8.00 |
$5.00 |
$7.00 |
$7.00 |
$8.55 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 54,189 | SY |
$2.50 |
$1.30 |
$1.30 |
$1.30 |
$1.49 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 11.2 | AC |
$400.00 |
$400.00 |
$600.00 |
$600.00 |
$599.00 |
| 10 | 241 2832 |
MOWING | 42 | AC |
$80.00 |
$30.00 |
$50.00 |
$50.00 |
$69.00 |
| 11 | 307(A) 4200 |
FLY ASH | 1,491.5 | TON |
$70.00 |
$59.00 |
$64.00 |
$70.00 |
$59.00 |
| 12 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 27,618.8 | SY |
$3.50 |
$1.65 |
$3.25 |
$3.00 |
$1.65 |
| 13 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 18.1 | TON |
$40.00 |
$50.00 |
$65.00 |
$38.00 |
$150.00 |
| 14 | 407(B) 0250 |
TACK COAT | 7,885 | GAL |
$3.00 |
$3.50 |
$3.64 |
$3.50 |
$3.50 |
| 15 | 408 5774 |
PRIME COAT | 5,694 | GAL |
$4.50 |
$5.50 |
$5.00 |
$5.50 |
$5.50 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 9,967.8 | TON |
$67.00 |
$85.00 |
$82.00 |
$85.00 |
$85.00 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,204.8 | TON |
$78.00 |
$97.00 |
$90.00 |
$97.00 |
$97.00 |
| 18 | 412 5267 |
COLD MILLING PAVEMENT | 4,609 | SY |
$6.00 |
$5.50 |
$2.50 |
$2.75 |
$2.98 |
| 19 | 509(A) 0319 |
CLASS AA CONCRETE | 38.02 | CY |
$600.00 |
$480.00 |
$897.00 |
$403.00 |
$1,100.00 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 24.7 | CY |
$295.00 |
$320.00 |
$692.00 |
$335.00 |
$400.00 |
| 21 | 511(A) 0332 |
REINFORCING STEEL | 6,046 | LB |
$1.00 |
$1.16 |
$0.8000 |
$0.5000 |
$1.30 |
| 22 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 2 | EA |
$2,200.00 |
$2,000.00 |
$3,000.00 |
$3,450.00 |
$4,500.00 |
| 23 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 98 | LF |
$39.99 |
$25.00 |
$35.00 |
$45.00 |
$90.00 |
| 24 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 183 | LF |
$80.00 |
$65.00 |
$65.00 |
$85.00 |
$150.00 |
| 25 | 613(A) 4504 |
19" X 30" R.C.PIPE ELLIPTICAL CLASS HE-III | 160 | LF |
$100.00 |
$60.00 |
$70.00 |
$80.00 |
$130.00 |
| 26 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 902 | LF |
$30.00 |
$17.00 |
$24.00 |
$25.00 |
$50.00 |
| 27 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 4 | EA |
$1,000.00 |
$1,500.00 |
$2,500.00 |
$1,500.00 |
$2,500.00 |
| 28 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,100.00 |
$1,850.00 |
$3,600.00 |
$2,000.00 |
$2,900.00 |
| 29 | 613(M) 7202 |
TYPE BB6 CULVERT END TREATMENT | 4 | EA |
$1,200.00 |
$2,400.00 |
$4,700.00 |
$3,620.00 |
$4,100.00 |
| 30 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$9,500.00 |
$15,000.00 |
$25,000.00 |
$30,000.00 |
| 31 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,947 | SY |
$4.00 |
$3.00 |
$3.25 |
$6.00 |
$15.00 |
| 32 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 11,955 | SY |
$5.00 |
$4.00 |
$4.25 |
$7.00 |
$8.00 |
| 33 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 838 | LF |
$3.00 |
$3.00 |
$2.50 |
$2.50 |
$2.75 |
| 34 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,018.75 | LF |
$16.00 |
$16.50 |
$15.10 |
$15.10 |
$15.10 |
| 35 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,500.00 |
$2,100.00 |
$2,075.00 |
$2,075.00 |
$2,075.00 |
| 36 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$1,500.00 |
$1,300.00 |
$1,265.00 |
$1,265.00 |
$1,256.00 |
| 37 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 9,451 | LF |
$5.00 |
$4.20 |
$3.75 |
$3.42 |
$3.95 |
| 38 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$25.00 |
$20.00 |
$18.00 |
$15.00 |
$40.00 |
| 39 | 501(G) 6309 |
CLSM BACKFILL | 164 | CY |
$150.00 |
$140.00 |
$135.00 |
$135.00 |
$130.00 |
| 40 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 637 | LF |
$175.00 |
$205.00 |
$230.00 |
$210.00 |
$240.00 |
| 41 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$180.00 |
$165.00 |
$150.00 |
$150.00 |
$170.00 |
| 42 | 504(B) 1305 |
SAW-CUT GROOVING | 935.7 | SY |
$4.00 |
$6.00 |
$5.00 |
$4.05 |
$3.60 |
| 43 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 417 | LF |
$90.00 |
$65.00 |
$65.00 |
$75.00 |
$70.00 |
| 44 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$4.00 |
$2.75 |
$3.50 |
$2.50 |
$1.40 |
| 45 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$800.00 |
