Bid tab 110441

Let Sep 15, 2011 · Division 8 · Nowata Sign up free

‹ Sep 2011 results

BRIDGE REHABILITATION US -169: OVER CALIFORNIA CREEK , 3.5 MILES NORTH OF THE US -60 JUNCTION. PROJECT LENGTH = 0.275 MILES

Let date
Thursday, September 15, 2011
Contract
110441
J/P numbers
23129(04)
District
Division 8
County
Nowata
Highway
Limits
BRIDGE REHABILITATION US -169: OVER CALIFORNIA CREEK , 3.5 MILES NORTH OF THE US -60 JUNCTION. PROJECT LENGTH = 0.275 MILES
Project number
BRFY-153N(147)

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$3,309,812
1 BECCO CONTRACTORS, INC. Low bidder $3,277,995 -1.0%
3 OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV) $3,516,857 +6.3% +7.3%
4 APAC-CENTRAL, INC. $4,115,115 +24.3% +25.5%

Bid tab: unit prices 103 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BECCO CONTRACTO…#3 OBC, INC./PLAIN…#4 APAC-CENTRAL, I…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $5,000.00 $20,000.00 $5,390.00 $38,191.91
2202(A) 0183 UNCLASSIFIED EXCAVATION4,503CY $5.20 $9.00 $5.50 $26.87
3202(D) 0184 UNCLASSIFIED BORROW2,881CY $10.00 $14.00 $6.60 $20.66
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $15,000.00 $10,000.00 $11,863.64 $29,350.06
5221(C) 2801 TEMPORARY SILT FENCE2,399LF $2.00 $2.00 $2.20 $2.19
6221(F) 0100 TEMPORARY SILT DIKE63LF $8.00 $8.00 $11.00 $10.05
7221(H) 0450 (PL)TEMPORARY INLET SEDIMENT FILTER1EA $200.00 $50.00 $550.00 $168.39
8230(A) 2806 SOLID SLAB SODDING15,553SY $2.50 $1.75 $1.98 $2.19
9232(B) 2814 SEEDING METHOD B12.3AC $400.00 $500.00 $660.00 $842.02
10233(A) 2817 VEGETATIVE MULCHING12.3AC $400.00 $500.00 $550.00 $892.54
11241 2832 MOWING24.6AC $60.00 $65.00 $77.00 $61.75
12303(A) 2100 AGGREGATE BASE TYPE A2,176CY $38.00 $48.00 $41.38 $40.14
13307(D) 4230 LIME304TON $160.00 $150.00 $169.98 $164.88
14307(H) 4270 LIME STABILIZED SUBGRADE16,830SY $4.50 $3.00 $4.61 $4.47
15325 5271 SEPARATOR FABRIC14,801SY $1.50 $1.50 $1.79 $1.74
16402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E2,298TON $25.00 $26.00 $35.40 $34.33
17407(B) 0250 TACK COAT174GAL $6.00 $2.00 $2.61 $2.53
18408 5774 PRIME COAT5,346GAL $5.00 $2.00 $6.48 $6.28
19411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)485TON $80.00 $64.00 $74.97 $72.72
20411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)1,314TON $85.00 $78.00 $86.89 $84.28
21414(A) 0210 P.C.CONCRETE PAVEMENT(PLACEMENT)6,144SY $13.00 $15.00 $21.80 $21.16
22414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )6,559SY $16.00 $25.00 $20.41 $19.80
23414(G) 5275 P.C. CONCRETE FOR PAVEMENT3,036CY $100.00 $100.00 $128.93 $125.06
24613(A) 4495 22" X 13" R.C.PIPE ARCH CLASS A-III660LF $60.00 $90.00 $45.44 $61.78
25613(H) 0450 6" PERFORATED PIPE UNDERDRAIN ROUND188LF $10.00 $40.00 $12.76 $22.89
26613(I) 1096 6" NON-PERF.PIPE UNDERDRAIN RND.63LF $20.00 $25.00 $13.34 $29.93
27613(O) 4800 SPECIAL END SECTION OF 22" X 13" RCP ARCH2EA $900.00 $900.00 $1,311.48 $1,856.43
28613(Q) 5946 OUTLET LATERAL HEADWALL2EA $400.00 $750.00 $476.44 $1,144.14
29619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $4,500.00 $20,000.00 $5,390.00 $10,708.29
30619(B) 4727 REMOVAL OF CONCRETE PAVEMENT2,165SY $7.00 $10.00 $7.30 $8.44
31619(B) 4728 REMOVAL OF ASPHALT PAVEMENT27SY $5.00 $10.00 $11.00 $18.73
32619(B) 4763 REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY10,095SY $8.00 $10.00 $3.30 $9.61
33619(B) 4780 REMOVAL OF GUARDRAIL2,552LF $2.50 $3.50 $2.20 $3.65
34619(C) 0924 SAWING PAVEMENT3,016LF $3.50 $2.00 $3.58 $3.87
35623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE2,875LF $18.00 $16.00 $16.23 $16.84
36623(F) 4447 GUARDRAIL ANCHOR UNIT (TYPE B)2EA $900.00 $450.00 $660.00 $617.48
37623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,000.00 $2,100.00 $2,304.50 $2,526.06
38623(I) 8675 GUARDRAIL BRIDGE CONNECTION-TYPE A6EA $1,700.00 $1,500.00 $1,441.00 $1,684.04
39624(C) 4457 FENCE-STYLE SWF (3 BARBED WIRE)403LF $4.00 $7.00 $6.82 $8.85
40501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON122CY $20.00 $20.00 $22.00 $30.64
41501(G) 6309 CLSM BACKFILL162CY $150.00 $100.00 $134.90 $105.85
42504(A) 1304 APPROACH SLAB273.4SY $160.00 $150.00 $135.65 $189.42
43504(B) 1305 SAW-CUT GROOVING1,351SY $5.00 $3.50 $3.47 $3.51
44504(C) 6250 SEALED EXPANSION JOINT84LF $200.00 $250.00 $331.51 $328.69
45504(E) 6190 42" F-SHAPED PARAPET639.4LF $70.00 $90.00 $70.18 $76.88
46506(A) 1322 STRUCTURAL STEEL59,490LB $2.00 $1.90 $1.96 $3.34
47507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY1EA $2,000.00 $2,500.00 $3,426.82 $5,571.03
48507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY3EA $2,500.00 $2,500.00 $3,426.82 $5,571.04
49509(A) 1326 CLASS AA CONCRETE289CY $550.00 $600.00 $450.00 $729.81
50509(B) 1328 CLASS A CONCRETE54.1CY $450.00 $900.00 $450.00 $835.66
51509(D) 1331 CLASS C CONCRETE32.5CY $400.00 $400.00 $400.00 $557.10
52511(A) 1332 REINFORCING STEEL380LB $1.00 $1.00 $1.69 $3.62
53511(B) 6010 EPOXY COATED REINFORCING STEEL106,450LB $1.10 $1.00 $1.09 $1.11
54512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $115,500.00 $25,000.00 $98,188.46 $100,278.64
55512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $33,010.00 $1,200.00 $94,740.80 $96,936.01
56514(A) 6010 PILES, FURNISHED (HP 10X42)208LF $30.00 $30.00 $26.03 $33.43
57514(B) 6292 PILES, DRIVEN (HP 10X42)208LF $15.00 $60.00 $11.00 $16.71
58515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)691SY $4.00 $4.00 $3.85 $3.90
59516(A) 6096 DRILLED SHAFTS 60" DIAMETER41LF $800.00 $1,000.00 $931.47 $935.93
60523(A) 6550 SEALER CRACK PREPARATION164LF $4.00 $4.00 $4.40 $4.46
61523(B) 6560 SEALER RESIN1.81GAL $150.00 $110.00 $110.00 $111.43
62613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND82LF $10.00 $40.00 $24.05 $33.43
63613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.50LF $25.00 $25.00 $24.93 $33.43
64619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $20,000.00 $37,000.00 $51,590.00 $49,025.11
65501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON122CY $20.00 $20.00 $22.00 $30.64
66501(G) 6309 CLSM BACKFILL162CY $150.00 $100.00 $134.90 $105.85