$385.00 |
$300.00 |
$700.00 |
$450.00 |
| 46 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,500.00 |
$1,850.00 |
$2,200.00 |
$2,500.00 |
$2,500.00 |
| 47 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$650.00 |
$500.00 |
$500.00 |
$190.00 |
$300.00 |
| 48 | 509(A) 1326 |
CLASS AA CONCRETE | 220.6 | CY |
$450.00 |
$525.00 |
$375.00 |
$435.00 |
$600.00 |
| 49 | 509(B) 1328 |
CLASS A CONCRETE | 130 | CY |
$425.00 |
$525.00 |
$425.00 |
$435.00 |
$780.00 |
| 50 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 66,770 | LB |
$1.25 |
$1.02 |
$1.20 |
$1.00 |
$1.20 |
| 51 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 417 | LF |
$35.00 |
$50.00 |
$30.00 |
$21.70 |
$30.00 |
| 52 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 417 | LF |
$20.00 |
$6.00 |
$10.00 |
$20.00 |
$20.00 |
| 53 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 822 | SY |
$4.00 |
$5.50 |
$4.00 |
$4.00 |
$3.50 |
| 54 | 516(A) 6095 |
DRILLED SHAFTS 54" DIAMETER | 184 | LF |
$650.00 |
$650.00 |
$550.00 |
$445.00 |
$600.00 |
| 55 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$5.00 |
$5.20 |
$4.00 |
$4.00 |
$4.00 |
| 56 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$250.00 |
$260.00 |
$150.00 |
$150.00 |
$150.00 |
| 57 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 340 | TON |
$50.00 |
$47.00 |
$55.00 |
$55.00 |
$62.00 |
| 58 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 76 | TON |
$45.00 |
$42.00 |
$50.00 |
$45.00 |
$56.00 |
| 59 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$25.00 |
$23.00 |
$25.00 |
$25.00 |
$60.00 |
| 60 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$25.00 |
$23.00 |
$25.00 |
$20.00 |
$30.00 |
| 61 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$28,000.00 |
$30,000.00 |
$20,000.00 |
$20,000.00 |
| 62 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$60.00 |
$50.00 |
$50.00 |
$50.00 |
$50.00 |
| 63 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 15 | EA |
$200.00 |
$150.00 |
$150.00 |
$150.00 |
$150.00 |
| 64 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 18,392 | LF |
$0.7000 |
$0.8000 |
$0.8000 |
$0.8000 |
$0.8000 |
| 65 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 3 | EA |
$400.00 |
$200.00 |
$200.00 |
$200.00 |
$200.00 |
| 66 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 30,800 | LF |
$0.3000 |
$0.2000 |
$0.2000 |
$0.2000 |
$0.2000 |
| 67 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 3,000 | EA |
$1.00 |
$0.7500 |
$0.7500 |
$0.7500 |
$0.7500 |
| 68 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 18,600 | LF |
$0.5000 |
$0.2000 |
$0.2000 |
$0.2000 |
$0.2000 |
| 69 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,740 | SD |
$0.6000 |
$0.2500 |
$0.2500 |
$0.2500 |
$0.2500 |
| 70 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 60 | SD |
$1.00 |
$2.00 |
$2.00 |
$2.00 |
$2.00 |
| 71 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,220 | SD |
$1.50 |
$1.00 |
$1.00 |
$1.00 |
$1.00 |
| 72 | 880(C) 8848 |
WING BARRICADES | 1,440 | SD |
$1.00 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1000 |
| 73 | 880(D) 8854 |
VERTICAL PANELS | 16,200 | SD |
$0.7500 |
$0.1500 |
$0.1500 |
$0.1500 |
$0.1500 |
| 74 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,400 | SD |
$0.2500 |
$0.1500 |
$0.1500 |
$0.1500 |
$0.1500 |
| 75 | 880(F) 8878 |
DRUMS | 4,500 | SD |
$0.5000 |
$0.1500 |
$0.1500 |
$0.1500 |
$0.1500 |
| 76 | 880(G) 8890 |
CHANNELIZER CONES | 22,020 | SD |
$0.3500 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1000 |
| 77 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 30 | SD |
$30.00 |
$50.00 |
$50.00 |
$50.00 |
$50.00 |
| 78 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$20,000.00 |
$30,000.00 |
$18,000.00 |
$20,000.00 |
| 79 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$5,500.00 |
$15,000.00 |
$8,000.00 |
$1,500.00 |
| 80 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$149,477.00 |
$214,500.00 |
$178,200.00 |
$200,000.00 |
$178,250.00 |
| 81 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$10,000.00 |
$8,500.00 |
$50,000.00 |
$65,000.00 |
$8,000.00 |