67504(A) 1304 APPROACH SLAB273.4SY $160.00 $150.00 $135.65 $189.42
68504(B) 1305 SAW-CUT GROOVING1,351SY $5.00 $3.50 $3.47 $3.51
69504(C) 6250 SEALED EXPANSION JOINT84LF $200.00 $250.00 $331.51 $328.69
70504(E) 6190 42" F-SHAPED PARAPET639.4LF $70.00 $90.00 $70.18 $76.88
71506(A) 1322 STRUCTURAL STEEL59,490LB $2.00 $1.90 $1.96 $3.34
72507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY1EA $2,000.00 $2,500.00 $3,426.82 $5,571.03
73507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY3EA $2,500.00 $2,500.00 $3,426.82 $5,571.04
74509(A) 1326 CLASS AA CONCRETE289CY $550.00 $600.00 $450.00 $729.81
75509(B) 1328 CLASS A CONCRETE54.1CY $450.00 $900.00 $450.00 $835.66
76509(D) 1331 CLASS C CONCRETE32.5CY $400.00 $400.00 $400.00 $557.10
77510(D) 6341 MSE RETAINING WALL72SY $500.00 $250.00 $919.33 $1.11
78511(A) 1332 REINFORCING STEEL410LB $1.00 $1.00 $1.69 $3.62
79511(B) 6010 EPOXY COATED REINFORCING STEEL106,560LB $1.10 $1.00 $1.09 $1.11
80512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $115,500.00 $25,000.00 $98,188.46 $100,278.64
81512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $33,010.00 $1,200.00 $94,740.80 $96,936.01
82514(A) 6010 PILES, FURNISHED (HP 10X42)208LF $30.00 $30.00 $26.03 $33.43
83514(B) 6292 PILES, DRIVEN (HP 10X42)208LF $15.00 $60.00 $11.00 $16.71
84515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)691SY $4.00 $4.00 $3.85 $3.90
85516(A) 6096 DRILLED SHAFTS 60" DIAMETER40LF $800.00 $1,000.00 $935.48 $935.93
86523(A) 6550 SEALER CRACK PREPARATION164LF $4.00 $4.00 $4.40 $4.46
87523(B) 6560 SEALER RESIN1.81GAL $150.00 $110.00 $110.00 $111.43
88613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND82LF $10.00 $40.00 $24.05 $33.43
89613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.50LF $25.00 $25.00 $24.93 $33.43
90619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $20,000.00 $37,000.00 $51,590.00 $49,025.11
91413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC16,000LF $0.3200 $0.3500 $0.2200 $0.1100
92855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)7,200LF $0.4400 $1.65 $1.65 $1.68
93871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.120SD $7.06 $5.50 $5.50 $5.61
94876(A) 8482 (PL)TRUCK MOUNTED ATTENUATOR120SD $22.00 $28.00 $27.50 $28.07
95877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,000LF $12.00 $35.00 $25.30 $1.12
96877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER1,000LF $3.00 $10.00 $5.50 $1.12
97878(B) 8487 MODULAR GLARE SCREEN (TEMPORARY)9,600SD $0.2200 $0.0200 $0.0300 $0.0200
98880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $15,000.00 $50,000.00 $23,100.00 $23,576.51
99882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN240SD $28.00 $35.00 $33.00 $33.68
100642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $50,000.00 $20,000.00 $26,400.00 $23,576.51
101220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $5,000.00 $4,400.00 $7,996.43
102640(A) 1398 FIELD OFFICE1EA $7,000.00 $7,000.00 $6,600.00 $14,350.29
103641 1399 MOBILIZATION1LSUM $218,450.00 $185,000.00 $167,400.00 $151,974.00